Uttar Pradesh State Industrial Development Authority Tender
... More
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of etender.up.nic.in - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh State Industrial Development Authority - UPSIDA Tender
Road Construction
Eprocure
Opening Date26 Nov 2024
Closing DateCancelled
Tender Amount₹ 19,41,90,866
Costs
EMD
₹ 45,82,904Document Cost
₹ 8,850Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_SIDC_977466_1Tender No
CD-I(186) dated 22.11.2024Tender Authority
Uttar Pradesh State Industrial Development Authority ViewPurchaser Address
-Website
http://http://www.onlineupsidc.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Dismantling reinforced cement concrete of reinforced brick work including stacking of materials as directed by the engineer-in charge within a distance of 60M(200 Feet) Rate as per SoR Ghaziabad-2022, SI No.694
607.8
1340
-
... More
Excavation in foundation in ordinary soill ( Loam , clay or sand ) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplusearih asi directed by the Engineer - in - charge upto al distance of 30 M. from the foundation ( Where machine can not trenches . reach / move ) As per SI No. 251(A) SOR Ghaziabad.
5281.25
110
-
... More
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to and average of 22.5 cm depth dressing to camber and consolidation with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth lead upto 50 meters (DSR-21/16 1/P-262)
15200.55
93
-
... More
Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. As per MoRTH analysis Attached
5518.17
3957
-
... More
Providing and laying 100 mm thick factory made cement concrete interlocking Paving blocks of M 50 grade manufactured by block making machine equipped with steel mould clamped to a strong vibratory table with hydraulic pressure for compaction of concrete as per IRC SP 63 -2014 and of approved size and design / shape laid in Ordinary Grey Colour and pattern over and including 40 mm thick compacted bed of coarse sand, filling the joints with fine sand etc, all complete as per directions of Engineer-in-Charge.As per Job No. CD-I (19) Dated 13.04.2023
8298.72
940
-
... More
Earth work in cutting or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5 m lift and 30m lead. The earth in form of cutting to be used as spoil banks within 50m distance as directed by the Engineer-in- Charge. Lead Upto 10 Kms. As Per SI No. 253 + 281(C)+ 231(A)
2966.35
357
-
... More
S / L DLC as per MORTH Specification 601 C Item no 21.18 150 Kg cement / cum of concrete , coarse sand as per IS 383 @ 0.45 cum / cum of cocrete and Crushed stone coarse aggregate of 25 mm and 12.5 mm nominal sizes as per table 600.1 @ 0.9 cum / cum of concrete conforming to clause 602.2.6 he direction of engineer - in - charge .
5532.75
5206
-
... More
S / L of 150 micron polythene sheet for sepration layer between DLC & PQC
55327.5
20
-
... More
S / L PQC M - 40 grade of concrete as per MORTH Specification 602 C Item no 21.19 400 Kg cement / cum of concrete , coarse sand as per IS 383 conforming to clause 602.2.4 @ .45 cum / cum of cocrete and Crushed stone coarse aggregate of 25 mm and 12.5 mm nominal sizes @ 0.90 cum / cum of concrete conforming to clause 602.2.4 . Admixture @ 0.5 % of cement . The deviation of cement in design mix concrete may be paid or recover as case may be
14385.15
7923
-
... More
First class brick work in 1:6 Cement & Coarse sand 1.25 F.M. Mortar in foundation and plinth including supply of all material labour and T&P etc. required for proper completion of the work
1233.54
5010
-
... More
4.00 Cm thick D,.P.C with Cement and approved coarse sand 1:2 and including water proofing materials as approved by the Engineer in Charge in the proprortion as specified but the manufacture including supply of all material, labore T&P for proper completion of he work. Including proper curing and shuttering as necessary. As per SI No. 361(a) SOR Ghaziabad.
3234.26
525
-
... More
Dismantling of KERB Stone by manual means and disposal of unservicable material with all lift and upto a lead of 1.00 Km
200
27
-
... More
R.C.C. work with cement , approved coarse sand & 20mm approved stone ballast in proportion of 1 : 1.5 : 3 in T - beam & slabs roof and R.C.C Column . including aupply all supply materials but excluding reinforcement & its bending but including its fixing in position & binding the same with 24 BWG GI binding wire & including the cost of binding wire & including providing & fixing necessary centering & shuttering & its removal after completion of work & supply of all other materials , labour T & P etc.required . for proper completion of work . SI No. 287 ( A )
154
8100
-
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
7857.85
79
-
... More
12 mm thick plaster with cement and coarse sand of 2.20 fineness modules in 1:6 over brick work minimum thickness not to be less than 1 cm including supply of all materials, labour, Tools & Plants etc. required for proper completion of the work
1058
180
-
... More
Finishing wall with weather coat by premium acrylic exterior paint applied @ 1.67 ltr / 10 Sqm ( asian or Berger Brand ) of approved make and quality on wall with two or more coat to give an even shade including a priming coat with cement primer of approved brand and manufacturer exterior primer applied @ 2.20kg / 10 sqm after thoroughly brushing the surface free from mortar dropping and other foreign matters and sand papered smooth including supply of all materials , labour , Tools & Plants etc. required for proper completion of work . SI No.15.23
632.5
140
-
... More
Providing & Fixing of Stainless Steel( 304 Grade Board) frame with green color base & white color refelective letter as per design & drawing of Work Description board. (As per office order no. 1150 dated 16.09.2023) PGM Camp
2
42000
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements