Uttar Pradesh State Bridge Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh State Bridge Corporation Limited - UPSBC Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date2 Nov 2023
Closing Date23 Nov 2023
Tender Amount₹ 2,14,29,000
Costs
EMD
₹ 12,75,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Summary
Construction Of Approach Road And Protection Work Jalaun
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_UPSBC_858377_1Bid Award Id
ViewTender No
1404/ET/CPM(Agra)/2023-24 Dated 31.10.2023Tender Authority
Uttar Pradesh State Bridge Corporation Limited ViewPurchaser Address
-Website
http://https://bridgecorporationltd.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Dry Lean Cement Concrete Sub- base: Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. (MoRT&H Item No. 6.1)
570
-
-
Cement Concrete Pavement: Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing (MoRT&H Item No. 6.2)
1050
-
-
Cobstruction of K.C. Type Side Drain
800
-
-
Cobstruction of Chute Drain
230
-
-
PROTECTION WORK
-
-
-
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specification (MoRT&H Item No. 15.5)
540
-
-
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications (MoRT&H Item No. 15.4)
1080
-
-
Earth Work in Excavation.for boulder Apron in soil by mechanical means including cutting & pushing the earth to site of embankment upto a distance of 100m (Average Lead 50m) including trimming bottom & side slopes & accordance with requirements of lines, grade & cross sections
193.2
-
-
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. (MoRT&H Item No. 15.1)
386.4
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements