Uttar Pradesh State Industrial Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh State Industrial Development Authority - UPSIDA Tender
Civil And Construction
Road Construction
Eprocure
Opening Date8 Apr 2022
Closing Date18 Apr 2022
Tender Amount₹ 3,08,03,327
Costs
EMD
₹ 6,16,067Document Cost
₹ 6,584Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_SIDC_686194_1Bid Award Id
ViewTender No
cd_2_89_dt_09122021Tender Authority
Uttar Pradesh State Industrial Development Authority ViewPurchaser Address
-Website
http://http://www.onlineupsidc.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Consolidation of 45-63 mm gauge hard stone ballast for 10cm (loose) thick inter coat by road roller including hire and fuel charges of road roller excluding cost of stone ballast but including opening out stacks, sorting ballast into different sizes spreading making medhi to retain water also including labour for spraying screening material to be used for blinding purpose and also including cost of carriage of materials & water and T & P etc. required for proper completion of the work water for consolidation to be arranged by the contractor himself at his own cost as per direction of Engineer-in-charge.
619.44
-
-
... More
Consolidation of 22.4-53 mm gauge hard stone ballast for 10cm (loose) thick top coat by road roller including hire and fuel charges of road roller excluding cost of stone ballast but including opening out stacks, sorting ballast into different sizes spreading making medhi to retain water also including labour for spraying screening material to be used for blinding purpose and also including cost of carriage of materials & water and T & P etc. required for proper completion of the work water for consolidation to be arranged by the contractor himself at his own cost as per direction of Engineer-in-charge.
1389.18
-
-
... More
Water allowance to be allowed between 15 November to 31st May required for proper completion of the work as per direction of Engineer-in-Charge.
2008.63
-
-
... More
Providing and laying factory made chamfered edge cement concrete paver blocks (80mm thick M-40 grade) in footpath, park & lawns driveway or light & traffic parking etc. of required strength thickness and size/shape, made by table vibratory method using PU mould, laid in required color and pattern over 50mm thick compacted bad of coarse sand, compacting and prober embedding/ laying of interlocking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size & pattern, finishing & sweeping extra sand, all complete as per manufacture specifications & direction of Engineer-in-Charge.
16074.84
-
-
... More
Excavation in Foundation in ordinary soil (Loam clay, or sand) including lift upto 1.5meter and lead upto 30m. including filling, watering and ramming of excavated earth into the trenches or into the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M. (100fts) from the foundation trenches.
323.16
-
-
... More
Cement concrete with 4cm. gauge stone grit, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, T & P etc. required for proper completion of the work.
331.08
-
-
... More
Cement concrete with 2cm. gauge stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, T & P etc. required for proper completion of the work.
264.86
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements