Yamuna Expressway Industrial Development Authority Tender

... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.

Yamuna Expressway Industrial Development Authority - YEIDA Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date8 Jan 2025
Closing Date3 Feb 2025
Tender Amount₹ 23,48,605 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement Concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & plants etc reguired for proper complection of the work -UPPWD SOR /281/P-17

50.81

5820

295714.2

... More
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : Providing and fixing tie bolt, spring coil and plastic cone in wall shuttering complete as per the direction of Engineer-in-charge 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) UPPWD-SOR-2020/

17.59

7743

136199.37

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. Thermo-Mechanically Treated bars. UPPWD SOR-2020/DAR-18/5.22.6

2070.63

92

190912.09

... More
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. (DAR/10.25.2/Based on UPPWD/SOR-2020))

253.44

101

25622.78

... More
Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge. Made of G.I. wire of dia 4 mm (DAR/16.70.1/Based on UPPWD/SOR-2020)

1849.2

549

1015580.64

... More
Supplying at site R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-in- charge (cost of earth works in excavation, concrete works in foundation to be paid separately).(DAR/16.15.1/Based on UPPWD/SOR-2020)

20.34

22583

459345.34

... More
Centering and shuttering including strutting, proppingFoundations, footings, bases of columns, etc. for mass concrete. UP PWD SOR 2020 /DAR-18/5.9.1

8.64

181

1569.46

... More
Lintels, beams, plinth beams, girders, bressumers and cantilevers.(DAR/BasedonUPPWD/SOR-2020)

13.8

337

4659.57

... More
Columns, Pillars, Piers, Abutments, Posts and Struts.(DAR/5.9.6/Based on UPPWD/SOR-2020)

15.46

426

6598.33

... More
M-150 brick work in 1:4 cement & fine sand 1.25F.M mortar in foundation and plinth including supply of all materials labour complection of the work UPPWD SOR 303 Same as item no 305 but in 1:4 one ceement & four coarse sand of 2.20 F.M mortar UPPWD SOR 2020/305a

30.52

4950

151074

... More
12mm cement plaster of mix:1:6 (1 cement : 6 coarse sand) UP PWD SOR-2020

128.2

164

21127.36

... More
centering & shuterring including strutting propping etc & removal of form for:Centering & Shuttering including strutting, propping etc and removal of form for suspended floors, roofs,landing, balconies and access platform

14.75

386

5701.61

... More
centering & Shuttering including strutting, propping etc at all level edges of slabs & breaks in floors and walls under 20cm wide

13.9

127

1770.86



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.