Yamuna Expressway Industrial Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Yamuna Expressway Industrial Development Authority - YEIDA Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date24 Jun 2022
Closing Date7 Jul 2022
Tender Amount₹ 60,33,373
Costs
EMD
₹ 1,21,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_YEIDA_708751_39Bid Award Id
ViewTender No
YEA/GM(PROJECT)/2022/586 DT-13/06/2022Tender Authority
Yamuna Expressway Industrial Development Authority ViewPurchaser Address
-Website
http://etender.up.nic.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
M-150 brick work in 1:4 one cement and four course sand 2.20 F.M. mortar in foundation and plinth including supply of all material, labour, T&P etc. required for proper completion of the work. (UPPWD/SOR-2020/305(a)
245.44
-
4950
... More
M-150 brick work in 1:4 one cement and four course sand 2.20 F.M. mortar including supply of all material, labour, T&P etc. required for proper completion of the work. But in superstructure including necessary Cutting & moulding of brick as required thickness of walls not to be less than 1½ brick. Add extra labour to above items. (UPPWD/SOR-2020/309)
142.08
-
5790
... More
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. “(Note:- Cement content considered in this item is @ 330 kg/cum.“Excess/ less cement used as per design mix is payable/recoverable separately).
-
-
-
... More
All works upto plinth level. (DAR/5.33.1/Based on UPPWD/SOR-2020))
83.52
-
7849.65
... More
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. “(Note:- Cement content considered in this item is @ 330 kg/cum.“Excess/ less cement used as per design mix is payable/recoverable separately).
-
-
-
... More
All works above plinth level upto floor V level. (DAR/5.33.2/Based on UPPWD/SOR-2020))
43.04
-
8592.05
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
-
-
-
... More
Thermo-Mechanically Treated bars of grade Fe-500D or more./Cold twisted bars. (DAR/5.22.6/Based on UPPWD/SOR-2020))
12418.72
-
108.35
... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights :
-
-
-
... More
Foundations, footings, bases of columns, etc. for mass concrete. (DAR/5.9.1/Based on UPPWD/SOR-2020))
342.08
-
181.65
... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights :
-
-
-
... More
Lintels, beams, plinth beams, girders, bressumers and cantilevers. (DAR/5.9.5/Based on UPPWD/SOR-2020))
507.28
-
337.65
... More
Centering and shuttering including strutting, propping etc. and removal of form for all heights :
-
-
-
... More
Columns, Pillars, Piers, Abutments, Posts and Struts. (DAR/5.9.6/Based on UPPWD/SOR-2020))
410.08
-
426.8
... More
15mm cement plaster on rough side of single or half brick wall of mix: 1:6 (1 cement : 6 coarse sand) (DAR/13.5.2/Based on UPPWD/SOR-2020))
909.44
-
191.35
... More
12mm cement plaster of mix: 1:6 (1 cement : 6 coarse sand) (DAR/13.4.2/Based on UPPWD/SOR-2020)
1063.12
-
164.8
... More
Finishing walls with water proofing cement paint of required shade : New work (two or more coats applied @ 3.84 Kg/10 Sqm.) (DAR/13.44.1/Based on UPPWD/SOR-2020))
1972.56
-
44
... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work. (DAR/13.61.1/Based on UPPWD/SOR-2020)
168
-
77.15
... More
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.
-
-
-
... More
In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. (DAR/10.25.2/Based on UPPWD/SOR-2020))
3092.08
-
120.95
... More
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.
-
-
-
... More
With G.I. barbed wire. (DAR/16.18.1/Based on UPPWD/SOR-2020))
4030.4
-
13.75