Uttar Pradesh State Industrial Development Authority Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh State Industrial Development Authority - UPSIDA Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date21 Feb 2023
Closing Date28 Feb 2023
Tender Amount₹ 3,32,83,654 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Consolidation of 45-63 mm gauge hard stone ballast for 10cm (loose) thick inter coat by road roller including hire and fuel charges of road roller excluding cost of stone ballast but including opening out stacks, sorting ballast into different sizes spreading making medhi to retain water also including labour for spraying screening material to be used for blinding purpose and also including cost of carriage of materials & water and T & P etc. required for proper completion of the work water for consolidation to be arranged by the contractor himself at his own cost as per direction of Engineer-in-charge.

69.26

-

-

... More
Consolidation of 22.4-53 mm gauge hard stone ballast for 10cm (loose) thick top coat by road roller including hire and fuel charges of road roller excluding cost of stone ballast but including opening out stacks, sorting ballast into different sizes spreading making medhi to retain water also including labour for spraying screening material to be used for blinding purpose and also including cost of carriage of materials & water and T & P etc. required for proper completion of the work water for consolidation to be arranged by the contractor himself at his own cost as per direction of Engineer-in-charge.

785.55

-

-

... More
Water allowance to be allowed between 15 November to 31st May required for proper completion of the work as per direction of Engineer-in-Charge.

854.81

-

-

... More
Providing and applying primer coat with VG-10 bitumen on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. As per morth SI no 502

19524.5

-

-

... More
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 percent by weight of total mix and filler, transporting the hot mix to wark site, laying with a hydrostatic paver finisher with sensor control to the required grade level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 505 complete in all respects.

976.23

-

-

... More
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading. gremied with bituminous binder @ 5.4 percent of mix and filler,transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H specification clause No. 507 complee in all respects. Unit = Cum/Sqm including tack coat using bitumin @ .20kg per Sqm.

19524.5

-

-

... More
Excavation in Foundation in ordinary soil (Loam clay, or sand) including lift upto 1.5meter and lead upto 30m. including filling, watering and ramming of excavated earth into the trenches or into the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M. (100fts) from the foundation trenches.

1191.4

-

-

... More
Same as above item No. 10 but for 1 extra lead & lift.

64.25

-

-

... More
Concrete with 4cm gauge stone ballast, coarse sand & cement in poroportion of 8:4:1 (8 graded stone aggregate: 4 coarse sand : 1cement : ) including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge.

90.56

-

-

... More
R.C.C. work with cement, approved coarse sand & 2cm gauge approved stone grit in proportion of 1:1.5:3 in slabs and Raft foundation and wall excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc and also including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge.

243.61

-

-

... More
M.S. (tor Steel or plain) in Plain work such as R.C.C. work including beding for proper shape as necessary including bending for proper complition of the work and including supply of all material and wastage, bend hooks, and authorised overlapping shall be measured labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. Work Including cost of binding wire

29149

-

-

... More
M-150 Brick work in 1:3 one cement : 3 coarse sand mortar in foundation & plinth including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge.

112.39

-

-

... More
4cm thick 1:2:4 plain cement concrete floor with cement approved coarse sand & 2cm approved stone grit including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge.

29

-

-

... More
Concrete with 2cm gauge stone grit , coarse and cement in proportion of 4:2:1 including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge.

5.6

-

-

... More
Struck pointing with cement mortar consisting of 1 part cement and 2 part of fine sand of 1.25 fineness modulus including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge.

22.6

-

-

... More
Flush pointing with cement mortar consisting of 1 part cement and 2 part of fine sand of 1.25 fineness modulus including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge.

54.2

-

-

... More
Finishing wall with water proof cement paint of approved make on new work with three coats to give an even shade including supply of all materials, labour, and T&P etc. required for proper completion of the work.

22.6

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.