Bharat Heavy Electricals Limited Tender

Calculate bid estimation of Uttarakhand BHEL Tender

Bharat Heavy Electricals Limited - BHEL Tender

Civil And Construction
Civil Works Others
Eprocure
Opening Date20 Mar 2023
Closing Date31 Mar 2023
Tender Amount₹ 8,50,905 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. (SI. NO.2.25 P-77)

238

40075

168.38

... More
Carriage of materials by Mechanical Transport including Loading, Unloading and Stacking: Earth: 1 Km (Sl. No. 1.1.2.1, P-66)

607

61036

100.56

... More
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m disposed soil to be levelled and neatly dressed: All kinds of soil (SI. NO.2.6.1 P-74)

488

68030

139.41

... More
Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer-in- charge. (S.I.No. 15.5, P-258)

7

4632

661.84

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. (TMT bars shall be issued free of cost at BHEL store) (Sl.no . 5.22.6, P-98) – (Sl. No. 5.22.6, Code no. 1005)

5960

86253

14.47

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) (Cement will be supplied free of cost from BHEL store.) (Sl.no .5.1.3, P-95) - (Sl. 5.1.3, P-448)

35

139020

3972.01

... More
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming Coat of approved steel primer all complete. (Structural steel shall be issued free of cost from BHEL store). (Sl.no. 10.1, P-183) -(Sl. 10.1, Code no. 1007)

985

16180

16.43

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. (Sl.no .5.9.2, P-96)

224

104627

467.09

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) (Cement will be supplied free of cost from BHEL store.) (Sl. 4.1.8, P-86) – (Sl.no. 4.1.8, P-446)

14.5

51865

3576.96

... More
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar. (S.l. no. 15.7.4, P-258)

9.5

10704

1126.83

... More
Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked materials. All kinds of soil (SI. NO.2.26.1 P-77)

436

30215

69.3

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete (Sl.no .5.9.1, P-96)

27

5895

218.37



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.