Pey Jal Nigam Uttarakhand Tender

View complete overview of Uttarakhand Pey Jal Nigam Uttarakhand Tender

Pey Jal Nigam Uttarakhand Tender

Works
Civil And Construction
Eprocure
Opening Date13 Sep 2022
Closing Date27 Sep 2022
Tender Amount₹ 62,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. Fromtrenches including supply of labour,T&P.etc complete.Assuming that 90%pipe line is laid in trenches ,it is estimated that 75% exavation will be in soil mixed with shingle,bajri&boulders and rest 25%will be in soft rock.

-

-

-

... More
Soil mixed with boulder and bajri

1800

-

-

... More
Soft rock

500

-

-

... More
Supply and fixing of the following fittings including cartage of materials, labours, T&P etc complete. (Gate valves (Class-I) as per I S 778/1997)

-

-

-

... More
20 mm dia

3

-

-

... More
25 mm dia

4

-

-

... More
32 mm dia

1

-

-

... More
Supply of all materials, labours, T&P etc and construct gate valve chamber as per type design complete.(.60x0.6x0.75)

5

-

-

... More
Supply of all materials, labours, T&P etc and Providing FHTC(with providing an average 30.00 m length of 15 mm dia ) etc.complete.

40

-

-

... More
Supply of all materials, labour, T&P etc and construction of R.C.C. CWR of following capacities (KL) with M.S. ladder outside & inside of the tank, M.S.M.H. cover with locking arrangement, supply and fixing of chlorinator, cowl,outlet, over flow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting with approved water proofing (apex) / enamal paint, testing, filling water for testing purpose etc. including supply of vertical pipes and specials,and cleaning of bushes for path, assuming bearing capacity as 8MT/M2 .

-

-

-

... More
2.00 KL

1

-

-

... More
3.00 KL

2

-

-

... More
10.00 KL

1

-

-

... More
20.00 KL

1

-

-

... More
Supply and installation of bucket type chlorinator of 25 liters capacity including bleeching powder solution doser, chloroscope kit with stop cock & iron cage fabricated with 25 mm x 25 mm square mesh with locking arrangements below dozer to protect flexible pipe connection with CWR complete with all arrangements in position.

5

-

-

... More
Excavation in ordinary soil mixed with shingle, boulder requiring special T&P like pickaxe, crowbar etc. for foundation including lift upto 1.5 m. and Lead upto 30 m. Including refilling, watering, ramming of excavated earth into the trenches or space between the sides of foundation trenches or in to the plinth and removal and disposal of surplus earth upto a distance of 60 m. from trenches nearby sources, along the pipe line .

55

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).

10

-

-

... More
Random Rubble stone masonry in 1:6 with cement and sand mortar including supply of all materials, labour, T&P etc. complete.

130

-

-

... More
Random Rubble stone masonry laid dry including supply of all materials, labour, T&P etc. complete.

35

-

-

... More
Construction of R.C.C. roughening filter cum screening chamber near by tapping point of under existing water supply scheme, for collection of water including supply of all materials, labour , T&P etc.(2x1)mtr size

5

-

-

... More
Construction of R.C.C. Intake chamber having (1.0mx1.0mx1.5m) size at tapping point of under existing water supply scheme, for collection of water including supply of all materials, labour , T&P etc.complete

4

-

-

... More
C.C, dtrain

150

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.