Irrigation Department Tender
View complete overview of Uttarakhand Irrigation Department Tender
Irrigation Department Tender
Civil And Construction
Excavation
Eprocure
Opening Date28 Jul 2022
Closing Date16 Aug 2022
Tender Amount₹ 1,16,50,358 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 2,70,000Document Cost
₹ 4,720Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_IRDCE_47319_1Bid Award Id
ViewTender No
03/SE/2022-23Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://https://www.uttarakhandirrigation.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
R C R stone masonry work in laid in (1:4)cement and sand mortar for substructure including supply as per drawing & technical specification Clauses .
540
-
-
... More
C.C. 1:2:4 grouting cement sand and 20 mm stone ballast i/c all cost.
80
-
-
... More
Pointing 1:3 c/s mortar on outer sides of minor parapets as per drawing and technical specification Clause.
2460
-
-
... More
Dismantling of stone masonary existing structures like culverts , bridges,retaining walls,and other structure comprising of stone masonry ,including disposal of unserviceable materials and stacking the serviceable materials with all lift and lead.
355
-
-
... More
Dismantling of existing structures like culverts , bridges,retaining walls,and other structure comprising of stone masonry ,including disposal of unserviceable materials and stacking the serviceable materials with all lift and lead. Technical specification Clauses , Reinforcement Cement Concrete.
15
-
-
... More
R.R Stone masonry (1:5) in cement sand mortar including supply as per drawing & technical specification Clauses.
60
-
-
... More
providing and laying Non pressure NP3 class (medium duty) R.C.C.pipes including collars/spigot with stiff mixture of cement mortar in the proportion of 1:2 (1-cement :2-fine sand)including testing of joints etc.complete 450 mm dia R.C.C pipes(Laying by manual/machanical means)
8
-
-
... More
providing and laying Non pressure NP3 class (medium duty) R.C.C.pipes including collars/spigot with stiff mixture of cement mortar in the proportion of 1:2 (1-cement :2-fine sand)including testing of joints etc.complete 600 mm dia R.C.C pipes(Laying by manual/machanical means)
6
-
-
... More
providing and laying Non pressure NP3 class (medium duty) R.C.C.pipes including collars/spigot with stiff mixture of cement mortar in the proportion of 1:2 (1-cement :2-fine sand)including testing of joints etc.complete 1000 mm dia R.C.C pipes(Laying by manual/machanical means)
8
-
-
... More
Plain/reinforced cement concrete in substructure complete as per drawing and technical specification Clauses .R.C.C grade M-20 .
3
-
-
... More
Supplying, fitting and placing with MS bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses . (The reinforcement steel shall be as per clause of MORD specifications (First
0.6
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements