Opening Date7 May 2018
Closing Date25 May 2018
Tender Amount₹ 5,00,000 
Notes
Download

Costs

Summary

Service for designing, packaging of cosmetic and Perfume

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Random Rubble stone masonry for structure laid 1:6 by locally available approved stone, including supply of all materials, labour, T&P etc required for proper completion of work as per drawing & as per MORD specification for retaining walls, breast walls & other similar structures as directed by Engineer-in-Charge.Including cost of all material,labour T&P et.SOR NO.1-4(MISC)

2439

-

-

... More
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications).Including cost of all material,labour T&P et.SOR NO.1-5(MISC)

900

-

-

... More
Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions (Zinc plus PVC coated), of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120 mm, mesh wire diameter 2.7mm/3.7mm, edge/selvedge wire diameter 3.4/4.4 mm and lacing wire diameter 2.2/3.2 mm. (The work includes filling boulders in the gabions).Including cost of all material,labour T&P et. SOR NO.1-8(MISC)

80

-

-

... More
Construction of Hill side Kuccha drain in accordance with the requirement of specification true to line and grades. Dimensions and other particulars as per drawing including all material labour T&P. etc. required for proper completion of the work as directed by Engineer in charge.Including cost of all material,labour T&P et.SOR NO.3-19-1-B(MORD)

9844

-

-

... More
Providing, laying, spreading & compaction of stone aggregates of specific sizes to WBM specifications including spreading in uniform thickness, hand packing, rolling with power roller 8-10 tonn in stages to proper grade & camber, applying & brooming requisite type of binding material to fill up the intristices of coarse aggregates,watering & rolling, making necessary earthen bund to protect edges lighting, guarding & barricadings, & maintenance of diversions etc.[Grading of no-1] (45-90 mm size).Including cost of all material,labour T&P et.SOR NO.4-7-1-B(MORD)

891

-

-

... More
Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203.Including cost of all material,labour T&P et.SOR NO.2-2(MISC)

289.85

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First revision'2014) and IS 1786:2008 clause no. 1.6) (For Scupper).Including cost of all material,labour T&P et.SOR NO.12-6(MISC)

17.3

-

-

... More
Providing and laying reinforced cement concrete in superstructure for Scupper as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 R.C.C M 30.Including cost of all material,labour T&P et.SOR NO.13-1-3-A(MORD)

185

-

-

... More
Providing and laying reinforced cement concrete in superstructure for Scupper as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 R.C.C grade M 20.Including cost of all material,labour T&P et.SOR NO.13-1-1-2-A(MORD).

15.76

-

-

... More
Courced Rubble Stone masonry in cement mortar 1:4 for cause way. Including cost of all material,labour T&P et.SOR NO.11-6-1-2(MORD)

28.8

-

-

... More
Cement plum masonry with 40% plum & 60% 1:3:6 cement concrete including cu.m supply of all material, labour, T&P etc. required for proper completion of the work.(As per PWD Uttarakhand specifications).Including cost of all material,labour T&P et.SOR NO.2-1(MISC)

33.75

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete for Cause way as per drawing and technical specifications M30 Using concrete Mixer.Including cost of all material,labour T&P et.SOR NO.13-5-G-P-1(MORTH)

13

-

-

... More
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Up to 3.00mtr.Including cost of all material,labour T&P et. SOR NO.12-1-1-A-1(MORD)

532

-

-

... More
Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. 3.00mtr to 6.00mtr.Including cost of all material,labour T&P et.SOR NO.12-1-1-A-2(MORD)

118

-

-

... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Including cost of all material,labour T&P et. SOR NO.12-4(MISC)

20

-

-

... More
Reinforced Cement Concrete in Open Foundation complete for Culvert as per Drawing and Technical Specifications RCC Grade M 25 Using Concrete Mixer.Including cost of all material,labour T&P et. SOR NO.12-8-E-1(MORD)

154

-

-

... More
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. (The reinforcement steel shall be as per clause no. 1009.3.1 of MORTH specifications (Fifth Revision'2013) and IS 1786:2008 clause no. 1.6) (For Bridge)Including cost of all material,labour T&P et. SOR NO.12-40(MORD)

19

-

-

... More
Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications. RCC Grade M 25 Using Concrete Mixer Hight 5 to 10 m.Including cost of all material,labour T&P et.SOR NO.13-5-F-Q-1(MORD)

238

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications . (The reinforcement steel shall be as per clause no. 1009.3.1 of MORTH specifications (Fifth Revision'2013) and IS 1786:2008 clause no. 1.6) (For Bridge)Including cost of all material,labour T&P et.SOR NO.13-6(MORD)

29

-

-

... More
Furnishing and Placing Reinforced cement concrete in super-structure as per drawing and Technical Specification RCC Grade M 30 Using Concrete Mixer For solid slab super-structure.Including cost of all material,labour T&P et. SOR NO.14-1-B-1-2-Q(MORD)

89

-

-

... More
Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications . The reinforcement steel shall be as per clause no. 1009.31 of MORTH specification ( Fifth revision 2013 ) and IS 1786.2008 clause no. 1.6) (For Bridge).Including cost of all material,labour T&P et.SOR NO.14-2(MORD)

14

-

-

... More
Supplying, fixing in position Neopin Pad BearingIncluding allmapetials T & P etc. complete as per drawing and approved Technical Specifications.Including cost of all material,labour T&P et.As per Market Rate

46800

-

-

... More
Reinforced Cement Concrete Crash Barrier Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-20 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/ 1/94-DO III dated 24 June 1994 as per dimensions in the \ approved drawing and at locations directed by the Engineer, all as specified.Including cost of all material,labour T&P et.SOR NO.8-22-1(MORD)

88

-

-

... More
Drainage Spouts complete as per drawing and Technical specification.Including cost of all material,labour T&P et.SOR NO.14-9(MORD)

14

-

-

... More
Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.Including cost of all material,labour T&P et.SOR NO.14-22(MORD)

33

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications.Including cost of all material,labour T&P et.SOR NO.14-4(MORD)

10

-

-

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification.Including cost of all material,labour T&P et.SOR NO.14-10(MORD)

11

-

-

... More
Reinforced cement concrete M 30 Grade approach slab including reinforcement and formwork complete as per drawing and Technical specification.Including cost of all material,labour T&P et.SOR NO.14-11(MORD)

34

-

-

... More
Dewatering from foundation of abutments and wing walls including wages of hours operator and fuel including supply of all material, labour and T&P etc. required for proper completion of the work.Including cost of all material,labour T&P et.SOR NO.4-6(MISC)

320

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.