Bharat Heavy Electricals Limited Tender
View complete overview of Uttarakhand BHEL Tender
Bharat Heavy Electricals Limited - BHEL Tender
Building Construction
Civil And Architectural Services
Eprocure
Opening Date23 Jan 2025
Closing Soon14 Feb 2025
Tender Amount₹ 11,60,38,650
Costs
EMD
₹ 20,00,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Design, Fabrication, Supply And Erection / Commissioning Of Pre-engineered Building (peb) Structure, Replacement Of Old Fabrication And Assembly Roof Sheds
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_BHEL_44280_1Tender No
BHEL/HEEP/WEX/202403191 Dt.23.01.2025Tender Authority
Bharat Heavy Electricals Limited ViewPurchaser Address
-Website
http://eprocurebhel.co.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.:In stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required, all complete Unit: kg ( S.l.No. : 10.25.1 ) Page No.: 179
14000
67
940800
... More
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.:In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works Unit: kg ( S.l.No. : 10.25.2) Page No.: 179
5000
77
389500
... More
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. :On steel work Unit:Sqm ( S.l.No. : 13.52.1) Page No.: 226
436
105
45998
... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : :Two or more coats on new work. Unit:Sqm ( S.l.No. : 13.61.1) Page No.: 227
436
53
23478.6
... More
Painting with aluminium paint of approved brand and manufacture to give an even shade . :Two or more coats on new work Unit:Sqm ( S.l.No. : 13.63.1) Page No.: 227
2805
47
133798.5
... More
Refixing old glass panes with putty and nails Unit:Sqm ( S.l.No. : 14.1) Page No.: 238
2405
224
539802.25
... More
Taking out wind ties from roof including cutting out rusted bolts, nuts etc. and removing materials to any distance within compound and stacking. Unit:Kg ( S.l.No. : 14.19) Page No.: 239
8545
1
12390.25
... More
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50metres lead. Unit:Kg ( S.l.No. : 15.18) Page No.: 249
50000
1
77500
... More
Extra for dismantling trusses, rafters, purlins etc. of steel work for every additional span of one metre or part thereof beyond 10 metres Unit:units ( S.l.No. : 15.20) Page No.: 250
700000
-
175000
... More
Extra for dismantling trusses, rafters, purlins etc. of steel work for every additional height of one metre or part thereof beyond 5 metres. Unit:units ( S.l.No. : 15.21) Page No.: 250
750000
-
187500
... More
Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: :G.S. Sheet Unit:Sqm ( S.l.No. : 15.28.1) Page No.: 250
1067
45
48761.9
... More
Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: :Asbestos sheet Unit:Sqm ( S.l.No. : 15.28.2) Page No.: 250
10696
21
231033.6
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%