Mussoorie Dehradun Development Authority Tender

View complete overview of Uttarakhand MDDA Tender

Mussoorie Dehradun Development Authority - MDDA Tender

Works
Agriculture or Forestry Works
Eprocure
Opening Date7 Dec 2024
Closing Date12 Dec 2024
Tender Amount₹ 2,34,05,798.42 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Landscaping Work /arboriculture Work At Gangotri Vihar Near Rispana River Edge

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
2.27 D.S.R. 2023- Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.

7.26

2123

15418.43

... More
4.1.8 D.S.R. 2023- SUB WORK NO. 3 :- PLAIN CEMENT CONCRETE- Providing and laying in position cement concrete 1:4:8 (1cement :4 coarse sand:08graded brick aggregated 40mm .nominal size.) excluding the cost of centering and shuttering - All work upto plinth level

17.8

6812

121253.6

... More
4.17 D.S.R. 2023- SUB WORK NO. 4 : - PLINTH PROTECTION- Making plinth protection 50mm thick of cement concrete 1:3:6 (1cement :3 coarsesand : 6graded stoneaggregate 20mm nominal size) over 75mm bed by dry brick ballast 40mm nominal size well rammed and consolidated and grouted with fine sand including finishing the top smooth

88

749

65938.4

... More
5.33.1 D.S.R. 2023- SUB WORK NO. 5 : - REINFORCED CEMENT CONCRETE- Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note :- Cement content considered in this item is @ 330 kg/cum.“Excess/ less cement used as per design mix is payable/recoverable separately).All works upto plinth level

12.9

9504

122573.26

... More
5.9.1 D.S.R. 2023- SUB WORK NO 6 : - CENTER & SHUTTERING- Centering shuttering including strutting, propping etc. and removal of form work FOUNDATION UP TO PLINTH

99

392

38822.85

... More
5.22.6 D.S.R. 2023- SUB WORK NO 7 : - REINFORCEMENT OF STEEL - Reinforcement for R.C.C work including straighting,cutting,bending ,placing in position and bending all complete Thermo-Mechanically Treated bars.

1265

107

136430.25

... More
6.4.2 D.S.R. 2023 SUB WORK NO 8 : - BRICK WORK IN FOUNDATION AND SUPER STRUCTURE- Brick work with F.P.S bricks of class 75 in super structure above structure above plinth level up to floor five level in all shapes and sizes in cement mortar 1:6 (1 cement : 6 coarse sand )

4.55

9105

41432.07

... More
16.86.1 D.S.R. 2023- SUB WORK NO. 9a: - FLOORING - Providing and laying gang saw cut 18 mm thick, mirror polished pre moulded and pre polished machine cut granite stone of required size and shape of approved shade, colour and texture in footpath, flooring cut granite stone of required size and shape of approved shade, colour and texture in footpath, flooring in road side plazas and similar locations, laid over 20 mm thick base of cement mortar 1:4 (1cement : 4 coarse sand) including grouting the joints with white cement mixed with matching pigment, epoxy touch ups etc. complete as per direction of Engineer-in-Charge. 16.86.1 With granite stone of area less than 0.50 sqm.

151.58

4746

719429

... More
D.S.R 10.2- SUB WORK NO. 10 : - SHED WORK - Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

3037.65

133

406133.81

... More
D.S.R 13.48.3- Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand or manufacture

273.6

170

46703.52

... More
D.S.R 12.1.3- Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.0.63 mm thick with zinc coating not less than 275 gm/ m²

125

1087

135956.25

... More
D.S.R 10.28- SUB WORK NO. 11 : - RAILING - Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

891

772

688208.4

... More
Pergola - 2.8.1 D.S.R. 2023- SUB WORK NO. 1 :- EXCAVATION WORK- Earth work in excavation in trenches for foundation and for pipes cables etc. in ordinary soil including fitup to 1.5m and dressing of sides and ramming bottoms and disposal of surplus excavated earth as directed by the engineer with in a lead of 50m.

22.89

260

5959.31

... More
2.25 D.S.R. 2023- SUB WORK NO.2: -BACK FILLING OF EARTH , CARTAGE OF EARTH WORK & SAND FILLING - Filling available excavated earth (excluding rock) in trenches ,plinth,sides of foundation etc . in layers not exceeding 20cm in depth ,consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m .

16.03

196

3141.1

... More
2.27 D.S.R. 2023 Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.

2.9

2123

6167.37

... More
4.1.8 D.S.R. 2023 - SUB WORK NO. 3 :- PLAIN CEMENT CONCRETE- Providing and laying in position cement concrete 1:4:8 (1cement :4 coarse sand:08graded brick aggregated 40mm .nominal size.) excluding the cost of centering and shuttering - All work upto plinth level

7.11

6812

48433.32

... More
4.17 D.S.R. 2023- SUB WORK NO. 4 : - PLINTH PROTECTION- Making plinth protection 50mm thick of cement concrete 1:3:6 (1cement :3 coarsesand : 6graded stoneaggregate 20mm nominal size) over 75mm bed by dry brick ballast 40mm nominal size well rammed and consolidated and grouted with fine sand including finishing the top smooth

35.2

749

26375.36

... More
5.33.1 D.S.R. 2023- SUB WORK NO. 5 : - REINFORCED CEMENT CONCRETE- Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note :- Cement content considered in this item is @ 330 kg/cum.“Excess/ less cement used as per design mix is payable/recoverable separately).All works upto plinth level

3.35

9504

31840.91

... More
5.9.1 D.S.R. 2023- SUB WORK NO 6 : - CENTER & SHUTTERING- Centering shuttering including strutting, propping etc. and FOUNDATION UP TO PLINTH removal of form work

42.4

392

16627.16

... More
5.22.6 D.S.R. 2023- SUB WORK NO 7 : - REINFORCEMENT OF STEEL Reinforcement for R.C.C work including straighting,cutting,bending ,placing in position and bending all complete Thermo-Mechanically Treated bars.

329

107

35482.65

... More
6.4.2 D.S.R. 2023- SUB WORK NO 8 : - BRICK WORK IN FOUNDATION AND SUPER STRUCTURE- Brick work with F.P.S bricks of class 75 in super structure above structure above plinth level up to floor five level in all shapes and sizes in cement mortar 1:6 (1 cement : 6 coarse sand )

1.21

9105

11018.2

... More
16.86.1 D.S.R. 2023- SUB WORK NO. 9a: - FLOORING - Providing and laying gang saw cut 18 mm thick, mirror polished pre moulded and pre polished machine cut granite stone of required size and shape of approved shade, colour and texture in footpath, flooring cut granite stone of required size and shape of approved shade, colour and texture in footpath, flooring in road side plazas and similar locations, laid over 20 mm thick base of cement mortar 1:4 (1cement : 4 coarse sand) including grouting the joints with white cement mixed with matching pigment, epoxy touch ups etc. complete as per direction of Engineer-in-Charge. 16.86.1 With granite stone of area less than 0.50 sqm.

38.72

4746

183772.86

... More
D.S.R 10.2- SUB WORK NO. 10 : - SHED WORK - Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

941.56

133

125886.04

... More
D.S.R 13.48.3 - Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand or manufacture

58.24

170

9941.57

... More
Pathway - 2.6.1 D.S.R. 2023- Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. 2.6.1 All kinds of soil

333.9

177

59267.25

... More
16.78.1 D.S.R. 2023- Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineerin- Charge. With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30

177.17

2784

493241.28

... More
4.1.5 D.S.R. 2023- Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand (zone-lll) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)

111.34

7294

812191.9

... More
16.68 D.S.R. 2023- Providing and laying 60 mm thick faciory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge.

1112.71

972

1081554.12

... More
Deck - 2.8.1 D.S.R. 2023- SUB WORK NO. 1 :- EXCAVATION WORK- Earth work in excavation in trenches for foundation and for pipes cables etc. in ordinary soil including fitup to 1.5m and dressing of sides and ramming bottoms and disposal of surplus excavated earth as directed by the engineer with in a lead of 50m.

12.15

260

3162.65

... More
2.25 D.S.R. 2023- SUB WORK NO.2: -BACK FILLING OF EARTH , CARTAGE OF EARTH WORK & SAND FILLING - Filling available excavated earth (excluding rock) in trenches ,plinth,sides of foundation etc . in layers not exceeding 20cm in depth ,consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m .

8.51

196

1666.98

... More
4.1.8 D.S.R. 2023- SUB WORK NO. 3 :- PLAIN CEMENT CONCRETE- Providing and laying in position cement concrete 1:4:8 (1cement :4 coarse sand:08graded brick aggregated 40mm .nominal size.) excluding the cost of centering and shuttering - All work upto plinth level

1.89

6812

12901.93

... More
4.17 D.S.R. 2023- SUB WORK NO. 4 : - PLINTH PROTECTION- Making plinth protection 50mm thick of cement concrete 1:3:6 (1cement :3 coarsesand : 6graded stoneaggregate 20mm nominal size) over 75mm bed by dry brick ballast 40mm nominal size well rammed and consolidated and grouted with fine sand including finishing the top smooth

35.2

749

26375.36

... More
5.33.1 D.S.R. 2023- SUB WORK NO. 5 : - REINFORCED CEMENT CONCRETE- Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note :- Cement content considered in this item is @ 330 kg/cum.“Excess/ less cement used as per design mix is payable/recoverable separately).All works upto plinth level

4.13

9504

39264.12

... More
5.9.1 D.S.R. 2023- SUB WORK NO 6 : - CENTER & SHUTTERING- Centering shuttering including strutting, propping etc. and removal of form work FOUNDATION UP TO PLINTH

42.4

392

16627.16

... More
5.22.6 D.S.R. 2023- SUB WORK NO 7 : - REINFORCEMENT OF STEEL - Reinforcement for R.C.C work including straighting,cutting,bending ,placing in position and bending all complete Thermo-Mechanically Treated bars.

642

107

69239.7

... More
26.62 D.S.R 2023- SUB WORK NO. 8 : - STEEL WORK- Designing, Providing, installing and fixing factory finished customed design pregalvanized high tensile steel joists manufactured from G350 Z275 confirming to IS:277-1992, minimum coating of galvanizing 275 gm/ sqm, minimum yield stress 35 MPa & minimum tensile strength of 380 MPa placed 1.23 metre apart to support the load of slab etc as per the design & directions of Engineer-in-Charge

1064.28

182

193752.17

... More
26.65 D.S.R 2023- Providing and fixing roofing consist of 0.8 mm thick galvanized steel deck sheet confirming to IS 277:1992 used as permanent shuttering over which MS wire mesh 3 mm laid at 100x100 mm grid including edge trim covered with concrete. This metal deck will be supported on structural steel beam with shear studs. (Structural steel like Beam, column, joists etc. & concrete of different grade as per design will be paid separately).

6.6

1525

10068.96

... More
10.25.2 D.S.R 2023- Designing, Providing, installing and fixing factory finished customed design pregalvanized high tensile steel joists manufactured from G350 Z275 confirming to IS:277-1992, minimum coating of galvanizing 275 gm/ sqm, minimum yield stress 35 MPa & minimum tensile strength of 380 MPa placed 1.23 metre apart to support the load of slab etc as per the design & directions of Engineer-in-Charge

162

172

27961.2

... More
Sandpark - 2.27 D.S.R. 2023- Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.

111.61

2123

237035.99

... More
2.6.1 D.S.R. 2023- Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.

25.65

177

4552.88

... More
2.25 D.S.R. 2023- Filing available excavated earth in trenches ,plinth,sides of foundation tec.in layers not exceeding 20cm in the depth ,consolidation each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m

17.96

196

3519.18

... More
4.1.8 D.S.R. 2023- Providing and laying in cement concrte 1:4:8(1cement :4fine sand:08graded brick aggregated 40mm .nominal size.) and curing complete excluding cost of form work in foundation and floors.

5.7

6812

38828.4

... More
5.1.2 D.S.R. 2023- Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size).

3.28

9045

29670.06

... More
5.9.5 D.S.R. 2023- Centering shuttering including strutting, propping etc. and removal of form work- Beam

13.5

736

9941.4

... More
D.S.R. CODE 5.22.6- Reinforcement for R.C.C work including straighting,cutting,bending ,placing in position and bending all complete TMT

257

107

27717.45

... More
6.1.2 D.S.R. 2023- Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand)

26.24

7132

187150.24

... More
D.S.R. CODE 13.2.2- 15mm thick plaster on the plain in side of mix 1:6 mortor

107.35

383

41115.05

... More
D.S.R. CODE 13.47.1 - Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)

107.35

171

18367.59

... More
10.28 D.S.R. 2023- Steel work welded in built up sections/ framed railings, work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.

641.25

172

110679.75

... More
Meditation - 2.6.1 D.S.R. 2023 - Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. 2.6.1 All kinds of soil

30.64

177

5438.6

... More
16.78.1 D.S.R. 2023- Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineerin- Charge. With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30

10.21

2784

28424.64

... More
4.1.5 D.S.R. 2023- Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand (zone-lll) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)

10.21

7294

74478.89

... More
16.86.1 D.S.R. 2023 - Providing and laying gang saw cut 18 mm thick, mirror polished pre moulded and pre polished machine cut granite stone of required size and shape of approved shade, colour and texture in footpath, flooring cut granite stone of required size and shape of approved shade, colour and texture in footpath, flooring in road side plazas and similar locations, laid over 20 mm thick base of cement mortar 1:4 (1cement : 4 coarse sand) including grouting the joints with white cement mixed with matching pigment, epoxy touch ups etc. complete as per direction of Engineer-in-Charge.

102.14

4746

484776.87

... More
Pixel park -2.6.1 D.S.R. 2023- Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. 2.6.1 All kinds of soil

23.63

177

4194.33

... More
16.78.1 D.S.R. 2023- Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineerin- Charge. With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30

11.81

2784

32879.04

... More
4.1.5 D.S.R. 2023- Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand (zone-lll) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)

7.88

7294

57482.24

... More
4.1.2 D.S.R. 2023- Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:17%:3 (1 Cement: 1% coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)

11.81

8340

98505.44

... More
Playing Equipments - Providing and Installation of Wave slide ladder structure 35 mm x 5 mm angle iron, Slide Structure Fibre Glass 5 mm thick heavy sheet slide height 1.80 m withslide length 3.60 m

2

51600

103200

... More
Providing and Installation of Double Swing Side Pipe 60 mm upper pipe 75 mm Seat Iron with Rubber Belt Chain 6 mm with Heavy Duty Bearing

2

25000

50000

... More
Providing and Installation of Seesaw height 0.50 m main frame 35 mm NB pipe, support 25 mm NB pipe, Seat Iron, Capacity 2 Childrens

3

7500

22500

... More
Providing and Installation of Mary Go Round Central Pipe 50 mm Railing Pipe 25 mm with base of 16 mm Gauage single Sheet (Without Joints) Diameter 1.70 m with heavy duty bearing

2

47900

95800

... More
2.6.1 D.S.R. 2023- Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. 2.6.1 All kinds of soil

234.12

177

41556.3

... More
16.78.1 D.S.R. 2023- Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineerin- Charge. With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30

117.12

2784

326062.08

... More
4.1.5 D.S.R. 2023- Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand (zone-lll) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)

78.05

7294

569351.34

... More
4.1.2 D.S.R. 2023- Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:17%:3 (1 Cement: 1% coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)

117.12

8340

976880.35

... More
Fixing of Statue

1

150000

150000

... More
Sittings - 5.15 D.S.R. 2023- Providing, transporting, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete in lintels, beams and bressumers, including setting in cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centering and shuttering but , excluding the cost of reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)

1.98

13899

27520.42

... More
5.22.6 D.S.R. 2023- Reinforcement for R.C.C work including straighting,cutting,bending ,placing in position and bending all complete Thermo-Mechanically Treated bars.

155

107

16716.75

... More
Horticulture - 2.31 Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. sqm 12.25

5149.5

12

63081.38

... More
2.6 Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan), including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m,as per directions of Engineer in Incharge. 2.6.1 All kinds of soil cum 169.25

3089.7

169

522931.73

... More
2.1 Trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure). cum 78.1

3089.7

78

241305.57

... More
2.29 Ploughing the existing ground to a depth of 15 cm to 25 cm and watering the same. 2.29.1 All kinds of soil sqm 24.15

5149.5

24

124360.43

... More
2.2 Supplying and stacking of good earth at site including royalty and carriage upto 5 km lead complete (earth measured in stacks will be reduced by 20% for payment). cum 515.60 .0 CARRIAGE OF MATERIALS 1.1.2 Earth Rs.215.67=731.27

3089.7

731

2259404.92

... More
2.3 Supplying and stacking sludge at site including royalty and carriage upto 5 km lead complete (sludge measured in stacks will be reduced by 8% for payment). cum 294.00

1029.9

294

302790.6

... More
2.4 Supplying and stacking at site dump manure from approved source, including carriage upto 5 km lead complete (manure measured in stacks will be reduced by 8% for payment) :2.4.3 Screened through sieve of I.S. designation 4.75 mm cum 319.9

1029.9

319

329465.01

... More
2.8 Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately). cum 52.35

1544.85

52

80872.9

... More
2.9 Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge cum 36.55

3089.7

36

112310.6

... More
2.7 Fine dressing of the ground. sqm 3.70

5149.5

3

19053.15

... More
Mulberry height 8-10 feet-

30

800

24000

... More
Fig plants height 8-10 feet-

30

1500

45000

... More
sapota height 8-10 feet-

30

500

15000

... More
Ber height 8-10 feet-

30

450

13500

... More
akarkara height 8-10 feet-

30

800

24000

... More
Mango height 8-10 feet-

30

1500

45000

... More
kaith height 8-10 feet-

30

1500

45000

... More
mahua height 8-10 feet-

30

1800

54000

... More
pomgranet height 8-10 feet-

30

1900

57000

... More
yellow oleander height 8-10 feet-

30

150

4500

... More
palash height 8-10 feet-

30

1200

36000

... More
10326 Plumeria alba dwarf height 90-105 cm. with 3-4 branches and thick stem in big size HDPE bag Each 750.00

50

750

37500

... More
10327 Plumeria rubra height 120-150 cm., 3-4 branches and thick stem in big size HDPE bag Each 400.00

50

400

20000

... More
5.32 Providing and Displaying Furcaria Variegated hybrid well developed with fresh & healthy foliage 20 and above attractive leaves in 35 cm Cement Pot as per direction of the officer-in-charge. Each 451.00

100

451

45100

... More
5.33 Providing and Displaying Golden Bottle brush Topiary well developed with fresh & healthy foliage 5 to 6 big ball 115 to 180 cm ht in 40 cm Cement Pot as per direction of the officer-in-charge. Each 973.75

65

973

63293.75

... More
10192 Bougainvillea named variety, Sobhra, Thima, Marry palmar, Cherry Blossom etc. well developed with fresh & healthy bushy plant in full bloom 75 to 90 cm ht. plant in 40 cm Cement Pot Each 315.00

90

315

28350

... More
10197 Cyprus golden well shaped developed with good colored foliage fresh & healthy 60 to 75 cm ht in 30 cm Earthen Pot Each 420.00

60

420

25200

... More
10205 Ficus reginold well developed fresh & healthy foliage 60 to 75 cm spread 105 to 120 cm ht. plant, Bushy plant in 35 cm Cement Pot Each 368.00

10

368

3680

... More
10282 Ficus benjamina (green) height 150-165 cm., bushy with healthy branches and lush green foliage in big size HDPE bag Each 180.00

200

180

36000

... More
10210 Foxtail palm well developed with fresh & healthy foliage of ht. plant 210 to 240 cm in big 40 cm Cement Pot Each 1155.00

20

1155

23100

... More
5.15 Providing and Displaying Cycus revoluta specimen , having 45 to 50 fresh and healthy, leaves having 30cm to 35cm circumfrance of base stem well developed in 40 cm challi, as per direction of the officer-in-charge. Each 1537.5

50

1537

76875

... More
4.89 Providing and stacking of plant Canna dwarf of height 25 to 30 cm., 2 to 3 suckers in earthen pots of size 20 cm Earthen Pot/Plastic Pot and as per direction of the officer-in-charge. Each 35.90

500

35

17950

... More
6.12 Providing and stacking of Duranta Golden, having ht.15 to 20 cm bushty shape with fresh and healthy leaves in 15 cm size of Earthen Pot/Plastic Pot & as per direction of the officer-in-charge.. Each 20.00

2600

20

52000

... More
6.17 Providing and stacking of Iresine herbstii, of height 25-30 cm., full of branches well developed in 15 cm size of Earthen Pot/Plastic Pot & as per direction of the officer-in-charge. Each 20.00

2600

20

52000

... More
8.33 Providing and stacking of Hamelia patens of height 90-105 cm. bushy in big size HDPE bags as per direction of the officer-in-charge. Each 100.00

2000

100

200000

... More
8.40 Providing and stacking of Hibiscus variegated of height 60-75 cm. with healthy variegated foliage in earthen pots size 25 cm as per direction of the officer-in-charge. Each 55.00

2000

55

110000

... More
8.59 Providing and stacking of Tabernaemontana coronaria (Chandni single) of height 75-90 cm. with 5-6 branches in bag of size 25 cm as per direction of the officer-in-charge. Each 45.00

2000

45

90000

... More
10349 Caesalpinia pulcherrima species of height 45-60 cm. in earthen pot of size 20 cm Each 45.00

500

45

22500

... More
10409 Tabernaemontana divaricata (Chandni double) of height 90-105 cm., bushy in big size HDPE bag Each 90.00

1500

90

135000

... More
6.10 Providing and stacking of Cuphea chinensis of ht. 20-30 cm full of branches and healthy foliage in 15 cm size of Earthen Pot/Plastic Pot & as per direction of the officer-in-charge. Each 20.00

1500

20

30000

... More
6.11 Providing and stacking of Daniella variegated, with 3 to 4 variegated leaves in 20 cm size of Earthen Pot/Plastic Pot & as per direction of the officer-in-charge. Each 30.00

1000

30

30000

... More
8.55 Providing and stacking of Plumbego capensis well developed with fresh and healthy 30 to 45 cm ht., with bloom in 20 cm Earthen Pot/Plastic Pot as per direction of the officer-in-charge. Each 60.00

500

60

30000

... More
Bauhinia variegata height 8-10 feet-

200

1200

240000

... More
Bombax ceiba height 8-10 feet-

200

1000

200000

... More
Butea monosperma height 8-10 feet-

200

1200

240000

... More
cassia fistula height 8-10 feet-

200

1200

240000

... More
Azadirechta indica height 8-10 feet-

200

500

100000

... More
largerstomia indica height 8-10 feet-

200

800

160000

... More
Saraca Ashoka height 8-10 feet-

200

800

160000

... More
Dalbergia sissoo height 8-10 feet-

200

500

100000

... More
Ficus bengalensis height 8-10 feet-

200

1400

280000

... More
Drumstick height 8-10 feet-

400

800

320000

... More
2.14 Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) 2.14.3 Holes 60 cm dia, and 60 cm deep Each 43.75

2330

43

101937.5

... More
2.57 Plantation of Trees 2.57.1 Trees Plant Each 7.30

2330

7

17009

... More
2.57 Plantation of 2.57.2 Shrubs Plant Each 3.65

8590

3

31353.5

... More
2.57 Plantation of 2.57.3 Hedge Plant /Ground cover Each 2.45

7700

2

18865

... More
2.34 Providing & laying Selection no. 1 doob grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the same maintenance for 30 days or more till the grass establish properly,as per direction of officer in charge Per Sqm 87.50

840

87

73500

... More
2.28 Preparation of mounds of various size and shape by available excavated / supplied earth in layers not exceeding 20 cm in depth, breaking clods, watering of each layer, dressing etc., lead upto 50 meter and lift upto 1.5 m complete as per direction of Officer-in-charge. Cum 456.35

900

456

410715

... More
Bonsai of Ficus religiosa

2

5000

10000

... More
Bonsai of kikar/babool

2

5000

10000

... More
Bonsai of Banyan tree

2

5000

10000

... More
Black bamboo

2

3500

7000

... More
Buddha belly bamboo

10

1200

12000

... More
Agave sp

20

500

10000

... More
Aloe vera

20

100

2000

... More
Ball Cactus (Parodia magnifica)

20

500

10000

... More
Bunny Ear Cactus (Opuntia microdasys

20

500

10000

... More
Christmas Cactus (Schlumbergera sp

20

250

5000

... More
Cobweb Houseleek (Sempervivum arachnoideum

40

250

10000

... More
Crinkle Leaf Plant (Adromischus cristatus)

40

350

14000

... More
Hens and Chicks (Sempervivum tactorum

40

260

10400

... More
Devil’s Backbone (Bryophyllum Sp

40

500

20000

... More
Easter Lily Cactus (Echinopsis eyriesii)

40

450

18000

... More
Jade Plant (Crassula ovata)

40

200

8000

... More
Jelly Bean or Pork and Beans (Sedum rubrotinctum)

40

200

8000

... More
Mali (4 mali in a month x 60 month x 26 mandays)0140 Mali Day 695.00

6240

695

4336800

... More
Extra work as site requairement

1

700000

700000

... More
Add 6% GST

1

782850

782850.3

... More
Overall CONTINGENCIES @ 3%

1

739419

739419



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.