Central Building Research Institute Tender
View complete overview of Uttarakhand CBRI Tender
Central Building Research Institute - CBRI Tender
Civil And Construction
Building Construction
Eprocure
Opening Date5 Apr 2023
Closing Date17 Apr 2023
Tender Amount₹ 2,20,050 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 4,500Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_CSIR_151059_1Bid Award Id
ViewTender No
193(618)EST/2023-24Tender Authority
Central Building Research Institute ViewPurchaser Address
-Website
http://https://www.csir.res.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing Tractor trolly for shifting of malba, debrise, soil, various old testing models and materials from construction site to outside of institute and out site area of nagar nigum Roorkee including loading unloading complete work in all respect as per direction of Engineer-in-charge.
4
-
-
Earth Work in excavation by mechanical / manual means in foundation trenches or drains ( not exceeding 1.5 m in width or 10 sqm. on plan) including dressing sides and ramming of bottoms, lift up to 1.5 including getting out the excavated soil as directed.All kinds of soils
12
-
-
Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layer not exceeding 20Cm. in depth , consolidating each deposited layer by ramming and watering, lead up to 50m and lift up to 1, 5m.
5
-
-
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
2
-
-
Reinforced cement concrete work in beams suspended floors roofs having slope up to 15 landings balconies, shelves, chajjas, lintels, bands, plain window sills, stair cases up to floor five level excluding cost of centering, shuttering, finishing and Reinforcement.(1 cement :1.50 coarse sand :3 graded stone aggregate 20mm nominal size)
8
-
-
Centering shuttering i/c strutting, propping etc. and removal of from for : Foundations and footings
13
-
-
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
604
-
-
Providing and fixing bolts (High Tensile Strength) including nuts and washers complete.
66
-
-
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars
276
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements