Pey Jal Nigam Uttarakhand Tender
View complete overview of Uttarakhand Pey Jal Nigam Uttarakhand Tender
Pey Jal Nigam Uttarakhand Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date7 Nov 2022
Closing DateCancelled
Tender AmountRefer Documents
Costs
EMD
₹ 28,000Document Cost
₹ 1,770Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_MDPEY_51318_1Bid Award Id
ViewTender No
4763/535/258 Dated 03/11/2022Tender Authority
Pey Jal Nigam Uttarakhand ViewPurchaser Address
-Website
http://http://peyjal.uk.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
25 mm dia
260
-
-
... More
20 mm dia
700
-
-
... More
15 mm dia
830
-
-
... More
Dismantling of following dia screwed and socketed G.I. Pipes, specials and fittings including taking out of dismantled G.I. pipes and specials from trenches and stacking them properly within 50.00m.m but excluding the cost of earth work
-
-
-
... More
50 mm dia
220
-
-
... More
40 mm dia
430
-
-
... More
32 mm dia
100
-
-
... More
25 mm dia
200
-
-
... More
20 mm dia
300
-
-
... More
Excavation of earth for pipe line in following strata lift upto 1.5 m. lead upto 30 m. including refilling, watering , ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60 m. from trenches including supply of labour T&P etc. all complete.
-
-
-
... More
Soil mixed with boulders and bajari
829.85
-
-
... More
Medium rock
276.62
-
-
... More
Relaying of dismantled G.I.Pipe in true alignment in trenches including supply of all materials,labour,T&P etc. complete.
-
-
-
... More
50 mm dia
220
-
-
... More
40 mm dia
430
-
-
... More
32 mm dia
100
-
-
... More
25 mm dia
200
-
-
... More
20 mm dia
300
-
-
... More
Supply & Fixing Brass G.M. Valve / Wheel Valve in position with Cartage of valves up to site of work and fixing including cost of valves, specials, labour and T&P complete in all respect but excluding the cost of construction of chamber.
-
-
-
... More
50 mm dia
2
-
-
... More
40 mm dia
1
-
-
... More
20 mm dia
3
-
-
... More
constructionof masonry Chamber 60x60x75 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for sluice valve, with C.I. surface box 100mm top diameter, 160 mm bottom diameter and 180 mm deep ( inside) with chained lid and RCC top slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size ) , i/c necessary excavation, foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design With common burnt clay F.P.S.(non modular) bricks of class designation 7.5 with supply of all material, labour and T&P etc. required for proper completion of the work.
6
-
-
... More
Providing and fixing with all materials T&P labour Functional House Hold aerated Tap Connection etc complete. (Including 6 meter G. I. pipe length)
16
-
-
... More
Supply and installation of Bucket Type Chlorinator of 25 L Capacity
1
-
-
... More
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand) in brest wall, retaining walls parapets, scuppers, etc. including supply of all material, labour, T&P and royalties etc. complete.
12
-
-
... More
Supply and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :in 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) proportion in foundation and floors including supply of all material, labour and T&P etc. required for proper completion of the work.
6
-
-
... More
Supply and laying in position cement concrete of specified grade All work up to plinth level in 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) ratio including supply of all material, labour and T&P etc. required for proper completion of the work.
4
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements