Pey Jal Nigam Uttarakhand Tender
View complete overview of Uttarakhand Pey Jal Nigam Uttarakhand Tender
Pey Jal Nigam Uttarakhand Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date10 Jun 2022
Closing Date23 Jun 2022
Tender AmountRefer Documents
Costs
EMD
₹ 82,100Document Cost
₹ 3,540Tender Fee
Refer Documents
Summary
Purnapur Peyjal Yojna In Vikas Khand Khatima Of Distt Udham Singh Nagar Under Jal Jeevan Mission Programme
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_MDPEY_45589_1Bid Award Id
ViewTender No
1592/E-TENDER/111 DATED 04-06-2022Tender Authority
Pey Jal Nigam Uttarakhand ViewPurchaser Address
-Website
http://http://peyjal.uk.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Drilling 450 mm dia size final bore from G.L to 200 MBGL.including arrangement of water, Geophysical logging of bore well, (If required ) feeding of pea-gravel& collection of strata sample in box
200
-
-
... More
Preparing and Lowering of 200 mm dia plain/slotted pipe tube well assembly form G.L. to 200 MBGL.
200
-
-
... More
Dismantling of Rig machine after completion of work. Fitting of girder and clamp, well cap.with site clearance-
1
-
-
... More
Supply of material for tubewell assembly
-
-
-
... More
Supply of 200 mm dia 8.0mm thick MSERW plain pipe.
176
-
-
... More
Supply of 200 mm dia 8.0mm thick MSERW slotted pipe.
24
-
-
... More
Supply of 200x100 mm dia size M.S. Girder 4Mt Long
2
-
-
... More
Supply of 200 mm dia Bail pulg with hook.
1
-
-
... More
Supply of M.S heavy duty D.E. clamp suitable for 200 mm dia.
1
-
-
... More
Supply of 200mm dia well cap.
1
-
-
... More
Supply of Pea gravel 2.0 mm to 4.00 mm
35
-
-
... More
Development of Tubewell by 350 PSI/1100CFM air comperssor.
-
-
-
... More
Development by Air compressor including erection of Air compressor unit and dismantling after work as per specification.
35
-
-
... More
Development of Tubewell by O.P. unit of suitable capacity.
-
-
-
... More
Development by O.P unit to get sand free discharge of 375 LPM including erection of O.P. Unit and dismantling after work as per specification.
30
-
-
... More
Geohydrologgical survey of site
1
-
-
... More
Chemical & Bacteriological Test of water
1
-
-
... More
S.I.T.C. of Solar Submersible Pumping Plant with Accessories for Tubewell
-
-
-
... More
Supply of submerisble solar A.C/D.C pump with adequate capacitysuitable for 200mm dia Assembly , motor complete with 1.0 Meter cable complete in all respects for 108000LPD /300LPM at 70Mtr Head, 10 HP.
1
-
-
... More
Supply of Spare pump of same duty cycle
1
-
-
... More
Supply of solar hybrid pump controller (Control panel cum starter) suitable for above pump- motor set also suitable for on grid supply as per following parameters .
(i)Inbuilt MPPT Tracking facility ensuring overload under over voltage protection force air time of lack of radiation
(ii) Parameter display facilities
(iii) Auto reset after every fault
(iv) Dry running protection to avoid dry run of motor
1
-
-
... More
AC/DC manual selector switch auto on/off failure depending of water level in tank by sensor based floating valve. 1- 32mmdia HDPE Pipe For Cablling. 30Mtr
2- 6sqmm solar cable 60Mtr
1
-
-
... More
Solar photo voltage poly crystalline solar module 9500wt. As per IEC standrard (for above pump) including Chain link/wire mesh fencing system of suitable size to protect solar PV module system From unathorized intrusion.
1
-
-
... More
Supply of main piping & valves as per scope of work and technical specifications
1
-
-
... More
Tools
1
-
-
... More
Construction RCC Foundation with suitable foundation Nut, Bolts and Supply & fitting of G.I. Solar Panel mounting structure including panel mounting clamp, pole etc complete in all respect.
1
-
-
... More
Installation, commissioning and setting to work and testing of entire equipment installed at site including supply of necessary fixing accessories like insulation, teflon tape etc.
1
-
-
... More
10sq.mm x 3 core copper flexible cable
100
-
-
... More
Chain Pulley block of 2 tonne capacity 4Mt. Lift spur gear tested on 2 ton load
1
-
-
... More
Rubber insulation sheet 1 Mt. x 2Mt.
1
-
-
... More
Lightening arrestor, Copper strip, Earth kit and Chemical earthing as per latest IE rules has to be provided for Cathodes and rest as per normal GI earth strips from cathode to different equipments
1
-
-
... More
Internal & External Electrification of pump house for Proposed Tubewell
1
-
-
... More
One month Trial Running & Five month operation, Maintenance including watch & ward.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements