Pey Jal Nigam Uttarakhand Tender
View complete overview of Uttarakhand Pey Jal Nigam Uttarakhand Tender
Pey Jal Nigam Uttarakhand Tender
Civil And Construction
Eprocure
Opening Date19 Oct 2022
Closing DateCancelled
Tender AmountRefer Documents
Costs
EMD
₹ 1,80,000Document Cost
₹ 4,720Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_MDPEY_50753_1Bid Award Id
ViewTender No
5566/613/752 Dated 14/10/2022Tender Authority
Pey Jal Nigam Uttarakhand ViewPurchaser Address
-Website
http://http://peyjal.uk.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
25 mm dia.
4055
-
-
... More
32 mm dia
3000
-
-
... More
50 mm dia.
3000
-
-
... More
Dismantling of following dia screwed and socketed G.I. Pipes, specials and fittings including taking out of dismantled G.I. pipes and specials from trenches and stacking them properly within 50 m but excluting the cost of excavation of trenches.
-
-
-
... More
15 mm dia
145
-
-
... More
20 mm dia
862
-
-
... More
25 mm dia.
1235
-
-
... More
40 mm dia.
1400
-
-
... More
Excavation of earth for pipeline in following strata lift upto 1.5 m lead upto 30 m including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m from trenches including supply of labour, T & P etc.all complete assuming that 90% pipe line is laid in trenches, it is estimated that 75% excavation will be in soil mixed with shingle, bajari and boulders and rest 25% will be in medium rock
-
-
-
... More
Soil mixed with Shingle, Bajri and Boulders
8050
-
-
... More
Medium Rock
1200
-
-
... More
Relaying & Jointing fixing and testing of dismanteled pipes lowering them into trenches, laying true to alignment & gradient, laying and jointing of pipe line including cutting cutting & threading of pipe making up lengths as required for proper completion of work
-
-
-
... More
15 mm dia
145
-
-
... More
20 mm dia
862
-
-
... More
25 mm dia.
1235
-
-
... More
40 mm dia.
1400
-
-
... More
Cartage of following sizes of valve, lowering them into trenches and fixing the same on water supply including the cost of valve,specials lobour T & P complete in all respact but excluding the cost of excavation and chember.
Wheel / Gate Valve as per IS 778 : 1997
-
-
-
... More
20 mm
4
-
-
... More
25 mm
4
-
-
... More
32 mm
9
-
-
... More
40 mm
2
-
-
... More
50 mm
1
-
-
... More
C.I. Air Valve (Class I) as per I S 788/1997
-
-
-
... More
15 mm
1
-
-
... More
20 mm
1
-
-
... More
Supply of all materials, labour, T & P etc and construction of Water Meter Chamber as per type, design (Size :-60cm x 60cm x75 m)
22
-
-
... More
Demolishing cement concrete manually / mechanical means including disposal of material within 50 meteres lead as per direction of Engineer in charge for nominal concrete or richer mix.
12
-
-
... More
Providing and fixing with all materials T&P labour Functional House Hold Tap Connection etc complete. [For Base Year Balance HH]
86
-
-
... More
PCC 1:2:4 including supply of all materials, labour, T&P etc. complete
21
-
-
... More
PCC 1:4:8 including supply of all materials, labour, T&P etc. complete
2
-
-
... More
RR Stone Masonry 1:6 including supply of all materials, labour, T&P etc. complete.
25
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements