Yamuna Expressway Industrial Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Yamuna Expressway Industrial Development Authority - YEIDA Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date4 Dec 2024
Closing Date30 Dec 2024
Tender Amount₹ 40,62,328 
Notes
Download

Costs

Summary

Annual Maintenance And Repair Work Of 120m Wide Road (ch.0.00-4.00km)in Sector -22d Yea

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in postion cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level. 1:4:8(1cement: 4 coarse sand:8 graded stone agregate 40mm nominal size) UPPWD SOR-2020/281

8.02

5820

46676.4

... More
Brick work with common brunt clay F.P.S (non modular) bricks of class designation 150 in foundation and plinth in : cement mortar 1:4(1cement:4coarse sand) UPPWD/SOR-2020

9.23

4950

45688.5

... More
12mm cement plaster of mix: 1:4(1cement:4coarse sand) UPPWD/SOR-2020/13.4.1

40.11

164

6610.13

... More
Providing and laying at or near ground level factory made kerb stone of M-25 grade cemnet in position to the required line, level and curvarture jointed with cemnet mortar 1:3(1cement:3coarse sand) including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm) including making drainage opening wherever required complete etc. as per dirction of Engineer-in-charge (lenght of finished kerb edging shall be measured for Payment). (precast C.C.kerb stone shall be approved by Engineer-in-charge) UPPWD/SOR-2020/16.69

10.39

6899

71688.92

... More
Providing and laying at or near ground level factory made kerb stone of M-25 grade cemnet in position to the required line, level and curvarture jointed with cemnet mortar 1:3(1cement:3coarse sand) including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm) including making drainage opening wherever required complete etc. as per dirction of Engineer-in-charge (lenght of finished kerb edging shall be measured for Payment). (precast C.C.kerb stone shall be approved by Engineer-in-charge) UPPWD/SOR-2020/AR for old kerb stone

4

588

2352.8

... More
white washing with lime to give an even shade: New work (two or more coats) UPPWD/SOR-2020/13.37.1

4800

13

62400

... More
Earth work in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods watering, rolling each layer with 1/2 tonne roller or wooden or steel rmmers and rolling every 3rd and top most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, floods banks, marginal banks and guide banks or filling up ground depressions, all leads up to 1 km Morth. all kind of soil UPPWD/SOR-2020/AR/YEIDA.

2000

275

551600



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.