Bharat Heavy Electricals Limited Tender
View complete overview of Uttarakhand BHEL Tender
Bharat Heavy Electricals Limited - BHEL Tender
Automobiles and Auto Parts
Eprocure
Opening Date28 May 2022
Closing Date7 Jun 2022
Tender Amount₹ 2,08,886 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 4,220Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_BHEL_13067_1Bid Award Id
ViewTender No
BHEL/HEEP/WCS/6200/20220038 DTD. 21.05.2022Tender Authority
Bharat Heavy Electricals Limited ViewPurchaser Address
-Website
http://eprocurebhel.co.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
"REPAIR OF 65/ 75 H.P. SEWERAGE PUMPS. SUPPLY & REPLACEMENT OF STUD FOR PUMP BODY (EACH STUD RATE)."
15
-
71.69
... More
"REPAIR OF 65/ 75 H.P. SEWERAGE PUMPS.
SUPPLY AND REPLACEMENT OF EACH GUN METAL BUSH."
6
-
955.8
... More
"REPAIR OF 65/ 75 H.P. SEWERAGE PUMPS. REPAIR OF FLEXIBLE PROPELLER SHAFT INCLUDING ALL MATERIAL REQUIRED FOR PROPER REPAIR
6
-
860.22
... More
"REPAIR OF 65/ 75 H.P. SEWERAGE PUMPS. UNIVERSAL COUPLING WITH CROSS BEARING TO BE SUPPLIED & REPLACED."
6
-
1433.7
... More
"GROUND RESERVOIR 35HP TO 50HP PUMPS : REPAIR OF 35HP TO 50HP VERTICAL TURBINE PUMPS REPAIR OF COLUMN ASSEMBLY SHAFT WITH WELDING, STRAIGHTENING, THREADING & REPLACEMENT OF ASSEMBLY SHAFT SOCKET 12"" SIZE. "
6
-
1433.7
... More
"GROUND RESERVOIR 35HP TO 50HP PUMPS : REPAIR OF 35HP TO 50HP VERTICAL TURBINE PUMPS SUPPLY & REPLACEMENT OF EACH STUD INCLUDING FIXING."
15
-
71.69
... More
50/ 75 H.P. SUBMERSIBLE PUMP IN GROUND RESERVOIR/ SEWERAGE PUMP HOUSE. TAKING OUT OF COLUMN PIPES & PUMPS SET OF 50/ 75 H.P. SUBMERSIBLE PUMPS FROM GROUND RESERVOIR/ S.P.H. INCLUDING PAINTING OF COLUMN PIPES ETC. & ERECTION OF PUMP SET INCLUDING ELECTRIC DISCONNECTION AND
CONNECTION ETC. COMPLETE
6
-
1529.28
... More
"REPAIR OF 65/ 75 H.P. SEWERAGE PUMPS. DISMANTLING, RE-ASSEMBLING & RE-ERECTION INCLUDING COMPLETE OVERHAULING WITH MINOR REPAIR, SUPPLY & REPLACEMENT OF MINOR PARTS SUCH AS KEY WASHER, SMALL NUT AND BOLT, SPILT PIN ETC."
5
-
1529.28
... More
"REPAIR OF 65/ 75 H.P. SEWERAGE PUMPS.REPAIR OF COLUMN ASSEMBLY SHAFT WITH WELDING, STRAIGHTENING,THREADING AND REPLACEMENT OF ASSEMBLY SHAFT SOCKET 1 ?"" SIZE."
5
-
1433.7
... More
"REPAIR OF 65/ 75 H.P. SEWERAGE PUMPS. REPAIR OF GLAND HOUSING INCLUDING SUPPLY & REPLACEMENT OF GLAND
BUSH."
5
-
573.48
... More
DISMANTLING OF TUBE-WELL PUMP SET, CLEANING & PAINTING OF COLUMN PIPES, THREADING & MAKING ADOPTER IF REQD. FOR PROPER COMPLETION OF THE JOB & REINSTALLATION OF THE T.W. PUMP SET COMPLETE INCLUDING PAINTING. & USING OF THREAD COMPOUND ( WHITE LEAD) IN COLUMN PIPE THREADS & CONNECTING THE EXISTING PIPE LINE. PARTY HAVE TO MEASURE GROUND WATER LEVEL BEFORE INSTALLATION OF T.W. PUMP SET AND DRAWN
DOWN LEVEL AFTER COMMISSIONING OF TUBE-WELL AT THE SATISFACTION OF THE ENGINEER I/C. THE WHOLE WORK SHALL BE AS PER DIRECTION OF WORK I/C RUBBER SHEET ETC. WILL BE PROVIDED FREE OF COST BY THE DEPTT. EXCEPT BLACK BITUMNISTIC ANTI ?CORROSIVE PAINT OF STANDARD MAKE & WHITE LEAD WHICH WILL BE SUPPLIED BY THE CONTRACTOR
14
-
2867.4
... More
TRANSPORTATION OF OLD PUMP SETS/ OTHER EQUIPMENT TAKEN-OUT FROM TUBE-WELL, SEWERAGE PUMP HOUSES AND GROUND RESERVOIRS ETC. TO T.W. NO.1 / WORKSHOP AND SHIFTING OF NEW PUMP SETS/ OTHER EQUIPMENT ETC. TO THE CONCERNED SITE FROM T.W. 1/ WORKHSOP . (BOTH TRIPS)
5
-
286.74
... More
SUPPLY AND REPLACEMENT OF M.S. BOLTS, NUTS OF DIFFERENT SIZE & SHAPE AS PER REQUIREMENT FROM TIME TO TIME. THE AVERAGE LENGTH OF THE BOLTS WILL BE OF 100 TO 150MM
250
-
23.9
... More
REMOVAL , RE-FIXING INCLUDING CARRYING OF DEFECTIVE MOTORS FROM SEWERAGE PUMP HOUSE AND GROUND RESERVOIRS TO T.W. NO.1 HEEP WORKSHOP AND NEW MOTOR FROM THERE TO THE SITE.(BOTH TRIPS) 35 HP TO 50 HP MOTORS
5
-
358.43
... More
CHECKING & REPAIR/ REPLACEMENT OF GLANDS, GREASING OF PUMPS & MOTORS IF REQD. OILING OF PUMPS OF SPH SEC. II & III AND GROUND RESERVOIR PUMP HOUSE AT T.W.NO.1, (HEEP), T.W NO.1 (CFFP) AND T.W. NO.5 IF REQD. ALL THE MATERIALS I.E . GLAND PACKING GREASE AND OIL ETC. WILL BE SUPPLIED BY THE DEPTT. FREE OF COST
150
-
133.81
... More
"REMOVAL , RE-FIXING INCLUDING CARRYING OF DEFECTIVE MOTORS FROM SEWERAGE PUMP HOUSE AND GROUND RESERVOIRS TO T.W. NO.1 HEEP WORKSHOP AND NEW MOTOR FROM THERE TO THE SITE.(BOTH TRIPS) 65 HP TO 75 HP MOTORS"
5
-
430.11
... More
"GROUND RESERVOIR 35HP TO 50HP PUMPS : REPAIR OF 35HP TO 50HP VERTICAL TURBINE PUMPS SUPPLY & REPLACEMENT OF EACH GUN METAL BUSH"
5
-
955.8
... More
"REPAIR OF 65/ 75 H.P. SEWERAGE PUMPS. SUPPLY AND REPLACEMENT OF SLEEVE."
12
-
573.48
... More
"REPAIR OF 90/100 H.P. SEWERAGE PUMPS DISMANTLING, RE-ASSEMBLING & RE-ERECTION INCLUDING COMPLETE OVERHAULING WITH REPAIR, SUPPLY & REPLACEMENT OF MINOR PARTS SUCH AS KEY WASHER, SMALL NUT AND BOLT, SPLIT PIN ETC."
5
-
1435.24
... More
"REPAIR OF 90/100 H.P. SEWERAGE PUMPS SUPPLY & REPLACEMENT OF EACH SLEEVE."
5
-
669.78
... More
"REPAIR OF 90/100 H.P. SEWERAGE PUMPS REPAIR OF PUMP BODY & WELDING IN BEARING HOUSING/ M.S. SLEEVE ON BEARING FIXING PORTION."
5
-
478.41
... More
REPAIR OF 90/100 H.P. SEWERAGE PUMPS REPAIR OF PUMP SHAFT. "
5
-
717.62
... More
"REPAIR OF 90/100 H.P. SEWERAGE PUMPS
SUPPLY & REPLACEMENT OF STUD FOR PUMP BODY."
5
-
71.76
... More
"REPAIR OF 90/100 H.P. SEWERAGE PUMPS REPAIR OF COLUMN ASSEMBLY SHAFT WITH WELDING, STRAIGHTENING, THREADING & REPLACEMENT OF ASSEMBLY SHAFT SOCKET 1 ?"" SIZE."
5
-
1435.24
... More
"REPAIR OF 90/100 H.P. SEWERAGE PUMPS
SUPPLY & REPLACEMENT OF GUN METAL BUSH."
5
-
956.83
... More
"REPAIR OF 90/100 H.P. SEWERAGE PUMPS REPAIR OF FLEXIBLE PROPELLER SHAFT INCLUDING ALL MATERIAL REQUIRED FOR PROPER REPAIR."
5
-
717.62
... More
"REPAIR OF 90/100 H.P. SEWERAGE PUMPS REPAIR OF GLAND HOUSING INCLUDING SUPPLY & REPLACEMENT OF GLAND BUSH."
5
-
956.83
... More
"REPAIR OF 90/100 H.P. SEWERAGE PUMPS UNIVERSAL COUPLING WITH CROSS BEARING TO BE SUPPLIED & REPLACED."
5
-
1435.24
... More
"REMOVAL , RE-FIXING INCLUDING CARRYING OF DEFECTIVE MOTORS FROM SEWERAGE PUMP HOUSE AND GROUND RESERVOIRS TO T.W. NO.1 HEEP WORKSHOP AND NEW MOTOR FROM THERE TO THE SITE.(BOTH TRIPS) 90 HP TO 100 HP MOTORS"
5
-
478.41
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements