Bhartiya Cooperative Gramin Vikas Evam Nirman Limited Tender
View complete overview of Uttarakhand Bhartiya Cooperative Gramin Vikas Evam Nirman Limited Tender
Bhartiya Cooperative Gramin Vikas Evam Nirman Limited Tender
Civil And Construction
Building Construction
Eprocure
Opening Date22 Jun 2024
Closing Date2 Jul 2024
Tender Amount₹ 47,29,606.33 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 95,000Document Cost
₹ 3,776Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_BCGN1_72573_1Bid Award Id
ViewTender No
93/BCGVENL/tender/2024-25Tender Authority
Bhartiya Cooperative Gramin Vikas Evam Nirman Limited ViewPurchaser Address
-Website
http://uktenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.“(Note :- Cement content considered in this item is @ 330 kg/cum.“Excess/ less cement used as per design mix is payable/recoverable separately).
-
-
-
... More
Kids play ground 9 in 1
-
-
-
... More
GYM EQUIPMENTS- Ground Floor
-
-
-
... More
Supplying & Installation Solar Light area as per approved design as per direction engineer in charge
3
526500
175500
... More
EARTH WORK
-
-
-
... More
Open air cross fit gym equipment
-
-
-
... More
Supplying & Installation of bench
6
108000
18000
... More
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
55.3
14393
260.3
... More
Supplying & Installation of Three Wheel Shoulder
4
29120
7280
... More
Supplying & Installation of cross fit gym equipment
1
1639000
1639000
... More
All works upto plinth level
7.39
70240
9504.75
... More
Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift.
55.74
39045
700.5
... More
Supplying & Installation of kids play ground station
1
1907000
1907000
... More
FILLING IN FOUNDATION
-
-
-
... More
DUSTBIN
-
-
-
... More
SOLAR LIGHT
-
-
-
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
38.71
7587
196
... More
FLOOR FILLING
-
-
-
... More
steel reinforcement for rccc work including straightening, cutting, bending placing in position and binding all complete upto plinth level thermo-mechnically treated bars
580.27
62582
107.85
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements