Central Building Research Institute Tender
View complete overview of Uttarakhand CBRI Tender
Central Building Research Institute - CBRI Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date8 Mar 2024
Closing Date21 Mar 2024
Tender AmountRefer Documents
Costs
EMD
₹ 2,000Document Cost
₹ 177Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CSIR_190556_1Tender No
193(644)EST/2024-25Tender Authority
Central Building Research Institute ViewPurchaser Address
-Website
http://https://www.csir.res.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
5
-
-
... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand)
3
-
-
... More
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
1
-
-
... More
Supplying and filling the Gap between Beams and Walls with GP2 (cementious grout)including Labour, material etc complete in all respect at site as per direction of engineer In-charge.
100
-
-
... More
Scaffolding for fixing RCC Beams under the existing RCC roof and Dismantling Brick wall below the roof including material (MS channel, Steel props), Labour, T&P etc by using all safety measures complete in all respect at site as per direction of engineer In-charge.
1
-
-
... More
Providing Unskilled manpower for shifting of various items, furneture,old testing models and materials from construction site to specified space in the institute as per direction of Engineer-in-charge
2
-
-
... More
Providing skilled manpower for shifting of various items, furneture,old testing models and materials from construction site to specified space in the institute as per direction of Engineer-in-charge
2
-
-
... More
Providing Tractor trolly for Carriage of old testing models, watse materials, brick bats, testing materials, debredge, broken bats, Broken concrete blocks and old concrete pieces etc. from intitute to out side of Nagar Nigum Roorkee includng loading unloding all complete works at site as per direction of Engineer-in-charge.
2
-
-
... More
Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge.With cement mortar 1:4 (1 cement : 4 fine sand)
30
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements