Irrigation Department Tender
View complete overview of Uttarakhand Irrigation Department Tender
Irrigation Department Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date15 Jul 2024
Closing Date20 Jul 2024
Tender Amount₹ 18,87,000
Costs
EMD
₹ 38,000Document Cost
₹ 354Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPIDC_938408_1Bid Award Id
ViewTender No
E-Tender Notice No03/EE/2024-25Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://http://idup.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing & Laying C.C. 1:4:8 in foundation with cement, coarse sand, stone ballast size 20-40 mm i/c all cost of material labour, T&P etc for proper completion of work as per directed Engineer-in-charge.
17.7
-
-
Providing & Laying C.C. 1:2:4 in foundation with cement, coarse sand, stone grit size 12-20 mm i/c all cost of material labour, T&P etc for proper completion of work as per directed Engineer-in-charge.
100.26
-
-
Earth work in embankment by power transported earth with a lead upto 1.00 Km. including excavation, loading, unloading, manual compaction, dressing and all lifts complete including cost of all material, labour and T&P etc. All complete as per directed Engineer-in-charge.
451.93
-
-
Providing and Laying graded filter in layers including cost of all material, labour and T&P etc. complete work as per directed Engineer-in-charge.
63.45
-
-
Supplying and laying Dry stone pitching hand packed & also including all cost of material, labour & T&P etc. complete of all work as directed by Engineer in charge.
97.29
-
-
Earth work in silt clearance including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour or machines. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge.
1617.44
-
-