Uttar Pradesh State Industrial Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh State Industrial Development Authority - UPSIDA Tender
Civil And Construction
Road Construction
Eprocure
Opening Date9 May 2022
Closing Date16 May 2022
Tender AmountRefer Documents
Costs
EMD
₹ 7,31,648Document Cost
₹ 7,267Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_SIDC_697610_1Bid Award Id
ViewTender No
cd_2_100_dt_07012022Tender Authority
Uttar Pradesh State Industrial Development Authority ViewPurchaser Address
-Website
http://http://www.onlineupsidc.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
M.S. in plain work including all material, labour, T & P etc. required for proper completion of the work as per direction of Engineer-in-Charge.
8030.11
-
-
Supply & Stacking of 45-63 mm gauge approved stone ballast (10cm loose) for patches & inter coat duly stacked on road side true to template including dressing surface where materials is to be staked including cost of materials its cartage octoi royalty, labour T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge.
765.54
-
-
Supply & Stacking of 22.4-53 mm gauge approved stone ballast (10cm loose) for patches & top coat duly stacked on road side true to template including dressing surface where materials is to be staked including cost of materials its cartage octoi royalty, labour T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge.
1415.73
-
-
Supply & Stacking of crushed stone dust for consolidation of stone ballast as screening material including octoi royalty, labour T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge.
436.25
-
-
Consolidation of 45-63 mm gauge hard stone ballast for 10cm (loose) thick inter coat by road roller including hire and fuel charges of road roller excluding cost of stone ballast but including opening out stacks, sorting ballast into different sizes spreading making medhi to retain water also including labour for spraying screening material to be used for blinding purpose and also including cost of carriage of materials & water and T & P etc. required for proper completion of the work water for consolidation to be arranged by the contractor himself at his own cost as per direction of Engineer-in-charge.
765.54
-
-
Consolidation of 22.4-53 mm gauge hard stone ballast for 10cm (loose) thick top coat by road roller including hire and fuel charges of road roller excluding cost of stone ballast but including opening out stacks, sorting ballast into different sizes spreading making medhi to retain water also including labour for spraying screening material to be used for blinding purpose and also including cost of carriage of materials & water and T & P etc. required for proper completion of the work water for consolidation to be arranged by the contractor himself at his own cost as per direction of Engineer-in-charge.
1415.73
-
-
Water allowance to be allowed between 15 November to 31st May required for proper completion of the work as per direction of Engineer-in-Charge.
2181.27
-
-
Providing and laying factory made chamfered edge cement concrete paver blocks (80mm thick M-40 grade) in footpath, park & lawns driveway or light & traffic parking etc. of required strength thickness and size/shape, made by table vibratory method using PU mould, laid in required color and pattern over 50mm thick compacted bad of coarse sand, compacting and prober embedding/ laying of interlocking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size & pattern, finishing & sweeping extra sand, all complete as per manufacture specifications & direction of Engineer-in-Charge.
18785
-
-
Cement concrete with 2cm. gauge stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, T & P etc. required for proper completion of the work.
290.4
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements