If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh State Industrial Development Authority - UPSIDA Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date21 Jul 2023
Closing Date1 Aug 2023
Tender Amount₹ 3,80,70,859
Costs
EMD
₹ 7,61,418Document Cost
₹ 7,442Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_SIDC_823155_1Bid Award Id
ViewTender No
tgc_117_dt_19052023Tender Authority
Uttar Pradesh State Industrial Development Authority ViewPurchaser Address
-Website
http://http://www.onlineupsidc.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing and laying cement concrete 1:4:8 (1 cement, 4 coarse sand, 8 graded stone ballast 40 mm, nominal size) including supply of all materials labour and T&P etc. required for proper completion of the work and curing complete also including cost of form work in foundation & floors.
200.08
-
-
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge.
(Note :- Cement content considered in this item is @ 330 kg/cum.Excess/less cement
used as per design mix is payable/recoverable separately).
1148
-
-
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns etc for mass concrete including supply of all material labour, T&P etc. required for proper completion of the work.
325.92
-
-
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. including supply of all material labour T&P etc. required for proper completion of the work.
5984
-
-
Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landing, balconies and access platform, including supply of all material, labour, T&P etc. required for proper completion of the work.
1430.8
-
-
Centing and shuttering including strutting, propping etc. and removal of form for : Edges of slabs and breaks in floors and walls. Under 20 cm wide.
1516.6
-
-
Steel reinforcement for RCC work including straightening, cutting, bendring, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars including supply of all material labour, T&P etc. required for proper completion of the work.
1532.89
-
-
Supply & fixing of mild steel channel size 75x400x4.8 mm with carbon steel galvanized dash fastener of size 10 mm with double threaded 6.8 grade (yield strenght 480 N/MM sq.) counter sunk head comprising of 10 mm dia, MS plate size 120x120x6 mm angle iron support size 75x75x6mm, 10 mm dia angle / G.I.U bolt (3 Nos. bolt in 1 set) both side threaded with Nut & washer and providing holes on MS channel etc.(with one coat priming paint and two coat superior quality paint on MS channel, angle and plate) required for proper completion of the work including T&P men & material required at site, complete in all respect. (700 Mtr. length @ 2 Mtr. centre, total no. of holes required 700 /2+1 = 351 12 Nos. in each row hence total qty. = 12 x 351 = 4212 Nos.)
4212
-
-
Providing & Making 200 mm dia, 30 cm deep holes with core cutter in the raft of MEP trench to save the electric cable during rainy season. The excess water shall be percolated through hole etc. complete in all respect (700 / 25 + 1 = 29 Nos.) as per sanctioned Job no. ED-1(91) dated 10.12.2021
29
-
-
Providing and laying in position ready mixed M-30 Grade concretefor reinforced cement concerete work, using cement content as per approved design mix, manufactured in fully automate batching plant and transported to site of work in transit mixer for all leads having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of RMC from transit mixer to site of laying excluding the cost of centering, shuttering and finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/retard setting of concrete, improve workability without imparing strength and durability as per direction of the Engineer-in-charge, (Note:- Cement content considered in this item is @330 kg/cum. Excess less cement used as per design mix is payable/recoverable separately) 5.37.1 All works upto plinth level.
153.84
-
-
Finshing walls with premium Acrylic smooth exterior paint with silicone additives of required shade: New work (Two or more coats applied @ 1.43 ltr/10 sqm over and including primimg coat of exterior primer applied @ 2.20 kg/10 sqm)
34.68
-
-