Pey Jal Nigam Uttarakhand Tender

View complete overview of Uttarakhand Pey Jal Nigam Uttarakhand Tender

Pey Jal Nigam Uttarakhand Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date7 Mar 2024
Closing Date23 Apr 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Implementation of the Health and Safety Plan: Meetings, health care centre, medical check‑ups, emergencies and evacuations, safety protective equipment, hygiene; In compliance with the ESHS Specifications.

1

-

-

... More
Accommodation, drinking water, meals and transportation of staff: In compliance with Clause nos. 44, 45 & 46 of the ESHS Specifications of Part A2 of the Specification.

-

-

-

... More
Accommodation

1

-

-

... More
Meals

1

-

-

... More
Transport

1

-

-

... More
Training and local recruitment management: In compliance Clause nos. 8 & 43 of the ESHS Specifications of Part A2 of the Specification.

1

-

-

... More
Protection of adjacent areas, biodiversity, prevention of erosion and wastewater management: In compliance with the ESHS Specifications.

1

-

-

... More
Traffic, noise and atmospheric emissions management, land take: In compliance with the ESHS Specifications.

1

-

-

... More
Waste and hazardous products management: In compliance with the ESHS Specifications.

1

-

-

... More
Vegetation clearing and site rehabilitation: In compliance with the ESHS Specifications.

1

-

-

... More
CIVIL WORKS OF GRAVITY SEWERAGE NETWORK

-

-

-

... More
SEWER LAYING

-

-

-

... More
SETTING-OUT SURVEY INCLUDING DRAWINGS:

-

-

-

... More
Surveying and levelling for the proposed alignment of pipe line by Total station method by engaging qualified Engineers with minimum qualification of B. E./B. Tech (Civil), Technical Assistant Grade - I & II, Mazdoor category - I, using the contractor-owned survey instruments, Special tools and plants vehicle hire charges, transportation, initial incidental charges such as jungle clearance etc. Preparation of Tree map and alignment plan, duly incorporating salient details, such as topographical features, permanent landmarks, bench marks etc. at appropriate points, alignment plans and longitudinal section plan at 30 m intervals in addition to other salient locations such as branches, bends, culverts, river crossing etc. with all field particulars in AutoCAD and submission of plan (3 sets), along with LF books with making all entries with certification by beyond qualified Engineers with soft copy and marking TBM stones at required places with bench mark registers soft copies (3 sets) and hard copies (5 sets) etc., complete as directed by Engineer

60.02

-

-

... More
DISMANTLING

-

-

-

... More
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately By Mechanical Means (including cutting at the edges of road surfaces to be dismantled). Breaking by excavator at the edges of road surfaces to be dismantled shall not be permitted. Bituminous Road (inclusive of Black Top surface layer, Water Bound Macadam (WBM) layer & Soling layer).

9994.98

-

-

... More
Dismantling of Cement Concrete Pavement: Dismantling of cement concrete pavement by mechanical means (including cutting at the edges of road surfaces to be dismantled) using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately. Breaking by excavator at the edges of road surfaces to be dismantled shall not be permitted.

15031.72

-

-

... More
Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer

923.33

-

-

... More
Removing all type of Existing Sewerage Pipes: Removing all type of Existing Sewerage Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works, including Tools & Plants, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres.

-

-

-

... More
Up to 600 mm dia

11012.08

-

-

... More
EARTH WORK (SEWER)

-

-

-

... More
Excavation below road top/ GL (GL to be reckoned as Existing Ground Level, hereafter) by manual or mechanical means for laying of sewers, manholes, Chambers, sumps etc. in soil including extra excavation below inverts, trimming and dressing of sides, levelling and back filling of trenches by excavated earth in 20 cm layers, watering and ramming, compacting the same conforming to MoRTH, including removal of surplus earth or other dismantled material up to a distance of 50 meters from the centre of trenches and lifts as below, stacking and spreading as directed, preparing the bed for laying of pipe/foundation, cleaning of site properly after completion of work etc. complete. Excavation by mechanical means shall be restricted up to 90 cm beyond invert levels at every point of excavation. Excavation from invert level to 90 cm beyond shall be done by manual means only.

-

-

-

... More
Earth work, excluding dewatering

-

-

-

... More
Ordinary Soil, excluding dewatering

-

-

-

... More
0 m to 1.5 m below GL

53486.83

-

-

... More
beyond 1.5 m to 3.0 m below GL

11824.47

-

-

... More
beyond 3.0 m to 4.5 m below GL

2033.41

-

-

... More
beyond 4.5 m to 6.0 m below GL

226.67

-

-

... More
Excavation in soil mixed with murrum, shingle, kankar, boulder excluding dewatering requiring use of specials Tools & Plants, if required.

-

-

-

... More
0 m to 1.5 m below GL

13371.71

-

-

... More
beyond 1.5 m to 3.0 m below GL

5067.63

-

-

... More
beyond 3.0 m to 4.5 m below GL

1355.6

-

-

... More
beyond 4.5 m to 6.0 m below GL

226.67

-

-

... More
Earth work in or under Water and/or Liquid Mud, including Pumping out Water, as required

-

-

-

... More
Excavation in Ordinary Soil, including dewatering

-

-

-

... More
0 m to 1.5 m below GL

6065.23

-

-

... More
beyond 1.5 m to 3.0 m below GL

1316.03

-

-

... More
beyond 3.0 m to 4.5 m below GL

508.36

-

-

... More
beyond 4.5 m to 6.0 m below GL

56.66

-

-

... More
Excavation in soil mixed with murrum, shingle, kankar and boulder, including dewatering requiring use of specials Tools & Plants, if required

-

-

-

... More
0 m to 1.5 m below GL

1516.31

-

-

... More
beyond 1.5 m to 3.0 m below GL

564.02

-

-

... More
beyond 3.0 m to 4.5 m below GL

338.91

-

-

... More
beyond 4.5 m to 6.0 m below GL

56.66

-

-

... More
Disposal of Rubbish

-

-

-

... More
Disposal of rubbish obtained from dismantling of road for a distance of 0 to 5 KM by mechanical means including its loading, unloading

8183.2

-

-

... More
Disposal of rubbish obtained from dismantling of road for a distance of 5 to 10 KM by mechanical means including its loading, unloading (inclusive of the distance from 0 to 5 KM)

8183.2

-

-

... More
Disposal of rubbish obtained from dismantling of road for a distance beyond 10 KM by mechanical means including its loading, unloading (inclusive of the distance from 0 to 10 KM)

1818.49

-

-

... More
Disposal of Earth

-

-

-

... More
Disposal of earth obtained from dismantling of road for a distance of 0 to 5 KM by mechanical means including its loading, unloading

5413.72

-

-

... More
Disposal of earth obtained from dismantling of road for a distance of 5 to 10 KM by mechanical means including its loading, unloading (inclusive of the distance from 0 to 5 KM)

5413.72

-

-

... More
Disposal of earth obtained from dismantling of road for a distance beyod 10 KM by mechanical means including its loading, unloading (inclusive of the distance from 0 to 10 KM)

1203.04

-

-

... More
Carriage by Manual Means up to 120 m: Disposal of excavated excess earth/rubbish away from the site including conveyance of material up to 120 m corresponding required lift, loading, unloading etc. complete as directed by the Engineer.

11052.14

-

-

... More
TIMBERING AND SHEET PILING WORK (For trenches deeper than 1.5 m: Providing of SHORING is mandatory, independent of soil type. Type of shoring to be as approved, instructed or determined by the Engineer)

-

-

-

... More
Provide & fixing of Open Timbering (covering 1/3rd of surface area by planks), in trenches for the following depths below ground level consisting of 40 mm thick approved country wood planks for poling board, 125 mm × 75 mm Indian country wood walers and 100 mm dia wooden ballies for struts at 1.50 m c/c interval including removal after laying of sewer both sides of trenches will be taken as one side for the purpose of payments & measurements i.e. area equals to length x depth of trenches. Dismantled timbering materials will be the property of the contractor.

-

-

-

... More
Depth up to 3.0 m below GL.

42791.77

-

-

... More
Provide & fixing of Close Timbering in trenches for the following depth below ground level consisting of 40 mm thick approved country wood planks for poling board, 125 mm x 75 mm Indian country wood walers and 100 mm dia country wood ballies for struts at 1.50 m interval including removal after laying of sewer (both sides of trenches will be taken as one side for the purpose of payments & measurements i.e. area equals to length x depth of trenches. Dismantled timbering materials will be property of the contractor.

-

-

-

... More
Depth up to 3.0 m below GL.

12959.02

-

-

... More
Beyond 3.0 m to 6.0 m below GL

4011.49

-

-

... More
Beyond 6.0 m below GL

445.72

-

-

... More
Extra for planking and strutting in close timbering, if required, to be left permanently in position. (face area of the timber permanently left to be measured) (N.B.: While allowing payment for retaining shoring, no payment for providing shoring vide item no. 14.02 beyond shall be made.)

-

-

-

... More
Beyond 3.0 m to 6.0 m below GL

44.19

-

-

... More
Beyond 6.0 m below GL

4.91

-

-

... More
Supplying, Driving & Extraction (after Job done) of M S sheet piles of any kind of approved type and size conforming to I.S. code in all kinds of soil/ soil mixed with gravel, shingle & pebbles, by suitable method including handling, cutting to requisite size, drilling holes, hoisting in position, welding, fabrication of sets of tapper piles, corner piles etc. with clutch bars as may be required including staging, scaffolding and hire charges of driving machinery and equipment, scraping and cleaning piles, painting the surface with one coat of surface primer of approved make and brand and two coats of ready mixed oil bound paint (except red lead and black Japan) etc. including all cost of labours, supply and carriage of equipment to site (by any mean) as per drawing and direction of the Engineer. (Note: Measurement shall be done according to the average depths applicable for particular sections of continuous sheet piling)

-

-

-

... More
0 to 3.0 m (applicable for particular sections whose average depths are between 0 to 3 m)

129.59

-

-

... More
0 to 4.0 m (applicable for particular sections whose average depths are between 3 to 4 m)

42.45

-

-

... More
0 to 5.0 m (applicable for particular sections whose average depths are between 4 to 5 m)

42.45

-

-

... More
0 to 6.0 m (applicable for particular sections whose average depths are between 5 to 6 m)

30

-

-

... More
BEDDING WORK

-

-

-

... More
Providing & Laying granular bedding with carefully compacted backfill using graded hard crusher broken stone (6 mm to 20 mm Graded) laying in layers not more than 150 mm. thick including ramming, compaction etc. complete for pipe bedding and surrounding as per Drawings & Specification. (Murrum is not permitted for bedding.)

-

-

-

... More
For DI K-7

-

-

-

... More
200 mm dia.

50578.61

-

-

... More
250 mm dia.

962.01

-

-

... More
300 mm dia.

475.32

-

-

... More
350 mm dia.

341.1

-

-

... More
400 mm dia.

662.76

-

-

... More
450 mm dia.

818.61

-

-

... More
Providing plain cement concrete bedding of PCC (1:2:4) with Stone chips 20 mm & down, to be constructed over 230 mm thick stone soling over carefully compacted backfill with selected excavated earth in layers of 150 mm, curing, ramming, compaction etc., including shuttering complete for pipe bedding and surrounding as per Drawings & Specification. Execution shall be done as approved, instructed or determined by the Engineer according to Site conditions.

-

-

-

... More
For DI K-7

-

-

-

... More
200 mm dia.

2809.92

-

-

... More
250 mm dia.

53.45

-

-

... More
300 mm dia.

26.41

-

-

... More
350 mm dia.

18.95

-

-

... More
400 mm dia.

36.82

-

-

... More
450 mm dia.

45.48

-

-

... More
Providing reinforced cement concrete  bedding with M-25 (Minimum Reinforcement 0.4% of cross section) to be constructed over 230 mm thick stone soling over carefully compacted backfill with selected excavated earth in layers of 150 mm, curing, ramming, compaction etc., including shuttering complete for pipe bedding and surrounding as per Drawings & Specification. Execution shall be done as approved, instructed or determined by the Engineer according to Site conditions.

-

-

-

... More
For DI K-7

-

-

-

... More
200 mm dia.

2809.92

-

-

... More
250 mm dia.

53.45

-

-

... More
300 mm dia.

26.41

-

-

... More
350 mm dia.

18.95

-

-

... More
400 mm dia.

36.82

-

-

... More
450 mm dia.

45.48

-

-

... More
SUPPLY & LAYING OF PIPE

-

-

-

... More
Providing and laying Ductile iron pipes of class K-7 S&S conforming to IS 8329:2000 with latest amendments, conveying to work site, rolling and lowering into trenches, laying true to line, level and perfect linking at joints, dewatering if required, testing (Water Tightness test, Straightness and Obstruction test etc. as per Specification) and commissioning, including loading and unloading at all destinations, cutting of pipes wherever necessary and approved EPDM quality rubber gaskets, cleaning the socket and spigot end with soap solution, applying soft soap to the socket and spigot ends before insertion of rubber gaskets, jacking and fixing in perfect conditions etc complete. (The contractor will make his own arrangements for water for testing. Earth work excavation in trenches to be measured and paid for separately.) All DI pipes shall be provided with internal cement mortar lining made of High Alumina cement (HAC) conforming to the Specification and ISO 7186. Rate shall include the cost of preparing As-Built Drawings, including network layout drawings and longitudinal profile drawings.

-

-

-

... More
200 mm dia

-

-

-

... More
0 - 1.5 m depth

37994.84

-

-

... More
beyond 1.5 - 3 m depth

15373.58

-

-

... More
beyond 3 - 4.5 m depth

1980.37

-

-

... More
beyond 4.5 - 6 m depth

849.67

-

-

... More
250 mm dia

-

-

-

... More
0 - 1.5 m depth

298

-

-

... More
beyond 1.5 - 3 m depth

539.83

-

-

... More
beyond 3 - 4.5 m depth

82.12

-

-

... More
beyond 4.5 - 6 m depth

148.95

-

-

... More
300 mm dia

-

-

-

... More
beyond 1.5 - 3 m depth

105.66

-

-

... More
beyond 3 - 4.5 m depth

422.47

-

-

... More
350 mm dia

-

-

-

... More
0 - 1.5 m depth

132

-

-

... More
beyond 1.5 - 3 m depth

142

-

-

... More
beyond 3 - 4.5 m depth

63

-

-

... More
beyond 4.5 - 6 m depth

42

-

-

... More
400 mm dia

-

-

-

... More
0 - 1.5 m depth

56.37

-

-

... More
beyond 1.5 - 3 m depth

658.03

-

-

... More
beyond 3 - 4.5 m depth

22

-

-

... More
450 mm dia

-

-

-

... More
0 - 1.5 m depth

86.72

-

-

... More
1.5 - 3 m depth

318.99

-

-

... More
beyond 3 - 4.5 m depth

503.86

-

-

... More
Providing, lowering, laying in trenches, aligning, fixing in position and jointing Ductile Iron (DI) ISI marked K-9 grade Double Chambered Restrained Joint pipes as per IS:8329-2000 and ISO:10804-2018(amended up to date), with rubber ring (EPDM) joints as per IS:5382-1985 (excluding special accessories), locking rings and locking bars complete including all material, labour, hydraulic testing andcommissioning as per technical specifications and as per direction of Engineer All DI pipes shall be provided with internal cement mortar lining made of High Alumina cement (HAC) conforming to the Specification and ISO 7186. Rate shall include the cost of preparing As-Built Drawings, including plan alignment drawings and longitudinal profile drawings.

-

-

-

... More
For 200 mm dia.

100

-

-

... More
For 250 mm dia.

100

-

-

... More
TRENCHLESS WORKS

-

-

-

... More
Installation of product pipe by Auger Boring method including making of entry and exit pits up to 3 m. Depth, all related civil works like excavation, shoring/strutting etc., shielded excavation through auger boring process lowering of pipe segments in the jacking pit, laying and jointing product pipeline through jacking process from the jacking pit and after project completion as per the instruction of the Engineer all complete except the cost of the pipe

-

-

-

... More
Above 450 mm & up to 600 mm dia, in all type of soil

200

-

-

... More
Providing MS encasing pipes(confirming to IS:3589-2001), outside Painting (two or more coats) on MS casing pipes and fittings with black anticorrosive bituminous paint of approved brand and manufacture, over and including a priming of ready mixed zinc chromate yellow primer & internal Epoxy Coating 406 micron, thickness of MS pipe etc. as per approved drawing and direction of Engineer.

-

-

-

... More
Diameter (OD) x Wall thickness of pipe in mm

-

-

-

... More
508 x 11

200

-

-

... More
BARRICADING

-

-

-

... More
Providing, erecting, dismantling and shifting of temporary barricading for particular work sites. Unless approved or determined otherwise by the Engineer: Temporary barricading shall be provided on both sides of open trenches. The unit rate shall refer to double-sided barricading of open trenches which shall be measured as per running metre (rmt) of open trench, whereas any single-sided barricading of open trenches shall be measured as per one-half of running metre (rmt) of open trench. The unit rate shall cover all costs for providing and erecting of temporary barricading from start of work at each particular work site until completion of work at each particular work site, as well as all costs to dismantle and shift the barricading to another particular work site. The barricading provided shall remain the property of the Contractor on completion of the work.

-

-

-

... More
Providing 2.00 m high temporary barricading at particular work sites; each panel of size 2.50 m x 2.00 m made of 40 mm x 40 mm x 6 mm angle iron or 50 mm x 50 mm x 3 mm hollow MS tube posts/ horizontal members/ bracings covered with 1.63 mm thick MS sheet. The sheet shall be fixed with 30 mm x 5 mm MS flat by suitable welding/ riveting. The panels shall be made so that gap of 50 cm beyond the ground is available making overall height as 2.5 m. MS channel ISLC 75 @ 5.70 kg/m, 50 cm long shall be provided at the bottom having oval shaped holes of size 50 mm x 25 mm at both ends with 50 cm long MS angle 40 mm x 40 mm x 6 mm bracing. Suitable arrangement shall be made to fix the barricading to avoid from overturning by providing 250 mm long expansion fasteners at both ends. The work shall be executed as per drawing/ direction of the Engineer which includes writing and painting, arrangement for traffic diversion such as traffic signals during construction at site for day and night, glow lamps, reflective signs, marking, flags, caution tape as directed by the Engineer. The barricading provided shall be retained in position at site continuously, until shifting of the barricading from one location to another location, as many times as required during the execution of the entire work till its completion. Rate include its maintenance for damages, painting, all incidentals, labour materials, equipment and works required to execute the job. The barricading shall not be removed without prior approval of the Engineer.

3302.27

-

-

... More
Supply of all material, labour and T&P to provide the barricading along trench during excavation and laying of pipe with Eucalyptus ballies of 100 mm dia in horizontal section in two rows and vertical post of 125 mm dia at 2 m C/C fastened with coconut/ Nariyal rope including provision of caution board.

29720.38

-

-

... More
REHABILITATION OF EXISTING MANHOLE

-

-

-

... More
Desilting the existing sewer lines through jetting and suction machines including cleaning, barricading and reconstruction of manholes for suction isolation by plugging and flow stoppage, setting up the over-pumping arrangements, traffic management, jetting and dislodging of accumulated silt from the pipelines, removal of silt through suction hose, disposal of removed silt from up to a distance of 20 km, necessary temporary repairs of sewers to stop locational collapse, ingress of ground water in desilted section of pipelines, all complete as per direction of Engineer

-

-

-

... More
from 150 mm dia up to 300 mm

19997

-

-

... More
beyond 300 mm

90

-

-

... More
Making connection of drain or sewer line with existing manhole including breaking into and making good the walls, floors with cement concrete 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) cement plastered on both sides with cement mortar 1:3 (1 cement : 3 coarse sand), finished with a floating coat of neat cement and making necessary channels for the drain etc. complete.

-

-

-

... More
For pipes up to 250 mm diameter

105

-

-

... More
Dismantling of manhole including RCC top slab, cover with frame including stacking of useful materials near the site and disposal of unserviceable materials into dumps within 50 m lead.

321

-

-

... More
MANHOLES

-

-

-

... More
RCC M-30 Pre-cast Manhole

-

-

-

... More
Construction of approved type pre-cast RCC manhole chambers, constructed using form vibrators of standard type, with barricading, danger lighting and using of sight rails and boning rods wherever necessary, dewatering if required, shoring and strutting wherever required using RCC M30 Grade of Concrete, Conforming to IS 456:2000 , with 20 mm and down graded stone chips, well graded sand and reinforcement shall be Fe500 conforming to IS 1786:2008, 250 mm thick top concrete slab, having wall thickness and raft thickness as in approved drawings and with an offset in raft all around the chamber as in approved drawing, benching concrete with 1:12 slope towards the central drain finished smooth, including fixing and grouting of pipes, including conveying to work spot supply and fixing EHD-35 Precast Concrete Manhole Cover & Frame, on a bed of PCC 1:2:4 supplying and fixing of minimum 6 mm thick encapsulated plastic footsteps (as per IS 10910) on 12 mm dia. Grade Fe500 steel bar (as per IS 1786) staggered at 300 mm apart as detailed in the Specification, disposal of surplus earth, watering, curing, engraving manhole number with flow direction on the inner cylindrical surface etc., complete including cost of reinforcement steel and fabrication charges and also cost and conveyance of all materials, labour with all lead and lifts. The Precast RCC manholes are for various diameters and depths as stated below and as per Drawings & Specification and direction of the Engineer.

-

-

-

... More
Type- A : 900 mm dia. manhole of 2.0 m depth

2183

-

-

... More
Type- B: 1200 mm dia. manhole of 2.5 m depth

262

-

-

... More
Type- C : 1500 mm dia. manholes

-

-

-

... More
3.5 m depth

175

-

-

... More
4.5 m depth

70

-

-

... More
5.5 m depth

33

-

-

... More
6.5 m depth

7

-

-

... More
Deductions which concern Items under Sr no. 27.01 per meter for decrease (-) of height on standard depth of following sizes of manholes including supply of all materials, labour, Tools & Plants etc. Required for proper completion of work. Following Items shall be considered as Negative and shall be deducted accordingly. (Note: The Employer shall consider these Deductions during Evaluation of Bids when determining the lowest evaluated Bid.)

-

-

-

... More
Deduction for shaft variations of Type- A : 900 mm dia. manholes (of 2.0 m depth) whose actual depths are below 2.0 meter.

1291.43

-

-

... More
Deduction for shaft variations of Type- B : 1200 mm dia. manholes (of 2.5 m depth) whose actual depths are beyond 2.0 meter and below 2.5 meter.

56.89

-

-

... More
Type- C : 1500 mm dia. manholes

-

-

-

... More
Deduction for shaft variations of Type- C : 1500 mm dia. manholes (of 3.5 m depth) whose actual depths are beyond 2.5 meter and below 3.5 meter.

76.84

-

-

... More
Deduction for shaft variations of Type- C : 1500 mm dia. manholes (of 4.5 m depth) whose actual depths are beyond 3.5 meter and below 4.5 meter.

26.24

-

-

... More
Deduction for shaft variations of Type- C : 1500 mm dia. manholes (of 5.5 m depth) whose actual depths are beyond 4.5 meter and below 5.5 meter.

15.85

-

-

... More
Deduction for shaft variations of Type- C : 1500 mm dia. manholes (of 6.5 m depth) whose actual depths are beyond 5.5 meter and below 6.5 meter.

6.3

-

-

... More
RCC M-30 Cast-in-situ Manhole

-

-

-

... More
Construction of approved type Cast-in-situ RCC manhole chambers, constructed using form vibrators of standard type, with barricading, danger lighting and using of sight rails and boning rods wherever necessary, dewatering if required, shoring and strutting wherever required using RCC M30 Grade of Concrete, Conforming to IS 456:2000, with 20 mm and down graded stone chips, well graded sand and reinforcement shall be Fe500 conforming to IS 1786:2008, 250 mm thick top concrete slab, having wall thickness and raft thickness as in approved drawings and with an offset in raft all around the chamber as in approved drawing, benching concrete with 1:12 slope towards the central drain finished smooth, including fixing and grouting of pipes, including conveying to work spot supply and fixing EHD-35 Precast Concrete Manhole Cover & Frame, on a bed of PCC 1:2:4 supplying and fixing of minimum 6 mm thick encapsulated plastic footsteps (as per IS 10910) on 12 mm dia. Grade Fe500 steel bar (as per IS 1786) staggered at 300 mm apart as detailed in the Specification, disposal of surplus earth, watering, curing, engraving manhole number with flow direction on the inner cylindrical surface etc., complete including cost of reinforcement steel and fabrication charges and also cost and conveyance of all materials, labour with all lead and lifts. The Cast-in-situ RCC manholes are for various diameters and depths as stated below and as per Drawings & Specification and direction of the Engineer.

-

-

-

... More
Cast-in-situ: 900 mm dia. manhole of 2.0 m depth

242

-

-

... More
Cast-in-situ: 1200 mm dia. manhole of 2.5 m depth

29

-

-

... More
Cast-in-situ: 1500 mm dia. manholes

-

-

-

... More
3.5 m depth

19

-

-

... More
4.5 m depth

8

-

-

... More
5.5 m depth

4

-

-

... More
6.5 m depth

1

-

-

... More
Deductions which concern Items under Sr no. 29 per meter for decrease (-) of height on standard depth of following sizes of manholes including supply of all materials, labour, Tools & Plants etc. Required for proper completion of work. Following Items shall be considered as Negative and shall be deducted accordingly. (Note: The Employer shall consider these Deductions during Evaluation of Bids when determining the lowest evaluated Bid.)

-

-

-

... More
Deduction for shaft variations of Cast-in-situ: 900 mm dia. manholes (of 2.0 m depth) whose actual depths are below 2.0 meter.

166.54

-

-

... More
Deduction for shaft variations of Cast-in-situ: 1200 mm dia. manholes (of 2.5 m depth) whose actual depths are beyond 2.0 meter and below 2.5 meter.

7.14

-

-

... More
Cast-in-situ: 1500 mm dia. manholes

-

-

-

... More
Deduction for shaft variations of Cast-in-situ: : 1500 mm dia. manholes (of 3.5 m depth) whose actual depths are beyond 2.5 meter and below 3.5 meter.

11.63

-

-

... More
Deduction for shaft variations of Cast-in-situ : 1500 mm dia. manholes (of 4.5 m depth) whose actual depths are beyond 3.5 meter and below 4.5 meter.

3.51

-

-

... More
Deduction for shaft variations of Cast-in-situ: : 1500 mm dia. manholes (of 5.5 m depth) whose actual depths are beyond 4.5 meter and below 5.5 meter.

2.03

-

-

... More
Deduction for shaft variations of Cast-in-situ: : 1500 mm dia. manholes (of 6.5 m depth) whose actual depths are beyond 5.5 meter and below 6.5 meter.

0.7

-

-

... More
Providing and fixing DROP ARRANGEMENT with following dia. HDPE grade PE-100 pipes, conforming to PN 6 as per IS 14333:1996 with latest amendments, vertical drop pipe with MS fastenings at 300 mm C/C, with suitable expander / reducer HDPE ‘T’ joint at top with incoming sewer with one end of Tee inside the manhole closed with end cap and 45 degree bend at the bottom with HDPE specials and encasing the pipe outside the manhole with plain cement concrete-PCC 1:2:4 proportion, 150 mm / 200 mm thick all around the HDPE pipe, including vibrating, compacting, necessary centering and form work, curing, testing etc. including cost and conveyance of all materials, labour with all lead and lifts etc. complete as per specification, drawings and as directed by the Engineer.

-

-

-

... More
For 150 mm dia. drop pipe.

220.87

-

-

... More
For 200 mm dia. drop pipe

263.95

-

-

... More
House Service Connection

-

-

-

... More
House Service Connection Survey including working drawings and cost schedules

6153

-

-

... More
Construction of road-side Inspection/Junction Chamber 600 mm x 600 mm (up to depth 1200 mm) Construction of road-side Inspection/ Junction Chamber of Size 600 mm x 600 mm: inside clear dimension (with maximum depth up to 1.20 metres.) with 100 mm thick PCC 1:2:4 in foundation, 75 mm thick PCC 1:2:4 flooring in slope, 230 mm thick First Class Brick Work in Cement Mortar 1:4 (1 Cement : 4 Coarse Sand), 12 mm thick inside and outside plastering with Cement Mortar 1:3), inside plaster finished with neat coat of cement, with Square 710 mm x 710 mm RCC Cover and Frame (MD-10), refilling of Jhiri with watering and ramming including fixing up to 5 nos. of 110 OD uPVC pipes (Stiffness class SN 8) as per IS 15328:2003 and RCC NP3 150 mm dia. pipe pieces as per IS 458:2003 and plugging the same etc. complete as per approved standard drawing. (Pipe cost to be paid separately).

2546

-

-

... More
Construction of property Connection Chamber of Size 500 mm x 500 mm x 500 mm - inside clear dimension, with 100 mm thick PCC 1:2:4 in foundation, 230 mm thick First Class Brick Work in Cement Mortar 1:4 (1 Cement : 4 Coarse Sand), 12 mm thick inside and outside plastering with CM (1:3), inside plaster finished with neat coat of cement, with Square 600 mm x 600 mm Precast RCC Cover (M25) as required, refilling of Jhiri with watering and ramming, including fixing up to 4 nos. of 110 OD uPVC pipes, complete as per approved standard drawing.

12306

-

-

... More
Supplying, laying S&S RCC spun / Vibrated Cast Pipes (Reinforced) NP3 Class conforming to IS:458 with latest amendments for Sewer line works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials including cost of specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e., rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing) but excluding excavation and backfilling of trenches up to ground level. Rate shall include the cost of preparing As-Built Drawings, including pipe and chamber layout drawings indicating pipe invert levels at chambers RCC NP3 150 mm dia. connection from Inspection Chamber to Manhole, or connection from Junction Chamber to Manhole

25460

-

-

... More
Providing, conveying to site, lowering in trenches, aligning, laying & jointing to street manholes or to lateral sewers directly or through road side chamber, by rigid uPVC pipes, of (Stiffness class SN 8) as per IS 15328:2003, ISI marked and as per specifications with rubber ring with socket and spigot joints, (EPDM/SBR) as per IS 5382:1985 including cost of rubber gaskets, lubricants etc., with  bedding as per drawing, all transportation, loading and unloading, conveying to site and stacking the same in closed shed duly protected from sun rays and rains, giving satisfactory hydraulic field testing and commissioning, as per the Specification and Drawings etc. complete as directed by the Engineer. Rate shall include the cost of preparing As-Built Drawings, including pipe and chamber layout drawings indicating pipe invert levels at chambers 110 mm dia (OD) uPVC pipes, connection from Connection Chamber to Manhole, or connection from Connection Chamber to Inspection Chamber

104601

-

-

... More
Demolishing brick work by manual / mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of the Engineer.

832.5

-

-

... More
Demolishing cement concrete pavement by mechanical means (including cutting at the edges of road surfaces to be demolished) including disposal of material within 50 metres lead as per direction of Engineer. Nominal concrete 1:3:6 or richer mix (i.e. equivalent design mix). Breaking by excavator at the edges of road surfaces to be demolished shall not be permitted.

930.2

-

-

... More
Demolishing RCC work by manual / mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of the Engineer.

486.6

-

-

... More
Demolishing stone rubble masonry by manual / mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of the Engineer. In cement mortar

706.1

-

-

... More
Dismantling tile work in floors laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles 10 mm to 25 mm.

21540

-

-

... More
Demolishing dry brick pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material within 50 metres lead.

462.75

-

-

... More
Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead.

7390

-

-

... More
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by the Engineer, beyond 50 m initial lead, for all leads including all lifts involved.

5028.48

-

-

... More
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth up to 50 m and lift up to 1.5 m, as directed by the Engineer. In All kinds of soil

30780

-

-

... More
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer. In All kinds of soil

9234

-

-

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.

3078

-

-

... More
Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, sub bases of PCC, plinths, sides of foundation, etc. complete for backfilling of existing septic tank

95986.8

-

-

... More
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate

6170

-

-

... More
Chequered precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). Medium shade pigment using 50% white cement and 50% Grey cement

6170

-

-

... More
Marble stone flooring with 18 mm thick marble stone, as per sample of marble approved by Engineer, over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with grey cement slurry, including rubbing and polishing complete with Udaipur green marble

6170

-

-

... More
Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) : 25 mm thick

18397.11

-

-

... More
40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand) with joints finished flush. Red sand stone

6170

-

-

... More
Providing and laying Ceramic glazed floor tiles of size 300 mm x 300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/sqm including pointing the joints with white cement and matching pigment etc., complete

12310

-

-

... More
Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 500 mm x 500 mm

6170

-

-

... More
Providing & fixing white vitreous China water closet squatting pan (Indian type) along with "S" & "P" trap including dismantling of old WC seat and "S" & "P" trap at site complete with all operations including all necessary materials, labour and disposal of dismantled materials all complete as per the direction of Engineer. Odisha pattern pan of standard size 580 mm x 440 mm

120

-

-

... More
Supply, delivery and installation of readymade plastic septic tanks (Supreme Brand or its equivalent) at site in vertical design with two separate integral compartment for proper settlement and decomposition of solid waste, with a plastic cover, as per drawing and specification & direction of the Engineer. Size:2000 litres capacity (Dia-1.42 m. & Height-1.73 m.)

30

-

-

... More
Removal of Sewage/sludge from existing Septic Tank

6153

-

-

... More
Ancillary works like Anchor Block, Thrust Block, Protection work, Manhole, Repairing or New construction of Drain, pipe encasing etc., arrangement for pipe laying over water course/nallah beyond ground, pipe crossing bridge etc.

-

-

-

... More
Provision for crossing of nala or drain & stop flow of running water by making temporary bandh with gunny bag filled with earth and making hole in drain wall, excavation (if any) and remake the drain as previous condition

170

-

-

... More
Demolishing of existing culvert and restore the same (with M30 Grade of Concrete) for laying/crossing of pipe line through Culvert as per the Drawings and Specification

60

-

-

... More
Construction of R.C.C. Pedestal for crossing of Sewer Line in existing Nala including Earth work in Marshy soil as per the Drawings and Specification with provision of necessary bypassing system of Nala

16

-

-

... More
Construction of R.C.C. cast in situ Manhole along Nala including Earth work in Marshy soil as per the Drawings and Specification with provision of necessary bypassing system of Nala

3

-

-

... More
Excavation for foundation / pipe trenches in slush Muddy / marshy / Slushy / soil including use of poclain,  dewatering during execution including removing the excavated material up to a distance of 50 metres and the lifts as below, stacking and spreading as directed, preparing the bed by cleaning the mud, labour required for execution for shuttering item, necessary diversion of running water/sewer but excluding backfilling etc. complete.

2248.1

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)

3707.92

-

-

... More
Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, cement (as per the Specification), admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centring, shuttering, finishing and reinforcement as per direction of the Engineer; for the following grades of concrete.- All work up to plinth level : Note: Prior approval for Design Mix Concrete has to be taken from the Engineer Concrete of M25 grade, Design Mix Concrete as approved by the Engineer

821.12

-

-

... More
Centring and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete

702.72

-

-

... More
Centring and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts

1976.4

-

-

... More
Centring and shuttering including strutting, propping etc. and removal of form for Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc

450.15

-

-

... More
Supplying, fitting and fixing in position reinforcement with Thermo-Mechanically Treated-TMT bars conforming to relevant IS Code for RCC work including straightening, cleaning, cutting and bending to proper shapes and length as per details, supplying and binding with 20G annealed black wire and placing in position with proper blocks, supports, chairs, spacers etc. complete. (No extra measurement for lap, hook, chair, anchor etc. will be entertained in the measurement as they are included in the rate) Grade Fe500 or more

86492.44

-

-

... More
Supply and Fixing in position of 50X8 MS STRAP with Nut bolt and paint etc complete

1086

-

-

... More
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand)

199.94

-

-

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand)

13.8

-

-

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand)

124.24

-

-

... More
15 mm cement plaster on rough side of single or half brick wall of mix: 1:4 (1 cement: 4 coarse sand)

600.2

-

-

... More
12 mm cement plaster of mix :1:6 (1 cement: 6 coarse sand)

600.2

-

-

... More
ROAD REINSTATEMENT WORKS

-

-

-

... More
Cement Concrete Pavement & Interlocking Paver Block

-

-

-

... More
GSB BY Plant Mix: Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Specification Clause 401 of MoRTH (Grade-I Material).

7853.55

-

-

... More
Water Bound Macadam Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. By Manual Means

-

-

-

... More
Grading- I (1st Layer), Using Screening Type-A (13.2 mm Agg.)

9162.47

-

-

... More
Grading- II (2nd Layer), Using Screening Type-A (13.2 mm Agg.)

6871.86

-

-

... More
Grading- III (3rd Layer), Using Screening Type-B (11.2 mm Agg.)

6871.86

-

-

... More
Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1 of MoRT&H specification, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 MPa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.

13240.24

-

-

... More
Construction of Un-reinforced, Cement concrete pavement, thickness as per design, over a prepared sub base with 43 grade cement or any other type PCC Grade M-30, coarse and fine aggregates conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of wedges, steel plates including levelling the formwork and laying and fixing of 125 microns thick polythene film, as per drawing), spreading the concrete with shovels, rakes, compacted using needle, and plate vibrators, finished in continuous operation and curing of concrete slabs for 14 days, using curing compound where specified and water finishing to lines and grade as per the Drawings and Specification.

8861.17

-

-

... More
Providing and Laying of Interlocking Concrete Block (M-35) Pavements having thickness 60 mm as per the Drawings and Specification

2685.2

-

-

... More
Laying old cement concrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer. (Old CC paver blocks shall be supplied by the department free of cost, it shall include paver blocks obtained by taking out from the road).

638.97

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.