Uttar Pradesh State Industrial Development Authority Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh State Industrial Development Authority - UPSIDA Tender
Pipes and Pipe Related Activities
Eprocure
Opening Date21 Sep 2021
Closing Date30 Sep 2021
Tender Amount₹ 2,89,66,640
Costs
EMD
₹ 5,79,332Document Cost
₹ 6,370Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_SIDC_622064_1Bid Award Id
ViewTender No
cd_8_20-dt_30062021Tender Authority
Uttar Pradesh State Industrial Development Authority ViewPurchaser Address
-Website
http://http://www.onlineupsidc.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing, Laying, Spreading and Compacting Graded Stone Aggregateto Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base/base course on well preapared surface and compacting with Vabratory Roller to achieve the desired Density and also supply of all material labour and T&P etc. as required for proper completion of the work.
1800
-
-
... More
Providing and laying 75 MM Bituminous Macadam with 100-120 TPH Hot Mix Plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with Bituminous binder @ 4.50% of the mix, trasported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clause 501.6 and 501.7 to achieve desired compaction, including supply of all material labour and T&P etc. as required for proper completion of the work including tack coat.
540
-
-
... More
Providing and applying tack coat with bitumin VG :-10, using pressure distributer at the rate of 0.20 Kg per SqM on the prepared Bituminous surface cleaned with mechanical brooms, including supply of all material labour and T&P etc. as required for proper completion of the work. MORTH Specification - 503
7200
-
-
... More
Providing and laying 40 MM thick Bituminous Concrete with 100-120 P TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with Bituminous binder @ 5.4 to 5.6% of the mix and filler, transportiong the hot mix to work site, laying with hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem roller, to achieve required compaction as per MORTH Specificatio Clause no. 509, including tack coat complete in all respect, including supply of all material labour and T&P etc. as required for proper completion of the work.
288
-
-
... More
Providing and laying hot applied thermoplastic compound 2.50 mm thick including reflactorising glass beads @ 2.50 gms per SqM area thickness of 2.50 mm is exclusive of surface applied glass beads as per IRC : 35. The finish surface is to be lavel, uniform and free from streacks and holes as per MORTH Specification no. 803.
540
-
-
... More
Brick on edge pavement on road patries with bricks laid dry joints filled with local sand including preparation of base to proper slope and its ramming, spreading a layer of 1.00 cm depth of local sand over a sub grade with S.O.B. including supply of all material, labour and T&P etc. required for proper completion of the work and as directed by the Engineer In charge.
1728
-
-
... More
Earth work in excavation in ordinary soil (loam, clay or sand) including lift up to 1.50 m and lead up to 30.00 m and also including filling watering and ramming of excavated earth into foundation trenches or into the space between building and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer Incharge up to a distance of 50.00 m from foundation trenches as required for proper completion of the work.
P.W.D. S.I. No. 251
2234.8
-
-
... More
Plain Cement Concrete with 40 mm gauge approved stone ballast, approved coarse sand and cement in the proportion of 10:5:1 including supply of all material, labour and T&P etc. required for proper completion of the work and as directed by the Engineer In charge.
P.W.D. S.I. No. 281(A)
197.28
-
-
... More
M-150 Brick work in 1:6 with cement and coarse sand mortar in foundation and plinth including supply of all material, labour and T&P etc. required for proper completion of the work and as directed by the Engineer In charge.
931.68
-
-
... More
25 mm thick 1:2:4 cement concrete floor with cement, approved coarse sand and approved 20 mm gauge stone grit laid in panels finished with 3 mm thick floating coat of neat cement or cement and marble dust ratio of 5:1 as specified without base concrete and removing any over lapping mortar at the joints of the panels if any and giving them a uniform finish including supply of all material, labour and T&P etc. required for proper completion of the work and as directed by the Engineer In charge.
864
-
-
... More
Struck Pointing with cement and sand of 1.50 F.M. mortar in 1:2 including supply of all material, labour and T&P etc. required for proper completion of the work and as directed by the Engineer In charge.
1008
-
-
... More
Flush Pointing with cement and sand of 1.50 F.M. mortar in 1:2 including supply of all material, labour and T&P etc. required for proper completion of the work and as directed by the Engineer In charge.
2448
-
-
... More
Dismantling sundried brick work/kharanja including stacking of dismantled materials as directed by the Engineer In charge with in a distance of 60 mt. (200 feet)&Deduct cost of bricks shall be issued by the department@Rs. 6.40/-
836.64
-
-
... More
Removing cement mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured.)
192427
-
-