Varanasi Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Varanasi Development Authority Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date24 May 2023
Closing Date7 Jun 2023
Tender Amount₹ 2,15,12,000
Costs
EMD
₹ 2,00,000Document Cost
₹ 10,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_UPVDA_805300_1Bid Award Id
ViewTender No
160/vda/nir/2023-24Tender Authority
Varanasi Development Authority ViewPurchaser Address
-Website
http://https://vdavns.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and fixing C.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately) : ( DSR 2021, S.I. No. 18.31.1.2 )
100 mm diameter Class II
1
-
-
... More
DRANIAGE WORK
-
-
-
... More
Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5m and lead upto 30m and including filling watering and ramming of excavated earth into the space between the building and the sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the E/I upto a distance of 30 m from the foundation trenches includind all T&P, Phowarah and basket etc. Complete. (SOR 2020 S.I. No. 251)
1
-
-
... More
Concrete with 4 cm. gauge stone ballast, coarse sand and cemnet in the proportion of 1:4:8 in foundation including supply of all material, labour and tools and plants. Etc. required for proper completion of work. [SOR 2020 S.I No.281]
1
-
-
... More
RCC work with cement, apporve coarse sand and 2 cm. gauge apporved stone ballast in the proportion of 1:1.5:3 in walls exluding its fixing and binding the same with 24 B.W. G.G.I. binding wire and including necessary centering and shuttering etc and also including supply of all materials labour and T&P etc. required for proper completion for the work. ( PWD SOR 2020, S.I. No. 288b)
1
-
-
... More
RCC work with cement, apporve coarse sand and 2 cm. gauge apporved stone ballast in the proportion of 1:1.5:3 in Raft foundation exluding its fixing and binding the same with 24 B.W. G.G.I. binding wire and including necessary centering and shuttering etc and also including supply of all materials labour and T&P etc. required for proper completion for the work. (Based on PWD SOR 2020, S.I. No. 287b)
1
-
-
... More
Mild steel or iron work in plain work such as in R.C. or R.B. work wrought to required shape as necessary including bending for proper completion for the work and including supply of steel its wastage. (SOR 2020, SI No. 504)
1
-
-
... More
CULVERT
-
-
-
... More
Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5m and lead upto 30m and including filling watering and ramming of excavated earth into the space between the building and the sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the E/I upto a distance of 30 m from the foundation trenches includind all T&P, Phowarah and basket etc. Complete. (PWD SOR 2020 S.I. No. 251)
1
-
-
... More
Concrete with 4 cm. gauge stone ballast, coarse sand and cemnet in the proportion of 8:4:1 in foundation including supply of all material, labour and tools and plants. Etc. required for proper completion of work. [SOR 2020 S.I No.281]
1
-
-
... More
RCC work with cement, coarse sand and 2cm gauge stone grit in the proportion of 1:1.5:3 in column excluding its fixing and binding the same with 24 BWGGl binding wire and including necessary centering and shuttering etc and also including S/o all materials required for proper completion of the work. Binding wire tobe supplied by the contractor free of cost. AS in item No. 283 above but for slabs. [PWD SOR 2020-288(b)]
1
-
-
... More
RCC work with cement, coarse sand and 2cm gauge stone grit in the proportion of 1:1.5:3 in slab excluding its fixing and binding the same with 24 BWGGl binding wire and including necessary centering and shuttering etc and also including S/o all materials required for proper completion of the work. Binding wire tobe supplied by the contractor free of cost. AS in item No. 283 above but for slabs. [PWD SOR 2020-284(b)]
1
-
-
... More
Mild steel or iron in plain work such as in reinforced concreted or reinforced brick work (when not included in overall rates) wrough to required shape as necessary includind bending for proper completion of the work and including supply of steel its wastage. Bend hooks and authorized overlapping shall be measured. [PWD SOR 2020-504]
1
-
-
... More
PARKS
-
-
-
... More
Excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.5m and lead upto 30m and including filling watering and ramming of excavated earth into the space between the building and the sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the E/I upto a distance of 30 m from the foundation trenches includind all T&P, Phowarah and basket etc. Complete. (SOR 2020 S.I. No. 251)
1
-
-
... More
Concrete with 4cm. Gauge brick ballast sand of 1.25 F.M and cement in proportion of 1:5:10 in foundation and under floors including supply of all materials labour and tools and plants etc. required for proper completion for the work. P.W.D. S.O.R. 274-2020
1
-
-
... More
M-150 brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all material, labour and tools and plants. Etc. required for proper completion of work. [PWD SOR-2020 SI No. 305(b)]
1
-
-
... More
M-150 brick work in 1:4 cement and Coarse sand mortar in super structure for one brick thick wall including supply of all material, labour and tools and plants. Etc. required for proper completion of work. P.W.D. SOR S.I 305b + 309
1
-
-
... More
12 mm thick plaster with cement mortar in proportion of 1:4 cement and approved F. Sand including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of E/I. As per P.W.D.S.O.R. 584
1
-
-
... More
Mild steel or iron work in heavy sizes such as built up gates, trusses, record racks etc wrought to required form including drilling holes, rivetting and welding where necessary and their fixing required for proper completion for the work. DSR -2021 Sl.No-503
1
-
-
... More
Wall painting with plastic emulsion paint of First quality apporved brand and manufacture on undecrated wall surface to give an even shade including thoroughly brushing the surface free from mortar droppings and other foreign matter and sand prepared smooth. PWD SOR-2020 Pg.No-38 It.No-22
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements