Irrigation Department Tender
Download documents of Uttarakhand Irrigation Department Tender
Irrigation Department Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date3 Apr 2025
Closing Date23 Apr 2025
Tender Amount₹ 1,50,78,000
Costs
EMD
₹ 3,02,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_IRDCE_82327_1Tender No
01/SE/2025-26Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://uktenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cement concrete grade M 10 in case of concrete block pitching PCC Grade M-10 (Nominal mix 1:3:6)
1178
-
-
... More
Brick masonry in cement mortar 1:4 in case of brick pitching
630
-
-
... More
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204
7392
-
-
... More
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
462
-
-
... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
277
-
-
... More
Maintenance of Earhen shoulder (stripping of excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903
832
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements