Uttar Pradesh State Sugar Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh State Sugar Corporation Limited Tender
Eprocure
Opening Date9 Nov 2020
Closing Date17 Nov 2020
Tender AmountRefer Documents
Costs
EMD
₹ 5,30,000Document Cost
₹ 29,500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_UPSSC_529007_1Bid Award Id
ViewTender No
CE/Moh./S.G./20-21/734Tender Authority
Uttar Pradesh State Sugar Corporation Limited ViewPurchaser Address
-Website
http://http://www.upsugcorp.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the Engineer-in-Charge within a distance of 60 meter (200) feet.
18
-
316
... More
Dismantling reinfrced cement concrete or reinforced brick work including stacking of materials as directed by the Engineer-in-Charge within a distance of 60 meter (200) feet.
8
-
575
... More
Supply and filling of good quality earth in layers and compacting it in layers including Earth work in cutting or in embankment in ordinary soil, excavation to be done in the form of regular pits, not exceeding 0.50 m in depth and e. w. in embankment to be in 20 cm layers, including ramming and dressing the surface to required level and slopes and also including 1.50 m lift and 30.00 m lead or as directed by the E/I including cartage of earth from 10.0 km. distance, loading & unloading, labour, T&P, including cost of earth, other statury charges, wastage etc., required for proper completion of work.
4780
-
276.5
... More
Mechanical compaction of earth work to achieve 95% proctor density including arrangements of all T&P, roller & it's fuel complete.
4780
-
20
... More
Excavation in foundation in ordinary soil , including lift up to 1.50 M and lead up to 30.00 Mtr. including filling watering and ramming of excavated earth in to the trenches or in to the space between the building and the sides of foundation trenches or in to the plinth including removal & disposal of surplus earth as directed by E/I up to a distance of 30 M complete.
1500
-
85
... More
Add to item no.1.07 above for every additional 30 M lead or part of 30M or for every additional 1.50M lift or part of 1.5M
565
-
12
... More
Cement Concrete with 4 CM gauge approved stone ballast,coarse sand & cement in the proportion of 8:4:1 including supply of all materials,labour, Tools & Plants, Westage etc. required for proper completion of the work
378
-
4240
... More
Providing and laying in position machine batched and machine mixed, Design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per mixed design, including pumping of concrete to site of laying, cost of centering & shuttering, finishing & binding of reinforcement, cost of binding wire and providing admixture in recommended proportion as per IS-9103 to accelerate, retarde setting of concrete, improve workability without imparing strength and durability of concrete in foundation /Isolated footing etc., including supply of all materials,labour,T&P, wastage etc. required for proper completion of the work .
174
-
7180
... More
Same as item no. 1.1 above but providing &laying R.C.C M-25 grade concrete in lintels of door & windows etc., including supply of all materials, labour, T&P etc. required for proper completion of the work .
0.3
-
8030
... More
Same as item no. 1.1 above but providing &laying R.C.C M-25 grade concrete in R.C.C. slab etc., including supply of all materials, labour,T&P, shuttering, wastage etc. required for proper completion of the work .
5.1
-
9020
... More
Same as item no. 1.1 above but providing &laying R.C.C M-25 grade concrete in R.C.C beams etc., including supply of all materials, labour,T&P, shuttering, wastage etc. required for proper completion of the work. (for all heights)
161
-
9680
... More
Same as item no. 1.1 above but providing &laying R.C.C M-25 grade concrete in R.C.C columns etc., including supply of all materials, labour,T&P, shuttering, wastage etc. required for proper completion of the work. (for all heights)
116
-
9790
... More
M-150 Brick Work in 1:4 (One cement & four fine sand of 1.25 F.M) mortar In foundation & Plinth. Including supply of all material ,labour, T & P,wastage etc. required for proper completion of the work.
30
-
4364.6
... More
M-150 Brick Work in 1:4 ( One cement & four fine sand of 1.25 F.M) mortar In super structure including necessary cutting & moulding of bricks as required, thickness of wall not to be less than 1½ brick, including supply of all material, labour, T & P, wastage etc. required for proper completion of the work. (for all heights)
773
-
4584.6
... More
2.5 cm thick Damp proof cource with cement and concrete consisting one part cement, 1½ parts approved coarse sand and 3 parts approved 10 mm graded stone grit and including water proofing material as ordered by the Engineer- Incharge in the proportion as specified by the manufacturer, including supply of all materials ,labour ,T&P etc. required for proper completion of the work and inciuding proper curing & shutterings as necessary.
2
-
300
... More
12.00 mm thick plaster with cement & fine sand of 1.25 F.M mortar in 1:4 proportion, minimum thickness not to be less than 10 mm, including supply of all materials, labour, T&P, wastage etc. required for proper completion of the work. (for all heights)
5505
-
150
... More
15.00 mm thick plaster with cement & fine sand of 1.25 F.M mortar in 1:4 proportion minimum thickness not to be less than 12mm, including supply of all materials, labour, T&P, wastage etc. required for proper completion of the work. (for all heights).
836
-
166
... More
12.00 mm thick plaster with cement & fine sand of 1.25 F.M mortar in 1:4 proportion minimum thickness not to be less than 10 mm, on ceiling including supply of all materials, labour, T&P, wastage etc. required for proper completion of the work.
45
-
166
... More
Supply and filling of fine sand of 1.25FM in plinth and under floor including supply of necessary quantity of sand of 1.25 F.M and including watering, dressing etc., cost of sand, labour and T&P, wastage etc. required for proper complition of the work.
585
-
1280
... More
Providing and Injecting Chemical for precontruction anti termite treatment and creating chemical barrier under and around the column pits, wall trenches, basement, excavation top surface in plinth filling, under floors, junction of wall and floor, along the external perimeter of building, expantion joints surrounding or pipes and conduit etc, complete(plinth area of the building at ground floor only shall be measured as per IS 6313 part ii 1981) aldrine emulsifiable concentrate or any other approved material such as heptachlor of chlordane will be used, including cost of aii material, labour, T&P, wastage etc. required for proper completion of work. The rate of application of chemical emulsion shall be as follows:- 1-Treatment for massonary and foundation 5 liters per sqm. 2-Back fill in immediate contact with foundation 7.5 ltr per sqm. 3-Treatment of Surface of Plinth filling 5 ltr per Sqm 4-Treatment of soil along external parameter of Building 7.5 ltr per Sqm. 5-Treatment of Soil Under external parameter 5 ltr per Sqm,
2052
-
200
... More
Providing and fixing barbed wire fencing including its fixing to posts after stretching it, including supply of all materials, labour, T&P etc. required for proper completion of work weight of barbed wire shall be 9.38 Kg./100 RM
2250
-
10.7
... More
Supply and laying 250 micron HDPE sheet including proper jointing and over lapping etc. as required/ as per direction Engineer-In-Charge including supply of all materials, labour, T&P, wastage etc.required for proper completion of the work.
1919
-
27.5
... More
50 mm thick1:2:4 plain cement concrete floor with cement approved coarse sand and 2.00 cm graded approved stone grit,laid in panels finished with 3.00mm floating coat of neat cement or cement and marble dust in ratio 5:1 as specified,removing any overlapping mortar at the joints of the panels if any and giving them a uniform finish, including supply of all materials, labour,T&P, wastage etc.required for proper completion of the work.
256
-
352.5
... More
Providing and laying *bricks coba* 12mm thick laid with M-150 class brick bat coba 7.50 cm thick with gap of 15mm to each other, over 20mm thick base of cement mortar 1:4 cement and coarse sand mixed with water proofing compound spreading cement slurry mixed with acrylic cement concrete water proofing compound, filled gaps of coba & top of coba with mortar mixed with water proofing compound in 1:4 cement and coarse sand mortar finished smooth & top mashed, false square 30cm x30cm and side wall parapet shall be monolythic, plaster wall upto 30 cm higher and junction and corner shall be rounded by brick ballast cement and coarse sand masonary coba with top finished plaster mixed with acetic water proofing compound @ 2% by weight & including supply of all material, labour, T&P, wastage etc complete for proper completion of work.
33
-
910
... More
supply and fixing of single skin colour coated Profile roof sheets of 1015 mm effective cover width and nominal 28.3 mm deep ribs with subtle square fluting in the five pan at nominal 203 mm centre to centre & also fixing the sheet with self driven/self tapping screws with use of drill machines.The feed material for sheet is manufactured out 0.45 mm.Base metal thickness,(0.50 mmTCT,coiour coating thickness is over and above the thickness stated above),Hi-Tensile steel with minimum 550 MPa yield strength metallic hot dip coated with zinc/Aluminium alloy (55% Aluminium, 45% zinc) as per IS 1397 Zincalume/Galvalume AZ 150 (Minimum 150 grams/sqm,total on both side) of steel. The paint shall have a total coating thickness of 35µm comprising, nominal 20 µm exterior coat on the top surface and nominal 5µm reverse coat on back surface over nominal 5 µm primer coat on both sides of approved colour shade of the sheet .The rate to include cost of all materials, labour, T&P, Sundries, wastage etc. required for proper completion of work.(For all heights)
2082
-
694
... More
Same as item no. 1.27 above but providing and fixing single skin colour coated profile roof sheet roofing accessories/ ridge using self drilling/self tapping screws complete (For all heights ).
65.5
-
339
... More
supply & fixing fan hook of 16 mm dia mild steel bar in ceiling, including supply of all materials, labour, T&P etc. required for proper completion of the work.
2
-
80
... More
M.S or iron work of small sizes and section such as holding down bolts,hold fasts,tie rods,grating etc.,wrought to required form including supply of steel bolts,nuts ,wastage etc. And their fixing required for proper completion of the work.
1
-
5400
... More
Supply and fixing rolling shutters of approved make made 80x125 mm cold rolled M.S. Iath inter locked throughout their entire length and joined together at the end by end locks and mounted on specially designed pipe shaft with brackets,side guides and arrangements for inside and outside locking with push and pull operation complete but excluding cost of top cover and springs. The rate to include supply of all materials, labour, T&P, wastage etc. required for proper completion of the work.
31
-
1550
... More
Providing and fixing 27.5 cm long wire spring grade 2 for rolling shutters including supply of all materials, labour, T&P etc. required for proper completion of the work.
10
-
820
... More
Providing and fixing top cover for rolling shutters made with 18 guage MS sheet, 2.50 meter wide, including supply of all materials, labour, T&P, wastage etc. required for proper completion of the work.
4
-
940
... More
Providing and fixing ball bearing for rolling shutters, including supply of all materials, labour, T&P etc. required for proper completion of the work.
8
-
880
... More
Add extra to S.I. No. 1.31 for providing mechanical device,chain and cranks,operation for operating shutters, including supply of all materials, labour, T&P etc. required for proper completion of the work. (shutters above 11.2m²but upto 16.80m²area)
31
-
260
... More
Same as item no.1.3 above but iron and steel work in M.S. Grills/stair case railing/gates/boundary posts/trusher/racks etc. including supply of all materials, labour, T&P, wastage etc. required for proper completion of the work.
18
-
6150
... More
M.S. or Iron work in plain work such as RCC/R.B. work including bending for proper shape and including supply of steel & its wastage, bend hooks and authorized over laping shall be measured and including cost of binding wire. Rate to include supply of all materials, labour, T&P, wastage etc. required for proper completion of the work. (For all Heights)
591
-
5850
... More
Steel work with hot finished seamless type tubes in built up tubular (round, square or rectangular hollow tubes etc.) trusses purlines etc. Including cutting, fabrication, finishing, hoisting, fixing in position and applying one priming coat of approved steel primer & 2 coat of synthetic enamel including welding and bolted with special shaped washers etc. complete, including cost of all materials, labour, T&P, wastage etc. required for proper completion of the work.(for all heights)
38750
-
113.8
... More
Providing and Laying 150 mm thick design mix cement concrete M25 grade for flooring/ pavement etc. using cement content as per design mix, using coarse sand and graded stone aggregate of 20 mm nominal size in appropriate proportions as per approved & specified design criteria, providing tie bars wherever required, mechanical laying at site in alternate panels as per proposed patterns shown in the drawing including spreading, levelling, finishing including providing and fixing sturdy MS angle/ channel as shuttering, consolidation with mechanical screed vibrator finishing the top surface as per required finish including all labour,T&P & materials as per drawing or as per direction of E/I and curing of executed work shall be as per RCC work. The rate shall be excluding the cost of reinforcement and its bending but including binding of the same & cost of binding wire and filling the joints with bitumin/suitable joint filler. Trimix vacuum dewatering system for spreading, screeding, dewatering and floring & trawling of concrete floor as per direction of E/I or as specified. The rates are also inclusive of cutting of 6mm wide joints in the floor upto required depth of 6x20 mm of the slab/pavement using mechenial saw and inserting joints sealent with hot bitumin, including supply of all materials, labour, T&P, wastage etc. required for proper completion of the work.
288
-
7440
... More
Engraving lines in plaster 10mm deep&same width outer face wall vertically & horizontally to display the surface or at the junction of RCC and brick work, as directed by the engineer incharge including supply of all materials, labour, T&P etc. Required for proper completion of the work. (for all heights)
5273
-
6
... More
Brick soling with straingth over burnt bricks laid on edge and dry with brick edging on both sides including preparation of subgrade to prescribed camber and including supply of bricks, filling joints with local earth of P.I. 5 to 7, spreading blinding coat 1 cm (3/8") depth of local earth over the entire surface and including supply of all materials, labour tools and plants, wastage etc. required for proper completion of the work.
2631
-
360
... More
Finishing wall with water proofing cement paint of approved make and quality on new work with 2 coat to give an even shade including supply of all materials, labour, T&P, wastage etc. required for proper completion of the work. (for all heights)
4200
-
55
... More
Painting roofs or other iron work in large area with one coat priming and two coat of approved paint including supply of all materials, labour, T&P, wastage etc. required for proper completion of work, paint used should be ISI marked. (for all heights)
160
-
85
... More
White washing three coat including supply of all materials, labour, tools & plants, wastage etc. required for proper completion of the work. (for all heights)
2150
-
15
... More
Supply and fixing 10.00 cm internal dia P.V.C downpipe (kisan/suprime make) compiete with bends with door at top and plain at bottom and gratings and including supply of necessary M.S clamp 2.50cmx3.00mm fixed to walls with cement mortar (1:2) and including supply of 15 cm long 6mm dia nails ,all materials,labour and T&P etc. required for proper completion of the work and also including repair of plaster, pointing etc.,if damaged during fixing of pipes.
8
-
370
... More
Providing and fixing glass strips of 4.00 mm thickness and3.50 cm depth, in joints of floor and skirting at the time of lating, including cost of all material, labour,T&P, wastage etc complete.
125
-
18
... More
Disposal of rubbish and all other malwa etc.from site of work, beyond a distance of half KM. and upto a distance of 1.00 km. from site of work includig all labour, carrage charges, loading & unloading, T&P, fuel etc. required for proper completioh of work.
100
-
101
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements