Bharat Sanchar Nigam Limited Tender
View complete overview of Uttarakhand BSNL Tender
Bharat Sanchar Nigam Limited - BSNL Tender
Civil And Construction
Civil Works Others
Building Construction
Eprocure
Opening Date23 Aug 2024
Closing Date29 Aug 2024
Tender Amount₹ 2,87,131
Costs
EMD
₹ 5,743Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_BSNL_205914_1Bid Award Id
ViewTender No
32/EE(C)/BSNL/CD/DDN/2024-25Tender Authority
Bharat Sanchar Nigam Limited ViewPurchaser Address
-Website
http://https://www.bsnl.co.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc..
7.5
-
-
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
-
-
-
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
0.7
-
-
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
-
-
-
Thermo-Mechanically Treated bars of grade Fe-500D or more.
50
-
-
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:
-
-
-
Cement mortar 1:6 (1 cement : 6 coarse sand)
5
-
-
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :
-
-
-
Cement mortar 1:6 (1 cement : 6 coarse sand)
11
-
-
Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. (i)Single socketed pipes.
-
-
-
110 mm diameter
5
-
-
12 mm cement plaster of mix :
-
-
-
1:6 (1 cement: 6 coarse sand)
70
-
-
15 mm cement plaster on rough side of single or half brick wall of mix :
-
-
-
1:6 (1 cement: 6 coarse sand)
40
-
-
Finishing walls with Acrylic Smooth exterior paint of required shade :
-
-
-
New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm)
110
-
-
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :
-
-
-
One or more coats on old work.
18
-
-
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
-
-
-
Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
0.03
-
-
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge..
-
-
-
In cement mortar
1.5
-
-
Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured):
-
-
-
From brick work in cement mortar
400
-
-
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
15
-
-
Credit for serveciable items to be used in the work
-
-
-
Serveciable F.P.S Bricks
400
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements