If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Varanasi Development Authority Tender
Civil Works Others
Eprocure
Opening Date7 Jun 2018
Closing Date19 Jun 2018
Tender Amount₹ 7,55,208
Costs
EMD
₹ 16,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Construction of Nala from Karaudi Chauraha to Chhoti Puliya
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_UPVDA_213958_1Bid Award Id
ViewTender No
273-A-4/VP/Ni/2018-19Tender Authority
Varanasi Development Authority ViewPurchaser Address
-Website
http://https://vdavns.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
A-Bricks
4692
-
-6.25
... More
B-Brick bats
15.3
-
-1250
... More
Excavation in foundation in ordinary soil (loam clay or sand) including lift up to 1.5m and lead up to 30m. And including filling, watering and ramming of excavated earth into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of sruplus earth as directed by the Engineer in charge up to a distance of 30m from the foundation trenches including all T&P phowarah and basket etc. complete. SI 251/2015
130
-
81.73
... More
Concrete with 4cm guage brick balast sand of 1.25FM and cement in proporation of 10:5:1 in foundation and under including supply of all materials labour T&P etc required for proper completion of the work.
24
-
3307.69
... More
M-150 class brick in 1:4 cement and coarse sand of 2.26FM mortar in foundation & plinth including supply of all materiasl labour T&P etc required for proper completion of the work.
62
-
4394.23
... More
12mm thick plaster on wall including 1 part of cement and 3 part of corase sand including supply of all materials labour T&P ect 1:3 cement and fine sand.
205
-
146.15
... More
Cost cement concret as in door sills chaukhat boundary post as similar precast unit with cement approved coarse sand and 20mm guage approved stone ballast in proporation of 1:2:4 and all materials labour T&P etc all complete.
7.5
-
5913.46
... More
RCC work with cement approved coases sand and 20mm gauge stone grit in proportion of 1:1.5:3 (1cement 1.5sand 3stone grit of 20mm nominal size) in slab excluding supply of reinforcement and its binding but including its fixing and binding the same with 24BWGGI binding wite an necessary centering and shuttering etc and also including supply of all materials labour T&P etc required for proper completion of the work.
26
-
7836.53
... More
Mild steel or iron in poain work such as in reinforced concrete or reinforced brick work (when not included in overall rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage, Bend hooks and authorized overlapping shall be measured.
25
-
5769.23
... More
Disposal of surplus earth up to distance of 2km as per direction of EI.
78
-
112.5
... More
Dewatering pump 5HP with all complete work as per direction EI.
3
-
846.15