Pey Jal Nigam Uttarakhand Tender
View complete overview of Uttarakhand Pey Jal Nigam Uttarakhand Tender
Pey Jal Nigam Uttarakhand Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date8 Oct 2024
Closing Date18 Oct 2024
Tender Amount₹ 1,93,00,000
Costs
EMD
₹ 3,86,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MDPEY_76742_1Bid Award Id
ViewTender No
Letter No. 2712 / Nivida /166 Dated 05/10/2024Tender Authority
Pey Jal Nigam Uttarakhand ViewPurchaser Address
-Website
http://http://peyjal.uk.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Excavation of earth work for pipe line in following starta, lift upto 1.5M and lead up to 30 m including refilling, watering and ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m from trenches including supply of labour and T&P etc. all complete (Assuming that 90% pipeline is laid in trenches). It is estimated that 75% excavation will be in soil mixed with single, bajari & boulders and rest 25% in medium rocks.
-
-
-
... More
Soil Mixed with boulder
612
-
-
... More
Medium Rock
132
-
-
... More
Supply and fixing of valves of ASA 150 grade in Rising main pipeline including cutting thresading fo pipeline with fittings, materials.
CS Sluice valves comfirming IS: 788 PN 16
-
-
-
... More
100 mm
2
-
-
... More
Supply and fixing of valves of ASA 150 grade in Rising main pipeline including cutting thresading fo pipeline with fittings, materials.
CS NRV Valves confirming IS: 789 PN 16
-
-
-
... More
200 mm
2
-
-
... More
Supply of all materials, Labours. T&P etc and construct Gate valve chamber as per type design complete.
2
-
-
... More
Providing M 20 plain concrete for Anchor/thrust block of 1 cum as per type design complete.
22
-
-
... More
Provide all material , labour , T& P and construction of protection work for gravity.
-
-
-
... More
R.R 1:6 stone masonry
201
-
-
... More
R.R dry stone masonry
80
-
-
... More
Site clearance and other unforeseen items.
1
-
-
... More
Provide and lay P.C.C. 1:4:8 with cement local sand and 40mm guage stone ballast including supply of materials, labour., T&P required for proper completion of work in foundation.
5
-
-
... More
Provide and lay P.C.C. 1:2:4 with cement local sand and 20mm guage stone grit including supply of materials, labour., T&P required for proper completion of work in foundation.
5
-
-
... More
Pumping Plant for (Infiltration Well) Submersible pump-moter set (1000 LPM, 250 M Head)
2
-
-
... More
Starter
2
-
-
... More
325 Amps main switch
1
-
-
... More
Control pannel
1
-
-
... More
Power wiring & Earthing material
1
-
-
... More
Main piping and Wall
1
-
-
... More
Gauges
1
-
-
... More
Lifting tackle 2 ton capacity 8 mtr
1
-
-
... More
Transformer oil
1
-
-
... More
Rubber Resistance Sheet (1×2×0.025 M)
3
-
-
... More
Tools
1
-
-
... More
Installation & commissioning of Pumping Plants & related acceessories for all stages.
1
-
-
... More
Testing : At Works
1
-
-
... More
At Site
1
-
-
... More
Painting
1
-
-
... More
Carting
1
-
-
... More
Maintenance (one year)
1
-
-
... More
S.I.T.C. of Transformer
-
-
-
... More
Stage-I (250 KVA)-2 Nos.
1
-
-
... More
S.I.T.C. of H.T. Panel
-
-
-
... More
Stage-I -1 No.