Pey Jal Nigam Uttarakhand Tender
View complete overview of Uttarakhand Pey Jal Nigam Uttarakhand Tender
Pey Jal Nigam Uttarakhand Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date13 Nov 2024
Closing Date16 Dec 2024
Tender Amount₹ 6,27,14,000
Costs
EMD
₹ 12,54,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MDPEY_77775_1Tender No
Letter No.2991/Nivida/182 Dated 06.11.2024Tender Authority
Pey Jal Nigam Uttarakhand ViewPurchaser Address
-Website
http://http://peyjal.uk.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
200 mm
1
-
-
250 mm
1
-
-
300 mm
1
-
-
Supply of all materials, labour T&P etc. for construction of boundary wall as per departmental type design required for proper completion of work. At Almiya, Bhantad pumping stations and at main CWR (Gaira Chaura)
150
-
-
Supply and fixing of 3.60 m wide main gate & 1.20 m wide wicket gate including construction of pillars as per departmental type design including supply of all materials, labour, T&P etc. required for proper completion of works.
At Almiya and Bhantad pumping stations
3
-
-
Staff Quarter at Almiya PS
1
-
-
Single seated Toilet with Urinal and Wash basin at Thal PS
1
-
-
Excavation for pipe line trenches including lift up to 1.5 m and lead up to 30 m filling, watering and ramming of Excavated the earth into the trenches or into the sides between foundation trenches or into the plinth and removal.
-
-
-
In soil mixed with shingle boulders etc. (70
%)
3850.21
-
-
In soft rock (30 %)
1650.09
-
-
Distribution newt work (GI pipes)
-
-
-
50 mm dia
7832
-
-
65 mm dia
1403
-
-
80 mm dia
1413
-
-
100 mm dia
2521
-
-
Providing of all materials, Carting from site store to site of work, Lowering into trenches with true to alignment, Laying of MS ERW Pipes grade Yst 210, Jointing by electric welding process with proper grade of electrodes suitable for jointing of water supply pipe lines (Ador, L&T or equivalent electrodes) by cutting of pipes and making required bends by welding, completion of work with testing of pipe line etc complete.
-
-
-
125 mm dia, 3.2 mm thickness (OD 141.3 mm)
1373
-
-
150 mm dia, 2.8 mm thickness (OD 168.3 mm)
386
-
-
200 mm dia, 3.2 mm thickness (OD 219.1 mm)
149
-
-
250 mm dia, 4 mm thickness (OD 273.1 mm)
358
-
-
Testing of pipe samples from authorised institute
10
-
-
Providing and erecting 2.00 metre high temporary barricading at site: each panel of size 2.50mx2.00m made of 40x40x6mm angle iron or 50x50x3mm hollow MS tube posts/horizontal members/ bracings covered with 1.63mm thick MS sheet. The sheet shall be fixed with 30x5mm MS flat by suitable welding/riveting . The panels shall be made so that gap of 50cm above the ground is available making overall height as 2.5m.
50
-
-
Supplying and fixing of following sizes of valves including carting the same up to site of work and fixing the same in water supply lines including cost of valves, specials, labour and T&P complete in all respect but excluding the cost of earth work and construction of chamber. Brass G.M. Valve
-
-
-
50 mm dia
18
-
-
65 mm dia
6
-
-
80 mm dia
3
-
-
Providing & Fixing D.I. D/F Sluice Valves Confirming to IS: 14846-2000 in position including all material, labourer, T&P etc complete.
PN 10:
-
-
-
100 mm dia
9
-
-
125 mm dia
5
-
-
150 mm dia
2
-
-
200 mm dia
2
-
-
250 mm dia
3
-
-
Supplying and Fixing of Fire Hydrant Valve IS 5290 (Flanged) Including carting the same up to site of work and fixing the same and water supply line Including the cost of valves, specials, labour and T&P Complete in all respect.
80 mm diameter
5
-
-
Constructing masonry Chamber 60x60x75 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for sluice valve, with C.I. surface box 100mm top diaM, 160 mm bottom diaMand 180 mm deep ( inside) with chained lid and RCC top slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size )
, ic necessary excavation, foundation concrete 1:5:10(1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design :
27
-
-
Constructing masonry Chamber 90x90x100 cm inside
21
-
-
Constructing masonry chamber for Fire hydrant (60x60x75) cm
5
-
-
Cartage of pipe and special from Rail Head to site of work complete and sand grit etc from query site.
1
-
-
Providing and making house service connections from water supply distribution GI pipe line up to water meter chamber inside the property using GI pipe including supply and fixing of electrofusion saddle
,brass ferrules elbow, ball valve etc complete with earthwork, road cutting with restoration works
-
-
-
New connections
1314
-
-
Shifting from old connection to new
connection
1184
-
-
Providing of all materials, Carting from site store to site of work, Laying & Jointing of G.I screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc) in trenches with its cutting, threading and testing of pipe line etc completing. PIPE CONFORMING TO IS : 1239 (PART-1) Medium class (Class 'B'). (It will be used for those houses which are located beyond 12 meters from taping point)
15 mm dia
3552
-
-
Supply of all labour, material required for restoring of existing house connection which might be damaged during excavation and also shifting all existing connection to new water supply system from existing water supply system complete as per unit estimate and directed by Engineer in-charge. 15 mm size water connections.
59
-
-
15mm AMR Water Meter Class-B Multijet as per IS 779-1994 or ISO-4064-2005 CE
mark IP-68 along with -(i)LORA Based AMR Module of upto 5 km range and with frequency band 865 MHz, maximum power upto 20.5 DBM.(ii) Non rechargble Lithium Ion battery with 5 Years Battary Life considring 1 reading /Day with Reverse
Meter detection.
2500
-
-
SITC of Fixed Network Gatway with Antennas for best connectivity to the Water Meter AMR.4G /LAN / Wi-Fi Setup Required for Sending DATA to Server Range Upto 5 km Communication, all field Instrument & Radio frequency based AMR Meter communication etc Complete(Depends on Site Location)
5
-
-
SITC of Simple and user friendly AMR softaware Interface for Viewing each Water Meter data for water consumption status, Battery consumption status and meter working status etc Complete.
1
-
-
Annual Cloud Server Charges per water meter
2500
-
-
Polycarbonate Box Blue with transparent lid,must have option to seal the box, min three seal option with two iron angle to fix the box.◻
Size- length-255mm , width-210 mm,height-
190 mm
2500
-
-
Dismantling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge:
Bituminous road
2718.3
-
-
Dismantling of following type of road surface for laying of pipe line including sorting out of serviceable materials and disposal of unserviceable materials.:
C.C. Road
77.1
-
-
Dismantling Interlocking block pavement Road
222
-
-
Construction of Un-reinforced ,Cement concrete pavement, thickness as per design, over a prepared sub base with 43 grade cement or any other type PCC Grade M-30, Coarse and fine aggregate conforming to IS:383, maximum size od coarse aggregate not exceeding 25mm, mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of wedges. steel plates including levelling the formwork and laying and fixing of 125 micron thick polythene film, as per drawing), spreading the concrete with shovels, rakes, compacted using needle, and
77.1
-
-
Reinstatement of katchi Patri and disposal of dismantled materials up to a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202
2609.4
-
-
Interlocking concrete block pavement-80mm thick (M-35)
222
-
-
Automation Works at Stage-I (I/W)
-
-
-
GSM BASED REMOTE TERMINAL UNITS WITH Analog and Digital, I/O, Parameter and features as specified to store and transmit data on GSM based to LMS and also compatible to satellite communication for Four Pump's (RTUs shalls be integrated with the starter Panels) & power backup of 1 No. UPS rating as per site requirement.
2
-
-
GSM based wireless communication hardware for RTUs capable to transfer data from remote site to MCS/LMS with all accessories.
2
-
-
Energy meters suitable for automation
4
-
-
CSD/F Valve and/or acutuators of 150/200 mm dia valve of class 300 ASA.
4
-
-
Actuator Panels & Pressure transmitter
4
-
-
Hard wired timer circuit for actuators
4
-
-
Level transmitter
2
-
-
Isolation Transformer (440 V step down 220 V for protection of site automation)
4
-
-
Over voltage & under voltage trip protection (350V-450V).
4
-
-
Control cable between RTU and field instruments/ control panel
-
-
-
Single cabling between RTU and field instruments, 2 Core x 1.5 PVC coated flexible screened cable
150
-
-
4 Core x 2.5 sq mm Cu Power cable for valve actuator
100
-
-
10C x 1.5 sq mm PVC coated flexible unscreened Cu cable
50
-
-
Conduct Pipe 1" PVC
25
-
-
Conduct Pipe 1.5" PVC
15
-
-
Accessories like conduct pipe flexible pipes, PVC bend, AC & DC relays with base, lugs etc.
3
-
-
Erection, Commissioning and Customization of IRTU and Software at site
2
-
-
Erection, Commissioning and Customization of Actuator, Actuator Penel and Energy Meter at site.
2
-
-
Dismantling of existing Headear, Valves & related accessories to accomated CSD/F, CID/F Valve &/OR actuators as per site requirement complete.
1
-
-
Supply & fixing of common header 250 mm OR as per site requirement MS ERW Pipe.
1
-
-
Automation Works at Stage-II
-
-
-
GSM BASED REMOTE TERMINAL UNITS WITH Analog and Digital, I/O, Parameter and features as specified to store and transmit data on GSM based to LMS and also compatible to satellite communication for Four Pump's (RTUs shalls be integrated with the starter Panels) & power backup of 1 No. UPS rating as per site requirement.
2
-
-
GSM based wireless communication hardware for RTUs capable to transfer data from remote site to MCS/LMS with all accessories.
2
-
-
Energy meters suitable for automation
4
-
-
CSD/F Valve and/or acutuators of 150/200 mm dia valve of class 300 ASA.
4
-
-
Actuator Panels & Pressure transmitter
4
-
-
Hard wired timer circuit for actuators
4
-
-
Level transmitter
2
-
-
Isolation Transformer (440 V step down 220 V for protection of site automation)
4
-
-
Over voltage & under voltage trip protection (350V-450V)
4
-
-
Control cable between RTU and field instruments/ control panel
-
-
-
(i)- Single cabling between RTU and field instruments, 2 Core x 1.5 PVC coated flexible screened cable
150
-
-
(ii)- 4 Core x 2.5 sq mm Cu Power cable for valve actuator
100
-
-
(iii)- 10C x 1.5 sq mm PVC coated flexible unscreened Cu cable
50
-
-
(iv)- Conduct Pipe 1" PVC
25
-
-
(v)- Conduct Pipe 1.5" PVC
15
-
-
Hard wired timer circuit for actuators
4
-
-
Accessories like conduct pipe flexible pipes, PVC bend, AC & DC relays with base, lugs etc.
3
-
-
Erection, Commissioning and Customization of IRTU and Software at site
2
-
-
Erection, Commissioning and Customization of Actuator, Actuator Penel and Energy Meter at site.
2
-
-
Dismantling of existing Headear, Valves & related accessories to accomated CSD/F, CID/F Valve &/OR actuators as per site requirement complete.
1
-
-
Supply & fixing of common header 250 mm OR as per site requirement MS ERW Pipe.
1
-
-
Automation Works at Stage-III
-
-
-
GSM BASED REMOTE TERMINAL UNITS WITH Analog and Digital, I/O, Parameter and features as specified to store and transmit data on GSM based to LMS and also compatible to satellite communication for Four Pump's (RTUs shalls be integrated with the starter Panels) & power backup of 1 No. UPS rating as per site requirement.
2
-
-
GSM based wireless communication hardware for RTUs capable to transfer data from remote site to MCS/LMS with all accessories.
2
-
-
Energy meters suitable for automation
4
-
-
CSD/F Valve and/or acutuators of 150/200 mm dia valve of class 300 ASA.
4
-
-
Actuator Panels & Pressure transmitter
4
-
-
Hard wired timer circuit for actuators
4
-
-
Level transmitter
2
-
-
Isolation Transformer (440 V step down 220 V for protection of site automation)
4
-
-
Over voltage & under voltage trip protection (350V-450V)
4
-
-
Control cable between RTU and field instruments/ control panel
-
-
-
Single cabling between RTU and field instruments, 2 Core x 1.5 PVC coated flexible screened cable
150
-
-
4 Core x 2.5 sq mm Cu Power cable for valve actuator
100
-
-
10C x 1.5 sq mm PVC coated flexible unscreened Cu cable
50
-
-
Conduct Pipe 1" PVC
25
-
-
Conduct Pipe 1.5" PVC
15
-
-
Accessories like conduct pipe flexible pipes, PVC bend, AC & DC relays with base, lugs etc.
3
-
-
Erection, Commissioning and Customization of IRTU and Software at site
2
-
-
Erection, Commissioning and Customization of Actuator, Header, CSD/F, CID/F Valve Actuator Penel and Energy Meter at site.
2
-
-
Dismantling of existing Headear, Valves & related accessories to accomated CSD/F, CID/F Valve &/OR actuators as per site requirement complete.
1
-
-
Supply & fixing of common header 250 mm OR as per site requirement MS ERW Pipe.
1
-
-
Trial & Testing Run for 06 Months
1
-
-
Unforseen items
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%