Irrigation Department Tender
View complete overview of Uttarakhand Irrigation Department Tender
Irrigation Department Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date1 Jan 2024
Closing DateCancelled
Tender Amount₹ 41,75,57,600
Costs
EMD
₹ 74,30,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_IRDCE_67057_1Bid Award Id
ViewTender No
05/SE/2023-24 DATED 30-12-2023Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://https://www.uttarakhandirrigation.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Excavation for Road way in Hard Rock by mechanical means (controlled blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal upto 1000 metres with all lifts including cost of all materials, labours T&P including dewatering etc. required for proper completion of the work.
600
-
-
... More
Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:3:6 in foundations and floors including supply of all material, labour and T&P including dewatering etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203
1800
-
-
... More
Reinforced cement concrete in sub structure complete as per drawing and technical specifications RCC Grade M20 Height upto 5m With Batching Plant, Transit Mixer and Concrete Pump, including supply of all materials, labour and T&P including dewatering etc. required for proper completion of the work.
841.5
-
-
... More
Reinforced cement concrete in sub structure complete as per drawing and technical specifications RCC Grade M25 Height upto 5m With Batching Plant, Transit Mixer and Concrete Pump, including supply of all materials, labour and T&P including dewatering etc. required for proper completion of the work.
4806
-
-
... More
Plain cement concrete in sub structure complete as per drawing and technical specifications PCC Grade M20 Height upto 5m With Batching Plant, Transit Mixer and Concrete Pump. including supply of all material, labour and T&P including dewatering etc. required for proper completion of the work
3532.5
-
-
... More
Furnishing and Placing Reinforced cement concrete in super-structure as per drawing and Technical Specification RCC Grade M25 Using Batching Plant, Transit Mixer and Concrete Pump, For solid slab super-structure, Height upto 5m. including supply of all material, labour and T&P including dewatering etc. required for proper completion of the work.
1174.9
-
-
... More
Furnishing and Placing Reinforced cement concrete in super-structure as per drawing and Technical Specification RCC Grade M25 Using Batching Plant, Transit Mixer and Concrete Pump, For solid slab super-structure, Height upto 5m to 10m. including supply of all material, labour and T&P etc. required for proper completion of the work.
862.43
-
-
... More
Supplying, fitting and placing HYSD bar Fe-500/500D reinforcement in foundation complete as per drawing and technical specifications. including supply of all material, labour and T&P etc. required for proper completion of the work.
603.26
-
-
... More
Providing and laying of 60 LB rail Section for Sloping Floor including supply of all material, labour and T&P etc. required for proper completion of the work, as per directed by site Engineer-In-charge but excluding the cost of rails.
107
-
-
... More
Transportating of 60 LB rail from Rishikesh Irrigation Store to Satpuli Barrage site including all cost of materials, machinery, labour, lead, lift, Loading and unloading for proper completion of the works.
107
-
-
... More
Construction of Embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5. including supply of all material, labour and T&P etc. required for proper completion of the work.
14400
-
-
... More
Construction of U/S & D/S Protection work of Barrage
-
-
-
... More
Earth work in excavation of foundation of structures by mechanical means as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. disposal upto 1000 metres. including all cost of materials and labour T&P including dewatering etc. required for proper completion of the work
7875
-
-
... More
Excavation in Hard Rock by mechanical means (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. including cost of all materials, labours T&P including dewatering etc. for proper completion of the work.
4000
-
-
... More
Excavation for Road way in Hard Rock by mechanical means (controlled blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal upto 1000 metres with all lifts including cost of all materials, labours T&P including dewatering etc. required for proper completion of the work.
2400
-
-
... More
Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:3:6 in foundations and floors including supply of all material, labour and T&P including dewatering etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203
1460
-
-
... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8. including supply of all material, labour and T&P etc. required for proper completion of the work.
540
-
-
... More
Stone masonry work in 1:3 cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. including supply of all material, labour and T&P including dewatering etc. required for proper completion of the work
428.4
-
-
... More
Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions of galvanized steel, of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 3 mm for gabions, edge/selvedge wire diameter 3.9 mm and lacing wire diameter 2.2 mm. (The work includes filling boulders in the gabions). including supply of all materials, labour and T&P etc. required for proper completion of the work.
1406
-
-
... More
Hand Packed stone filling in back of wallls including cost of all materials, labour, T&P etc. complete as per direction of Engineer-in- charge required for proper completion of the work.
108
-
-
... More
Construction of Embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5. including supply of all material, labour and T&P etc. required for proper completion of the work.
7200
-
-
... More
Counterfort Retainig Wing Wall
-
-
-
... More
Earth work in excavation of foundation of structures by mechanical means as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. disposal upto 1000 metres. including all cost of materials and labour T&P including dewatering etc. required for proper completion of the work
1200
-
-
... More
Excavation in Hard Rock by mechanical means (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. including cost of all materials, labours T&P including dewatering etc. for proper completion of the work.
967
-
-
... More
Excavation for Road way in Hard Rock by mechanical means (controlled blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal upto 1000 metres with all lifts including cost of all materials, labours T&P including dewatering etc. required for proper completion of the work.
480
-
-
... More
Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:3:6 in foundations and floors including supply of all material, labour and T&P including dewatering etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203including supply of all materials, labour and T&P etc. required for proper completion of the work
51
-
-
... More
Reinforced cement concrete in sub structure complete as per drawing and technical specifications RCC Grade M25 Height upto 5m With Batching Plant, Transit Mixer and Concrete Pump. including supply of all materials, labour and T&P including dewatering etc. required for proper completion of the work
426.2
-
-
... More
Furnishing and Placing of Reinforced cement concrete in super-structure as per drawing and Technical Specification RCC Grade M25 Using Batching Plant, Transit Mixer and Concrete Pump, For solid slab super-structure, Height upto 5m .including supply of all materials, labour and T&P including dewatering etc. required for proper completion of the work
342
-
-
... More
Furnishing and Placing Reinforced cement concrete in super-structure as per drawing and Technical Specification RCC Grade M25 Using Batching Plant, Transit Mixer and Concrete Pump, For solid slab super-structure, Height upto 5m to 10m. including supply of all materials, labour and T&P etc. required for proper completion of the work.
196.8
-
-
... More
Supplying, fitting and placing HYSD bar Fe-500/500D reinforcement in foundation complete as per drawing and technical specifications. including supply of all material, labour and T&P etc. required for proper completion of the work.
75.75
-
-
... More
Construction of Embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5. including supply of all material, labour and T&P etc. required for proper completion of the work.
12000
-
-
... More
Hand Packed stone filling in back of wallls including cost of all materials, labour, T&P etc. complete as per direction of Engineer-in- charge required for proper completion of the work.
3780
-
-
... More
Deck Slab on the top of Piers of Barrage
-
-
-
... More
Furnishing and Placing Reinforced cement concrete in super-structure as per drawing and Technical Specification RCC Grade M25 Using Batching Plant, Transit Mixer and Concrete Pump, For solid slab super-structure, Height upto 5m to 10m including supply of all materials, labour and T&P etc. required for proper completion of the work.
336
-
-
... More
Supplying, fitting and placing HYSD 500/500D bar reinforcement in foundation complete as per drawing and technical specifications. including supply of all materials, labour and T&P etc. required for proper completion of the work.
26.38
-
-
... More
Tubular Steel Railing on Precast RCC posts, 1.2 m high above Ground Level Providing, fencing and erecting 50 mm dia painted steel pipe railing in 3 rows on precast M-20 grade RCC vertical posts 175 mm x 175 mm x 1.8 m high (1.2 m above GL) with 3 holes 50 mm dia for pipe, fixed 2 m centre-to- centre complete as per approved drawings Clause 1706. including supply of all materials, labour and T&P etc. required for proper completion of the work.
180
-
-
... More
Approach Road
-
-
-
... More
Excavation in Ordinary Rock by mechanical means using Hydraulic ExcavatorCK-90 and Tippers with disposal upto 1000 metres. with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections, including supply of all materials, labour and T&P etc. required for proper completion of the work
14076
-
-
... More
Excavation in Hard Rock by mechanical means (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. including supply of all materials, labour and T&P etc. required for proper completion of the work
225
-
-
... More
Excavation in Hard Rock by mechanical means (controlled blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres) including supply of all materials, labour and T&P etc. required for proper completion of the work
56.25
-
-
... More
Plain cement concrete in substructure complete as per drawings and technical specification C.C. 1:2:4 including supply of all materials, labour and T&P etc. required for proper completion of the work.
947.1
-
-
... More
Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3 including supply of all materials, labour and T&P etc. required for proper completion of the work.
729
-
-
... More
Stone masonary in 1:5 cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204. including supply of all materials, labour and T&P etc. required for proper completion of the work.
751.5
-
-
... More
Tubular Steel Railing on Precast RCC posts, 1.2 m high above Ground Level Providing, fencing and erecting 50 mm dia painted steel pipe railing in 3 rows on precast M-20 grade RCC vertical posts 175 mm x 175 mm x 1.8 m high (1.2 m above GL) with 3 holes 50 mm dia for pipe, fixed 2 m centre-to- centre complete as per approved drawings Clause 1706. including supply of all materials, labour and T&P etc. required for proper completion of the work.
810
-
-
... More
Hydro Mechanical Work
-
-
-
... More
Manufacturing/Fabrication of Vertical Gates for Satpuli Barrage Size of 7 Nos 10.00x4.00m, in each gates including Anchor bolts and Guides,Gate leaf assembly its wheel assembly rubber seals, Stanchion complete, and Super structure, Electric and manual operated Hoist mechanism, supporting structure like staircase hand railing etc . Manufacturing/Fabrication, of Vertical Stoplog Gates and its Track with Gantry Crane for Satpuli Barrage , in each gates including Anchor bolts and Guides, Stoplog tiers its Rubber seals, Hoist/Gantry crane for Gates tiers, Hoist Bridge/Superstructure with Rail lines for Gantry crane, Erection of Vertical Gates, Stoplog Gates, Hoist Structure, Gantry Crane for Stoplog Gates complete with Embedment Parts, First stage Embedment parts of vertical and stoplog gate groove such as anchor bolts (J & U Types) with welding, proper alignment etc, Second stage Embedment parts of vertical and stoplog gate groove such as roller guide, sill seat track guide with proper aligment , vertical Gate with roller, guide shoes, rubber seal with clamp plate in their respected grooves with epoxy painting including all cost of heavy crane, complete hoist mechanism of vertical gates including stanchions super structure electric and manual hoist mechanism with proper alignment and painting , staircase along with hand railing and other supporting/ safety structure , stop log gates ties gates with roller, guide shoes, rubber seal with clamp plate with epoxy painting including all cost of heavy crane, hoist machanism/ Gantry crane for stoplog gate , hoist Bridge/ Superstructure with rail track for movement and operating of Gantry crane, Complete wiring with cable tray, control panels, switch gears, bus bar, T.P switch, changeover switch ,limit switches, circuit breaker for operation of Barrage gates with labour and T&P charges, including all materials, machinery, labour, T&P, Consumbles and transportation to complete the job ,cuting, aligning, welding, finishing, cleaning by sand blasting, applying one coat of zinc rich epoxy primer and three coats of cold applied coal tar epoxy paint, seal fixing, complete as per specifications and drawings with all leads and lifts including packing/forwarding charges for other materials.
1
-
-