The Bazpur Cooperative Sugar Factory Limited Tender
View complete overview of Uttarakhand The Bazpur Cooperative Sugar Factory Limited Tender
The Bazpur Cooperative Sugar Factory Limited Tender
Machinery and Tools
Eprocure
Opening Date9 Jun 2020
Closing Date24 Jun 2020
Tender Amount₹ 18,00,000
Costs
EMD
₹ 30,000Document Cost
₹ 331Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_BCSFL_24156_1Bid Award Id
ViewTender No
BOILER1Tender Authority
The Bazpur Cooperative Sugar Factory Limited ViewPurchaser Address
-Website
http://http://www.bazpursugar.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Replacement of 76.2 mm. OD. x 3.66 mm. thick roof Tube of Taxmaco make Boiler Cap. 30 Ton Per Hr. The work include-dismantling of 76.2 mm. OD. above mentioned tube with Cutting of both ends, fabrication of both ends from new tube (76.2 mm. OD x 3.66 mm. thick)then fitting and welding of joint and expanding with Hydraulic testing at desire pressure and approval from Director of Boiler Uttrakhand
-
-
-
... More
Dismantling, Fabrication and erection of Seamless nipple of 44.45 mm. OD. x 4.06 mm. Thick. x 150 mm. long (With Supply) of W.I.L./Taxmaco/VKW Boiler.
-
-
-
... More
Dismantling, Fabrication and erection of Seamless nipple of 76.2 mm. OD. x 4.06 mm. Thick. x 150 mm. long (With Supply) of Boiler.
-
-
-
... More
Dismantling, Fabrication and erection of 82.5 mm.OD.x3.66 mm. Thick. Tube of VKW Boiler. 12 to 15meter long each
-
-
-
... More
Dismantling, Fabrication and erection of Seamless nipple of 82.5 mm. OD. x 3.66 mm.Thick. x 150 mm. long(With Supply) of VKW. Boiler.
-
-
-
... More
(a) with supply
-
-
-
... More
(b) without supply
-
-
-
... More
Dismantling, Fabrication and fitting of 3” NB Schedule 40 circulation Tube of 30 TPH Texmaco Boiler with Hydraulic Testing at Desire pressure and Approval from Director Of Boiler’s Uttrakhand.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements