Military Engineer Services Tender

View complete overview of Uttarakhand MES Tender

Military Engineer Services - MES Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date1 May 2025
Closing Date28 May 2025
Tender Amount₹ 45,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Condensor fan Motor along with condenser fan blade. Make:-Make: GE/Crompton/ Coolmaster/Kirloskar/Copeland

10

-

-

... More
PVC float valve 15mm dia with epoxy coated aluminium rod and high density plastic ball min weight 142 gms with Nipple & long screws. Make: Prayag/ Polymers Pvt Ltd/Polytuff

10

-

-

... More
M&L For Preventive Maintenance ( i.e Checking of Loose connection, Leakage of water ,Filter Cartage, Damage of any part Water Purifier and Water Pump , relay ) and overhauling of Water Purification plant of 500 LPH capacity installed at VB Mess and replacement of damged /unsv parts of Water Purifier. Note : The spare part mentioned in item below required for replacement shall be measured and paid separately under the relevent item of schedule "A"as supply only rate for fixing of new items. (iii) The quoted rate deemed to inclusive of cost of Very small items required for repair such as nuts,bolts,washer , connecting wire of standard quality, PVC insulated and sheathed cable 3 core 1.5 sqmm stranded copper conductor, (push button), 6 Amp /16 Amp Plug Top (PVC/Metallic), Controlling Knob (Selector switch) , tube jointer, bulkhead, elbow, flexible pipe 1/4'' to 1'', Flow resistor etc is included in this item. (iv) The T&P required for repair and replacement of equipments will be provided by the Contractor. (v) This is to bring attention of Contractor that All our water purifier installed are of Eureka Forbes, hence all spare parts will be strictly of Eureka Forbes. (vi) The maintenance of Water purifier will be done by authorized employee of Eureka forbes / Eureka forbes dealer and Certificate of same to be furbished.

5

-

-

... More
CONTROL PANEL RO LCD

1

-

-

... More
Blower fan motor single phase 220/230 volts 1400 RPM

5

-

-

... More
Thermostat switch.

10

-

-

... More
Compressor Single phase including testing of nitrogen gas pressure and charging of gas R-22/R - 404A upto required pressure and proper working effect.

5

-

-

... More
PVC connection 15 mm dia size 450/600/750 mm long with brass union nuts on both ends. Make: Prayag/ Polymers Pvt Ltd/Polytuff

10

-

-

... More
Condensor fan Motor including fan blade (wherever necessary).

2

-

-

... More
Compressor unit suitable for deep freezer capacity 300/320 litre with complete testing by nitrogen pressure and charging of gas R-134A upto required pressure and proper working effect duly complete all as specified and directed.

2

-

-

... More
Taking down and Supply only of New Following spare parts mentioned in item no. suitable for water purification plant of 500 LPH capacity.

-

-

-

... More
New compressor of Appropriate Make Usha Sri Ram, Blue star, voltas for Water Cooler 40/60/80/120/150 ltr Storage capacity fixed in repair complete including testing of nitrogen gas pressure and charging of gas R-134A/R-22/ whatever required upto required pressure and proper working effect

10

-

-

... More
PVC drain pipe 2m long of size 25 to 40mm dia complete with 04 Nos hose clip.

10

-

-

... More
Wiring Kit as approved.

5

-

-

... More
PCB plate complete with connections suitable for any type of existing AC

5

-

-

... More
Compressor Single phase including testing of nitrogen gas pressure and charging of gas R-22/R - 404A upto required pressure and proper working effect.

2

-

-

... More
Timer suitable for frost free Refrigerators

5

-

-

... More
M&L For Preventive Maintenance (i.e Checking of Loose connection, Leakge of Body, Damage of any part of Desert Cooler and fan motor,Capacitor ,float valve,Water Pump and Overhauling of Desert cooler of any capacity/Make and replacemnt of damged /unsv parts of water cooler Installed at different Location of IMA Campus . Note : The spare part required for replacement shall be measured and paid separately under the relevent item of schedule "A"as supply only rate for fixing of new items/ (ii) Scrapping/painting/Welding/soldering/brazing/Fabrication work is included in this item (iii) The quoted rate deemed to inclusive of cost of Very small items required for repair such as front grills, nuts,bolts,washer , connecting wire of standard quality, PVC insulated and sheathed cable 3 core 1.5 sqmm stranded copper conductor, Woodwool pad (complete set), Capacitor 4 Mfd, fan blade, switch/controlling knob, water pipe, etc is included in this item. (iv) GE IMA comprises of 184 Desert Cooler at this point of time of make: Surecool/Summercon. Since at this point of time it is impossible to predict whether which item will be not working later, Hence the specific item required will be purely depending on the demand at later stage so the contractor should quote the rate keeping this point in mind. (v) The T&P required for repair and replacement of equipments will be provided by the Contractor.

90

-

-

... More
Stainless steel water tray.

10

-

-

... More
Membrane housing 300/150/100 GPD

150

-

-

... More
Fan motor for frost free Refrigerator

5

-

-

... More
Water purifier booster water pump 100/150/300 GPD

150

-

-

... More
Copper tubing with insulation of sizes 1/2"or1/4''or 3/8''or 5/8" (as per site requirement).

200

-

-

... More
Push/lifting type self closing tap of 15mm dia chromium plated.

10

-

-

... More
Starting relay box type

5

-

-

... More
PVC insulated and sheathed cable 3 core 4.0 sqmm stranded copper conductor Make:-Plaza/Havells/Polycab

100

-

-

... More
Electric condenser fan motor alongwith fan blade, 220 Volts, Single phase.

5

-

-

... More
M&L For Preventive Maintenance ( i.e Checking of Loose connection, Leakge of refrigerant gas ,Leakage of Compressor oil, Damage of any part of Refrigerator and fan motor,Capacitor ,Thermostate ,Relay Contactor,Condenser,float valve and servicing of Refrigerator of any capacity/Make and replacement of damaged /unsv parts of Refrigerator Installed at different Location of IMA Campus . Note : The spare part including Compressor oil if required for replacement shall be measured and paid separately under the relevent item of schedule "A". rate for fixing of new items/Filling of Compressor oil is deemed to be inclusive in quoted rate by the contractor for this item . . (ii) Charging of gas, if required, shall be measured and paid separately under appropriate item of Schedule `A'. However, vacuum and pressure leakage testing with nitrogen (N2) and repair of leakege portion of tubing by welding /brazzing is deemed to be included under the unit rate quoted by the contractor for this item (iii) The quoted rate deemed to inclusive of cost of Very small items required for repair such as nuts,bolts,washer , connecting wire of standard quality, PVC insulated and sheathed cable 3 core 2.5 sqmm stranded copper conductor, door light switch (push button type) with lamp holder (including lamp), Glass cover for vegitable tray, bi metallic switch, vegitable basket, etc is included in this item. (iv) GE IMA comprises of 20 Refrigerator at this point of time of make: LG, Samsung, Whirlpool of capacity 190/265/320 Ltrs. Since at this point of time it is impossible to predict whether which item will be not working later, Hence the specific item required will be purely depending on the demand at later stage so the contractor should quote the rate keeping this point in mind. (v) The T&P required for repair and replacement of equipments will be provided by the Contractor.

20

-

-

... More
Evaporating unit with all accessories.

2

-

-

... More
MCF REGLR CARTRIDGE 20 '' PP SPUN 5

6

-

-

... More
Gun metal globe/gate valve with iron wheel head, both ends screwed for iron pipe 15mm/20mm bore. Make:-Zoloto/Leader/Pryag

10

-

-

... More
M&L For Preventive Maintenance ( i.e Checking of Loose connection, Leakge of refrigerant gas ,Leakage of Compressor oil, Damage of any part of Deepfreezer and fan motor,Capacitor ,Thermostate ,Relay Contactor,Condenser,float valve and servicing of Deepfreezer of any capacity/Make and replacement of damaged /unsv parts of Deepfreezer Installed at different Location of IMA Campus . Note : The spare part including Compressor oil if required for replacement shall be measured and paid separately under the relevent item of schedule "A". rate for fixing of new items/Filling of Compressor oil is deemed to be inclusive in quoted rate by the contractor for this item . . (ii) Charging of gas, if required, shall be measured and paid separately under appropriate item of Schedule `A'. However, vacuum and pressure leakage testing with nitrogen (N2) and repair of leakege portion of tubing by welding /brazzing is deemed to be included under the unit rate quoted by the contractor for this item (iii) The quoted rate deemed to inclusive of cost of Very small items required for repair such as nuts,bolts,washer , connecting wire of standard quality, PVC insulated and sheathed cable 3 core 2.5 sqmm stranded copper conductor, door light switch (push button type) with lamp holder (including lamp), Glass cover for vegetable tray, bi metallic switch, etc is included in this item. (iv) GE IMA comprises of 7 Deepfreezer at this point of time of make: Voltas of capacity 320 Ltrs. Since at this point of time it is impossible to predict whether which item will be not working later, Hence the specific item required will be purely depending on the demand at later stage so the contractor should quote the rate keeping this point in mind. (v) The T&P required for repair and replacement of equipments will be provided by the Contractor.

7

-

-

... More
Dismantling and taking out unserviceable split AC outdoor unit and S&F in replacement split AC outdoor unit Suitable for existing Split type AC 1.5/2 TR capacity suitable for all weather conditions (HOT and COLD) with copper condenser coil and compresor complete including testing ofnitrogen gas pressure and charging of gas R-22/R-32 upto required pressure and proper working effect to the satisfaction complete all as specifed and directed.Make & capacity as per existing as approved.

4

-

-

... More
Refrigerant gas (Make Mafron R-134A) including leakage testing of complete plant/equipment with nitrozen gas and repairing leakage portion complete

2

-

-

... More
Condensor fan motor along with blade set.

2

-

-

... More
M & L for Dismantling and taking out unserviceable split AC indoor unit and S & F new split AC indoor unit suitable for existing Split type AC 1.5/2 TR capacity suitable for all weather conditions (HOT and COLD) with copper evaporator coil complete including testing of nitrogen gas pressure and charging of gas R-22/R-32 upto required pressure and proper working effect to the satisfaction. complete all as specifed and directed. Make & capacity as per existing.

4

-

-

... More
Auto cut Float valve (SENSOR TYPE)

150

-

-

... More
Sediment filter set / UF + MF filter suitable for existing water purifier / Copper Filter/ Carbon Filter/ Precarbon filter

600

-

-

... More
Compressor Three phase including testing of nitrogen gas pressure and charging of gas R-22/R - 404A upto required pressure and proper working effect.

5

-

-

... More
Reverse cycle valve for heating system including charging of refrigerant gas R-22/R-32 and leakage testing complete

5

-

-

... More
Water lifting submersible pump 1/7 HP 1400 RPM.

20

-

-

... More
Compressor Three phase including testing of nitrogen gas pressure and charging of gas R-22/R - 404A upto required pressure and proper working effect.

2

-

-

... More
UV balance set

150

-

-

... More
Blower fan motor

2

-

-

... More
Thermostat switch as approved.

5

-

-

... More
Single pole, 25 Amp contactor.

5

-

-

... More
Membrane 300/150 /100 GPD Model No. GWPMRO15000215 Make : Aquaguard

250

-

-

... More
Refrigerant Gas R-22 Mono chloro difluoro methane (CHCLF2)/R-122/R410/R-32 to make up the required pressure complete

10

-

-

... More
Over load protector

10

-

-

... More
Supply and Fixing of New Following spare parts mentioned in below items suitable for water purifier. Note : The spare part mentioned in item below required for replacement shall be measured and paid separately under the relevent item of schedule "A"as supply only rate for fixing of new items. (iii) The quoted rate deemed to inclusive of cost of Very small items required for repair such as nuts,bolts,washer , connecting wire of standard quality, PVC insulated and sheathed cable 3 core 1.5 sqmm stranded copper conductor, (push button), 6 Amp /16 Amp Plug Top (PVC/Metallic), Controlling Knob (Selector switch) , tube jointer, bulkhead, elbow, flexible pipe 1/4'' to 1'', Flow resistor etc is included in this item. (iv) GE IMA comprises of 200 Water purifier. Since at this point of time it is impossible to predict whether which item will be not working later, Hence the specific item required will be purely depending on the demand at later stage so the contractor should quote the rate keeping this point in mind. (v) The T&P required for repair and replacement of equipments will be provided by the Contractor. (vi) This is to bring attention of Contractor that All our water purifier installed are of Eureka Forbes, hence all spare parts will be strictly of Eureka Forbes. (vii) The maintenance of Water purifier will be done by authorized employee of Eureka forbes / Eureka forbes dealer and Certificate of same to be furbished.

-

-

-

... More
frost heater

5

-

-

... More
PVC flexible Pipe 25mm/40mm/50mm dia size over insulated copper tube 3/8” or 5/8”,with necessary packing tape 50mm wide for protection.

50

-

-

... More
Power supply (SMPS 2.5), 240 volts, 50 Hz Model No. GWPMRO25B10245 Make : Aquaguard or make as approved.

150

-

-

... More
Cut off panel of cooling system with senser and all accessories.

2

-

-

... More
Nylon/press jute filter

5

-

-

... More
Condenser coil including charging of refrigerant gas R-22/R - 404A and leakage testing.

2

-

-

... More
Antiscalant chemical( 5 Ltr Can)

6

-

-

... More
MCF ( MICRON FILTER ) REGULAR CARTRIDGE 10 ''

6

-

-

... More
Freezer unit with door assembly

5

-

-

... More
Mild steel angle iron wall/ floor stand factory made suitable for out door unit.

5

-

-

... More
Running capacitor 10/25 mfd . Make:- Havells / TIBCON /Epcos

10

-

-

... More
Condenser coil including testing of nitrogen gas pressure and charging of gas R-22/R-122/R-R410/R-32 upto required pressure and proper working effect.

5

-

-

... More
Refrigerant Gas (R-404A/R-22) to make up the required pressure.

2

-

-

... More
Running capacitor 36/45 mfd. Make:- Havells / TIBCON /Epcos

5

-

-

... More
Prefilter assembly 20 '' including filter GWPCMEGAF00875 Make: Aquaguard

100

-

-

... More
Single pole, 25 Amp contactor.

2

-

-

... More
Copper wound electric blower fan motor 1/5 HP 1400 RPM single shaft.

20

-

-

... More
Shifting and fixing split AC cap- 1.0/ 1.5 / 2.0 TR including cutting for hole on wall and making good of disturbed surface with matching existing finishes. Note:The transportation cost of AC from one place to another within the premises of IMA Campus is deemed to be included in the quoted rate.

30

-

-

... More
Solenoid Valve as approved.

150

-

-

... More
M&L For Preventive Maintenance ( i.e Checking of Loose connection, Leakage of water ,Filter Cartage, Damage of any part Water Purifier and Water Pump , relay ) and overhauling of Water Purifier of any capacity/Make and replacement of damged /unsv parts of Water Purifier. Note : The spare part mentioned in this item required for replacement shall be measured and paid separately under the relevent item of schedule "A"as supply only rate for fixing of new items. (iii) The quoted rate deemed to inclusive of cost of Very small items required for repair such as nuts,bolts,washer , connecting wire of standard quality, PVC insulated and sheathed cable 3 core 1.5 sqmm stranded copper conductor, (push button), 6 Amp /16 Amp Plug Top (PVC/Metallic), Controlling Knob (Selector switch) , tube jointer, bulkhead, elbow, flexible pipe 1/4'' to 1'', Flow resistor etc is included in this item. (iv) GE IMA comprises of 200 Water purifier. Since at this point of time it is impossible to predict whether which item will be not working later, Hence the specific item required will be purely depending on the demand at later stage so the contractor should quote the rate keeping this point in mind. (v) The T&P required for repair and replacement of equipments will be provided by the Contractor. (vi) This is to bring attention of Contractor that All our water purifier installed are of Eureka Forbes, hence all spare parts will be strictly of Eureka Forbes. (vii) The maintenance of Water purifier will be done by authorized employee of Eureka forbes / Eureka forbes dealer and Certificate of same to be furbished.

400

-

-

... More
Refrigerant gas (Make Mafron R-134A/R-22) including leakage testing of complete plant/equipment with nitrozen gas and repairing leakage portion complete

5

-

-

... More
Refrigerant gas (Make Mafron R-134A/R-600) including leakage testing of complete plant/equipment with nitrozen gas and repairing leakage portion complete as per Engr-in-Charge.

5

-

-

... More
Membrane RO LG BW 4040 ES

2

-

-

... More
M&L For Preventive Maintenance ( i.e Checking of Loose connection, Leakge of refrigerant gas ,Leakage of Compressor oil, Damage of any part of Window/Split AC and fan motor,Capacitor ,Thermostate ,Relay Contactor,Condenser,float valve and servicing of Window/Split AC of any capacity/Make and replacement of damaged /unsv parts of Window/Split AC Installed at different Location of IMA Campus . Note : The spare part mentioned in item no. required for replacement shall be measured and paid separately under the relevent item of schedule "A". rate for fixing of new items and Filling of Compressor oil is deemed to be inclusive in quoted rate by the contractor for this item . . (ii) Charging of gas, if required, shall be measured and paid separately under appropriate item of Schedule `A'. However, vacuum and pressure leakage testing with nitrogen (N2) and repair of leakege portion of tubing by welding /brazing is deemed to be included under the unit rate quoted by the contractor for this item (iii) The quoted rate deemed to inclusive of cost of Very small items required for repair such as nuts,bolts,washer , connecting wire of standard quality, PVC insulated and sheathed cable 3 core 2.5 sqmm stranded copper conductor, 6 Amp /16 Amp Plug Top (PVC/Metallic), Remote, etc is included in this item. (iv) GE IMA comprises of 100 SPLIT AC/ window AC at this point of time of make: Whirlpool,LG,Voltas,Lloyd,Carrier of capacity 1/1.5/2/3 TR . Since at this point of time it is impossible to predict whether which item will be not working later, Hence the specific item required will be purely depending on the demand at later stage so the contractor should quote the rate keeping this point in mind. (v) The T&P required for repair and replacement of equipments will be provided by the Contractor.

100

-

-

... More
Thermostat switch

5

-

-

... More
Three pole contactor as approved.

5

-

-

... More
Blower fan motor three phase 415 volts 1400 RPM.

5

-

-

... More
M&L For Preventive Maintenance (i.e Checking of Loose connection, Leakge of refrigerant gas ,Leakage of Compressor oil, Damage of any part of water cooler and fan motor,Capacitor ,Thermostat ,Relay Contactor,Condenser,float valve and servicing of water cooler of any capacity/Make and replacement of damaged /unsv parts of water cooler Installed at different Location of IMA Campus . Note : The spare part including Compressor oil if required for replacement shall be measured and paid separately under the relevent item of schedule "A". Rate for fixing of new items/ Filling of Compressor oil is deemed to be inclusive in quoted rate by the contractor for this item. (ii) Charging of gas, if required, shall be measured and paid separately under appropriate item of Schedule `A'. However, vacuum and pressure leakage testing with nitrogen (N2) and repair of leakege portion of tubing by welding /brazzing is deemed to be included under the unit rate quoted by the contractor for this item (iii) The quoted rate deemed to inclusive of cost of Very small items required for repair such as nuts,bolts,washer , connecting wire of standard quality, PVC insulated and sheathed cable 3 core 2.5 sqmm stranded copper conductor, etc. (iv) GE IMA comprises of 100 water cooler at this point of time of make: Voltas,Bluestar,Sriram Usha, Sidwal of storage capacity 40/60/80/120/150 Ltrs. Since at this point of time it is impossible to predict whether which item will be not working later, Hence specific item required will be purely depending on the demand at later stage so the contractor should quote the rate keeping this point in mind. (V) The T&P required for repair and replacement of equipments will be provided by the Contractor.

100

-

-

... More
Condensor coil with accessories including charging of refrigerant gas R-134A and leakage testing for proper working of compressor

5

-

-

... More
Compressor unit including testing by nitrogen gas pressure and charging of gas R-134A upto required pressure and proper working effect upto satisfaction of Engr-in-Charge.

5

-

-

... More
TDS controller of approved make.

20

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.