Pey Jal Nigam Uttarakhand Tender

View complete overview of Uttarakhand Pey Jal Nigam Uttarakhand Tender

Pey Jal Nigam Uttarakhand Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date31 Mar 2023
Closing Date15 Apr 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
25 mm dia

450

-

-

... More
50 mm dia

600

-

-

... More
Excavation of earth for pipe line in following strata lift upto 1.5 m. lead upto 30 m. including refilling, watering , ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m. from trenches including supply of labour T&P etc. all complete Assuming that 90% pipe line is laid in trenches , it is estimated that 75% excavation will be in soil mixed with shingle , bajari & boulders and rest 25% will be in medium rock.

-

-

-

... More
Soil mixed with boulders and bajari

600

-

-

... More
Medium rock

200

-

-

... More
Supply & Fixing Brass G.M. Valve / Wheel Valve in position with Cartage of valves up to site of work and fixing including cost of valves, specials, labour and T&P complete in all respect but excluding the cost of construction of chamber.

-

-

-

... More
50 mm dia

1

-

-

... More
20 mm dia

1

-

-

... More
25 mm dia

1

-

-

... More
constructionof masonry Chamber 60x60x75 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for sluice valve, with C.I. surface box 100mm top diameter, 160 mm bottom diameter and 180 mm deep ( inside) with chained lid and RCC top slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size ) , i/c necessary excavation, foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design With common burnt clay F.P.S.(non modular) bricks of class designation 7.5 with supply of all material, labour and T&P etc. required for proper completion of the work.

3

-

-

... More
Providing and fixing brass ferrule with C.I. mouth cover including boring and tapping the main

20

-

-

... More
Bib Cock with Aerator 15mm dia

20

-

-

... More
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand) in brest wall, retaining walls parapets, scuppers, etc. including supply of all material, labour, T&P and royalties etc. complete.

10

-

-

... More
Supply and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :in 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) proportion in foundation and floors including supply of all material, labour and T&P etc. required for proper completion of the work.

5

-

-

... More
Supply and laying in position cement concrete of specified grade All work up to plinth level in 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) ratio including supply of all material, labour and T&P etc. required for proper completion of the work.

2

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.