Kashipur Septage I And D Scheme Phase Ii On Turn Key Basis At Kashipur City On Two Bid System Under Amrut Programme

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Electro- Mechanical Works

1

-

-

... More
Part B : I&D WORKS FOR RAILWAY LINE NALA

-

-

-

... More
Survey, Design,Construction of 2 No. RCC Retaining walls & Allied Works for Railway line nala including Weir gates etc. complete in all respect to make the system functional.

1

-

-

... More
Part C : CONSTRUCTION OF TYPE-I BUILDING AT EXISTING SPS AT MAHESHPURA

-

-

-

... More
Construction of Type-I Residential Building ( PLINTH AREA 48.80 Sqm) as per CPWD Specifications

1

-

-

... More
Part D : RENOVATION WORK OF EXISTING SPS AT MAHESHPURA

-

-

-

... More
Electro- Mechanical Works

1

-

-

... More
Civil and Structural Works (Renovation Works)

-

-

-

... More
Demolishing cement concrete manually by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in-charge . Nominal concrete 1:3:6 or richer mix

4.33

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level .1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size).

4.33

-

-

... More
52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per manufacturer's specifications. This includes cost of cement slurry, but excluding the cost of nosing of steps etc. complete

43.27

-

-

... More
Providing and laying integral cement based water proofing treatment including preparation of surface as required for treatment of roofs, balconies, terraces etc consisting of following operations: (a) Applying a slurry coat of neat cement using 2.75 kg/sqm of cement admixed with water proofing compound conforming to IS. 2645 and approved by Engineer-in-charge over the RCC slab including adjoining walls upto 300 mm height including cleaning the surface before treatment. (b) Laying brick bats with mortar using broken bricks/brick bats 25 mm to 115 mm size with 50% of cement mortar 1:5 (1 cement : 5 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineerin- charge over 20 mm thick layer of cement mortar of mix 1:5 (1 cement :5 coarse sand ) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge to required slope and treating similarly the adjoining walls upto 300 mm height including rounding of junctions of walls and slabs. (c) After two days of proper curing applying a second coat of cement slurry using 2.75 kg/ sqm of cement admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge. (d) Finishing the surface with 20 mm thick jointless cement mortar of mix 1:4 (1 cement :4 coarse sand) admixed with water proofing compound conforming to IS : 2645 and approved by Engineer-in-charge including laying glass fibre cloth of approved quality in top layer of plaster and finally finishing the surface with trowel with neat cement slurry and making pattern of 300x300 mm square 3 mm deep(e) The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final test.“All above operations to be done in order and as directed and specified by the Engineer-in-Charge : 22.7.1 With average thickness of 120 mm and minimum thickness at khurra as 65 mm.

43.27

-

-

... More
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.

354.65

-

-

... More
12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand)

354.65

-

-

... More
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)

442.92

-

-

... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : 13.61.1 Two or more coats on new work

76.4

-

-

... More
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works

640.8

-

-

... More
CARRIAGE OF MATERIALS By Mechanical Transport upto 5km including loading, unloading and stacking- Sludge

216.36

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 ement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)

93.38

-

-

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size).

157.5

-

-

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more( @1% of RCC Quantity)

123.64

-

-

... More
Constructing brick masonry circular manhole 1.52 m internal dia at bottom and 0.56 m dia at top in cement mortar 1:4 (1 cement : 4 coarse sand) inside cement plaster 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement, foundation concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) and making necessary channel in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) finished with a floating coat of neat cement, all complete as per standard design : 19.13.1 2.30 m deep with SFRC Cover and frame (heavy duty HD- 20 grade designation) 560 mm internal diameter conforming to I.S. 12592, total weight of cover and frame to be not less than 182 kg. fixed in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including centering, shuttering all complete. (Excavation, foot rests and 12 mm thick cement plaster at the external surface shall be paid for separately) : 19.13.1.1 With common burnt clay F.P.S. (non modular) Bricks of class designation 7.5

6

-

-

... More
Excavation of earth upto 1.5 mt. depth below G.L. for laying of Sewer, Man-Holes, Gully Pits, Chambers, Sumps etc. in ordinary soil (earth, sand, loam and clay) including extra excavation below inverts trimming & dressing of sides, levelling and back filling of trenches by excavated earth in 20 cm layers,watering and ramming the same including removal of surplus earth or other dismantled material up to a distance of 50 meters from the center of trenches and cleaning of site properly after complition of the work. Excavation in ordinary soil.

-

-

-

... More
0.00- 1.5m BGL

1050

-

-

... More
1.5- 3m BGL

787.5

-

-

... More
Supply, carting to site of work of DI pipe K7 Pipe S&S pipe LA tyton joint lowering them into trenches and laying true to alignment and gradient including testing of pipe line but excluding cost of trench of sewer. 1.5- 3.00m BGL

-

-

-

... More
700mm dia

350

-

-

... More
Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered Depth exceeding 1.5 m but not exceeding 3 m

1050

-

-

... More
Sump Cleaning( removing of sludge from sump =(3.14*5.25*5.25*2.5)=216.36cum

1

-

-

... More
Excavation work by machanical means (Hydraulic excavator)/ manual means in foundation trenches or drains not exceeding 1.5 m in width or 10sqm. On plan including dressing of sides ad ramming of bottoms lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m. All kinds of soil

22.5

-

-

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand)

9.11

-

-

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand)

8.63

-

-

... More
Pebble dash plaster upto 10 m height above ground level with a mixture of washed pebble or crushed stone 6 mm to 12.5 mm nominal size, dashed over and including fresh plaster in two layers under layer 12 mm cement plaster 1:4 (1 cement : 4 coarse sand) and top layer 10 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) mixed with 10% finely grounded hydrated lime by volume of cement.

45

-

-

... More
Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 12.5mm nominal size). For One Brick Thick Wall

8.75

-

-

... More
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in-Charge: All kinds of soil

24

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

18

-

-

... More
Part E : – SUPPLY OF DESLUDGING VEHICLE

-

-

-

... More
Trailer Mounted Compact faecal sludge Suction Device, Tank Capacity 700L Captain Mini Tractor, 15 Hp Diesel Engine.

2

-

-

... More
Trailer Mounted Compact faecal sludge Suction Device, Tank Capacity 1000L Captain Mini Tractor, 15 Hp Diesel Engine.

1

-

-

... More
Part F : Annual O & M Prices of SPS except Electricity and Fuel charges (The cost included herein are the yearly cost for plant Operation & maintenance including fixed cost (Cost of Manpower to be deployed, General Maintenance of Civil Structures, preventive and Breakdown Maintenance of Mechanical equipment, Electrical items.) and Variable Cost (Including cost of Disposal of Plant Residuals viz. Screenings, Grits, Dewatered Sludge, etc)

-

-

-

... More
O&M OF SPS AT DHELA BASTI

-

-

-

... More
For 1st year of operation

1

-

-

... More
For 2nd year of operation

1

-

-

... More
For 3rd year of operation

1

-

-

... More
For 4th year of operation

1

-

-

... More
For 5th year of operation

1

-

-

... More
For 6th year of operation

1

-

-

... More
For 7th year of operation

1

-

-

... More
For 8th year of operation

1

-

-

... More
For 9th year of operation

1

-

-

... More
For 10th year of operation

1

-

-

... More
For 11th year of operation

1

-

-

... More
For 12th year of operation

1

-

-

... More
Fo13th year of operation

1

-

-

... More
For 14th year of operation

1

-

-

... More
For 15th year of operation

1

-

-

... More
O&M OF EXISTING SPS AT MAHESHPURA

-

-

-

... More
For 1st year of operation

1

-

-

... More
For 2nd year of operation

1

-

-

... More
For 3rd year of operation

1

-

-

... More
For 4th year of operation

1

-

-

... More
For 5th year of operation

1

-

-

... More
For 6th year of operation

1

-

-

... More
For 7th year of operation

1

-

-

... More
For 8th year of operation

1

-

-

... More
For 9th year of operation

1

-

-

... More
For 10th year of operation

1

-

-

... More
For 11th year of operation

1

-

-

... More
For 12th year of operation

1

-

-

... More
Fo13th year of operation

1

-

-

... More
For 14th year of operation

1

-

-

... More
For 15th year of operation

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.