Pey Jal Nigam Uttarakhand Tender
View complete overview of Uttarakhand Pey Jal Nigam Uttarakhand Tender
Pey Jal Nigam Uttarakhand Tender
Machinery and Tools
Eprocure
Opening Date3 Dec 2024
Closing Date21 Dec 2024
Tender Amount₹ 61,00,000
Costs
EMD
₹ 1,22,000Document Cost
₹ 4,720Tender Fee
Refer Documents
Summary
Installation Of India Mark Ii Handpump In Block Bahadrabad And Bhagwanpur
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MDPEY_78438_1Tender No
4660/Nivida/87 Dated 29.11.2024Tender Authority
Pey Jal Nigam Uttarakhand ViewPurchaser Address
-Website
http://http://peyjal.uk.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
32 mm dia G.I. medium quality pipe ISI Mark.(Jindal Hisar/TT Swastik)
1050
-
-
... More
Supply and fixing of 12 mm dia galvanised M.S connecting rod 12 mm dia in 3.0 m long .ISI Mark.
70
-
-
... More
Construction of 150 to 250 mm dia bore hole by casing method in soil mixed with bajri or mixed boulder etc. including Excavation of earth pit with proper safety, development of bore by over Pumping and back washing till the discharge is free from turbidity including hiring charge of pumping equipment after this erection of Boring, Dismentling after completion of work also Lowering of PVC pipe assembly in bore hole required for jointing the various components and lowering then in the borehole up to depth.
-
-
-
... More
0 to 80Meter and above
480
-
-
... More
Construction of 150 to 250 mm dia bore hole by Palm Pressure method in soil mixed with bajri or mixed boulder etc. including Excavation of earth pit with proper safety, development of bore by over Pumping and back washing till the discharge is free from turbidity including hiring charge of pumping equipment after this erection of Boring, Dismentling after completion of work also Lowering of PVC pipe assembly in bore hole required for jointing the various components and lowering then in the borehole up to depth.
-
-
-
... More
0 to 75 Meter and above
2175
-
-
... More
Embossing should be done over the hand pump assembly as per departmental circular, as per instructions of the Engineer In charge, including all labour& materials T&P
35
-
-
... More
Disinfections of hand pump using powered Bleaching powder (40% concentrate) complete cleaning of all exterior parts of hand pump coming in contact with water, including supply of bleaching powder.
35
-
-
... More
Supply and fixing of circular precast cocrete plateform and C.C drain (1.0 m) including construction of C.C. block of Sizes 0.76x0.76x0.40 M and other C.C work for plate farm and Drain in P.C.C 1:2:4 for hand pump as per type design and supply of all material, labour T&P etc required for proper completion of work.
35
-
-
... More
Shurrounding & packing graded coarse sand in between the bore hole and the stainer up to three meter depth from the bottom of the strainer including supply of coarse sand , including all labour, jointing materials T&P etc required for proper completion of the work.
35
-
-
... More
Sealing of annular space between the housing pipe and the bore hole in single continuous operation with puddle clay, bentonite clay andcement concrete as per drawing supplied by the department including supply of all material, labour T&P etc. required for completion of work.
35
-
-