Pey Jal Nigam Uttarakhand Tender
View complete overview of Uttarakhand Pey Jal Nigam Uttarakhand Tender
Pey Jal Nigam Uttarakhand Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date1 Mar 2024
Closing Date7 Mar 2024
Tender Amount₹ 58,04,000
Costs
EMD
₹ 1,16,000Document Cost
₹ 4,720Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MDPEY_70677_1Bid Award Id
ViewTender No
Letter No 457/Lekha-04/55 Dt.26/02/2024Tender Authority
Pey Jal Nigam Uttarakhand ViewPurchaser Address
-Website
http://https://peyjal.uk.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
G.I. Pipes 25 mm dia
1350
-
-
G.I. Pipes 20 mm dia
1585
-
-
G.I. Pipes 15 mm dia
850
-
-
Supply of following valves and fittings ISI marked class -I as per IS - 788/1971 at site of work and fitting at pipe line as required.
G.M. Wheel Valve
-
-
-
20 mm dia
6
-
-
25 mm dia
2
-
-
32 mm dia
2
-
-
Dismentling & Relaying of G.I.Pipe in true alignment in trenches including supply of all materials,labour,T&P etc. Complete
-
-
-
20 mm dia G. I. (M) Pipe
450
-
-
Excavation of earth work for pipe line in following starta, lift upto 1.5M and lead up to 30 m including refilling, watering and ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m from trenches including supply of labour and T&P etc. all complete (Assuming that 90% pipeline is laid in trenches). It is estimated that 75% excavation will be in soil mixed with single, bajari & boulders and rest 25% in medium rocks.
-
-
-
Soil Mixed
1690
-
-
Medium Rock
470
-
-
Provide all materials, labour, T&P, construction of following chambers as per type design.
-
-
-
Wheel Valve / Air Valve Chamber (0.60x0.60)
9
-
-
Supply of all material, labour, T&P and construction of Intake Chamber 0.60 M x 0.60 M size as per Drawing & Desin.
1
-
-
Supply of all material, labour, T&P and construction of R.C.C. Roghing Filter cum Collection Chamber as per Drawing & Design.
1
-
-
RCC CWR:-Design, testing bearing capacity of soil and construction of R.C.C. (1:1.5:3) semi sunk Clear Water Reservoir of following capacities in K.L. including supply of necessary scaffolding, shuttering and other accessories along with supply and fixing of inlet and outlet pipes of size equal to sizes of inlet and outlet pipe line, making bye pass arrangement, fixing of overflow pipe in outlet pipe/distribution system, fixing of lightening conductor & M.S. Manhole of size as per norms and colour washing of approved class snowcem and along with carting of all materials including supply of all materials, labour, T&P etc. complete as per latest IS specification or as per satisfaction & approval of Engineer in Charge. and Installation of M.S. Bucket Type chlorinator of 25 Ltrs. capacity with internal glass wool lining.
-
-
-
10.0 KL Capacity
1
-
-
Provision laying P.C.C. 1:2:4 con to repair of village path after laying of pipe line.
15
-
-
Provide all material, labour, T&P, construction of Random Rubble Stone masonary 1:6(1 Cement : 6 coarse sand)
45
-
-
Provide all material, labour, T&P, construction of Random Rubble Stone masonary laid dry.
40
-
-
Supply of all materials, labours, T&P etc. and making ferrule connection to provide FHTC to the consumers excluding pipe line
35
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements