Central Building Research Institute Tender
View complete overview of Uttarakhand CBRI Tender
Central Building Research Institute - CBRI Tender
Civil And Construction
Eprocure
Opening Date27 Nov 2020
Closing Date4 Dec 2020
Tender Amount₹ 1,04,337 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 2,100Document Cost
₹ 590Tender Fee
Refer Documents
Summary
Provision Of Rcc Foundation And Structure For Gps Antena Seismic Observatory At Csir Cbri
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_CSIR_63216_1Bid Award Id
ViewTender No
193(559) EST/2020-21Tender Authority
Central Building Research Institute ViewPurchaser Address
-Website
http://https://www.csir.res.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
2
-
-
... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
1.5
-
-
... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).
0.1
-
-
... More
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level.Cold twisted bars
424
-
-
... More
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
7
-
-
... More
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
9
-
-
... More
Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand (zone - III) : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size,well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth.
3
-
-
... More
6 mm cement plaster of mix :1:3 (1 cement : 3 fine sand)
11
-
-
... More
12mm thick cement plaster in mix 1:4(1 Cement : 4 Fine sand)
5
-
-
... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand)
1
-
-
... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
9
-
-
... More
Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces
0.5
-
-
... More
Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
15
-
-
... More
Supplying and fixing of Stainless steel circular rod of 40mm dia and 1.20m length with threading on one side of the rod as per direction of Engineer in charge.
1
-
-
... More
Writing the matter of GPS Antena on the column with synthetic enamel paint as per direction of Engineer in charge.
1
-
-
Evaluation Notes How It Works ?
Potential Partner