The UPSIDA has issued a formal invitation for competitive bids for the Uttar Pradesh State Industrial Development Authority project, for Construction Of Balance Drain Along Road No 3 And Maintenance Of Drains And Central Verge At Ia Kosi Kotwan Extn Ii District Mathura in Mathura, Uttar Pradesh. The bid opening date for this tender is 30-08-2021 and the last date for bid submission is 06-09-2021. Interested bidders for Uttar Pradesh State Industrial Development Authority tender can download the important documents here to check the tender amount, scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 1,44,400Document Cost
₹ 3,300Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_SIDC_614819_1Bid Award Id
ViewTender No
CD_V_22_Dt_02072021Tender Authority
Uttar Pradesh State Industrial Development Authority ViewPurchaser Address
-Website
http://http://www.onlineupsidc.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Laying at or near ground level old kerb stones of all types in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. (Length of finished kerb edging shall be measured for payment). (Old kerb stones shall be supplied by the department free of cost)
1000
-
-
... More
Excavation in foundation in ordinary soil (Loam, Clay or Sand) including lift upto 1.50 m and lead upto 30m and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches
504
-
-
... More
Providing and laying cement concrete in 1:5:10 (1 Cement : 5 Coarse sand : 10 graded stone aggregate 40 mm nominal size) and curing complete, including cost of form work. In Foundation and floors.
126
-
-
... More
15mm Cement plaster with cement mortar in proportion of 1:3 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm in girth and finished even and smooth.
1250
-
-
... More
Coursed rubble masonry (First short) with hard stone in foundation and plinth with cement mortar 1:4 (1cement : 4 coarse sand).
434.7
-
-
... More
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge).
52.5
-
-
... More
Flush Cement Pointing with cement mortar 1:2 (1cement : 4 coarse sand) of 1.25 F.M. on stone work including supply of material, labour T&P etc. required for proper completion of the work.
2565
-
-
... More
Painting Three coat over priming coat on steel and other metal surfaces up to 10cm width or girth or small articles not exceeding 0.10 Sqm. in area with superior synethetic enamel such as Luxol 3, Hi gloss Apcolite, Superiac, Dulux specified brushing to give and even shade and including the cleaning the surface of all dirt, dust and other foreign matter sand papering and plants etc. required for proper and Extra One Coat over Priming & Painting 1st Coat.
875
-
-
... More
Providing and laying damp-proof course 25 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size)