Uttar Pradesh State Industrial Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh State Industrial Development Authority - UPSIDA Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date5 Jun 2023
Closing Date22 Jun 2023
Tender Amount₹ 3,42,07,368 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Consolidation of 10cm thick (loose) coat of stone ballast including opening out stacking sorting stone ballast in existing road surface water and ramming and also including carriage of metal upto 3.7 mtr. carriage of water 200 mtr. Supply and maintenance of barries and all T&P reqiured for proper completion of the work , stone ballast to be supplies to the contractor free at site.

642.6

-

-

... More
Water allowance of allow on item given below for consolidaton between 15th November to 31st May.

642.6

-

-

... More
Cement Concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & plants etc reguired for proper complection of the work.

856.8

-

-

... More
Cement Concrete with 2 cm gauge approved stone ballast coarse sand & cement in the proportion of 1:2:4 including supply of all materials labour tools & plants etc reguired for proper complection of the work.

59.85

-

-

... More
Providing and laying separation memebrane of impermeable plastic sheeting 125 micron thick including over lapps not less than 300mm etc. complete.

7995

-

-

... More
Providing and laying in position ready mixed or site batched] design mix cement concrete for reinforced cement concrete work, using coarse aggregate ans fine aggregate derived from natural sources, Portland Pozzoland/Ordinary Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate/retard setting of concrete, to improve durability and workability without impairing strength, including pumping of concrete to site of laying, curing carriage for all leads, but excluding the cost of centring. shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in desing mix shall be payable seperately. In case the cement content in dasing mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re desing the mix or bear the cost of extra cement. all works upto plinth level concrete of M40 graded with minimum cement content of 390 kg/cum

2038.73

-

-

... More
Providing and laying in position bitumen sealing depth per cm width compound for expansion joints etc. Using grade 'A' sealing compound. per cm

2484

-

-

... More
Filling the gap in between aluminium frame & adjacent RCC/ Brick/ Stone work by providing weather silicon sealant over backer rod of approved quality as per architectural drawings and direction of Engineer-in-charge. Up to 5mm depth and 5 mm width

18102

-

-

... More
Providing and fixing in position mild steel dowel bars precoated with anticorrosive epoxy paint of 32mm dia 50cm long and at 30.0 cm c/c/ & whereve directed including handling, straightening, necessary cutting supported by HYSD chairs with proper aligement by using properly lubricating half leangth with bituminous paint as directed etc. complete including cost of anticorrosive epoxy paint, bituminous paint sleeves etc. 32mm dia 0.50m @ 6.30 Kg/RM= 3.15 Kg @ Rs. 68.10/ KG Dowel bars 32mm dia transverse @ 300mm C/C

5271

-

-

... More
Steel reinforcement for R.C.C. work! including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Tie bars Thermo-Mechanically treated bars

1230

-

-

... More
Steel reinforcement for R.C.C. work including straightening, cutting, ending, placing in position and binding all complete up to plith level. Thermo-mechanically Treated bars for route makers

7980.05

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.