Uttar Pradesh State Bridge Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh State Bridge Corporation Limited - UPSBC Tender
Bridge Construction
Civil And Construction
Eprocure
Opening Date10 Oct 2024
Closing Date4 Nov 2024
Tender Amount₹ 10,23,58,000
Costs
EMD
₹ 20,47,000Document Cost
₹ 20,000Tender Fee
₹ 20,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPSBC_964349_1Bid Award Id
ViewTender No
101/19MBD/GMBLY/CAMPLKO/24Tender Authority
Uttar Pradesh State Bridge Corporation Limited ViewPurchaser Address
-Website
http://https://bridgecorporationltd.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and constructing one span Service Road to reach island location from one pier location to another pier location. Assuming span length 30 m, width of service road 10m and depth of water 1m
30.23
-
-
... More
Providing and constructing one span Service Road to reach island location from one pier location to another pier location. Assuming span length 30 m, width of service road 10m and depth of water 1m
30.23
-
-
... More
Providing and Laying Cutting Edge of Mild Steel weighing 40 kg per metre for Well Foundation complete as per Drawing and Technical Specification.
3.31
-
-
... More
Reinforced Cement Concrete, in Well Foundation complete as per Drawing and Technical Specification in Well Curb
73.15
-
-
... More
Reinforced Cement Concrete, in Well Foundation complete as per Drawing and Technical Specification in Well Steining
1266.56
-
-
... More
Reinforced Cement Concrete, in Well Foundation complete as per Drawing and Technical Specification in False Stenning
22.06
-
-
... More
Plain Cement Concrete, in Well Foundation complete as per Drawing and Technical Specification in Bottom Plugging
226.55
-
-
... More
Plain Cement Concrete, in Well Foundation complete as per Drawing and Technical Specification Intermediate Plugging
16.63
-
-
... More
Plain/Reinforced Cement Concrete, in Well Foundation complete as per Drawing and Technical Specification in Well Cap
122.53
-
-
... More
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
73.56
-
-
... More
Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level.
-
-
-
... More
Depth below bed level upto 3.0 M
12
-
-
... More
Beyond 3m upto 10m depth
28
-
-
... More
Beyond 10m upto 20m
40
-
-
... More
Beyond 20m upto 30 m
20
-
-
... More
Negative Sinking
8
-
-
... More
Sand filling in wells complete as per drawing and technical specifications.
500.84
-
-
... More
Sub Structure
-
-
-
... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications
-
-
-
... More
Pier M-35
25.29
-
-
... More
Abutment column M-35
13.09
-
-
... More
Pier cap M-35
54.5
-
-
... More
Top beam M-35
25.18
-
-
... More
Pedestal M-35
3.11
-
-
... More
Seismic arrester M-35
3.78
-
-
... More
Back wall , wing wall & Parapet M-35
31.24
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
28.31
-
-
... More
Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, complete assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete as per drawing and approved Technical Specifications.
18
-
-
... More
Super Structure
-
-
-
... More
PSC Main Beam M-40
218.53
-
-
... More
RCC in deck slab M-40
177.35
-
-
... More
RCC in cross beam M-40
27
-
-
... More
Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-20 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified including steel.
180.46
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
88.66
-
-
... More
High tensile steel wires/strands including all accessories for stressing, stressing operations and grouting complete as per drawing and Technical Specifications
13.5
-
-
... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
50.75
-
-
... More
Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.
30
-
-
... More
Drainage Spouts complete as per drawing and Technical specification
15
-
-
... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification
5.95
-
-
... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification M-30
17.85
-
-
... More
Crash Barrier Pipe Railing
180.5
-
-
... More
Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm.
216.55
-
-
... More
Other Work
-
-
-
... More
Pile bridge
100
-
-
... More
Approach Road
-
-
-
... More
Earth work in cutting or in Embankment in ordinary soil, excavation to be in the regular pits not exceeding 0.5 m in depth and earthwork in embankment to be in 20 cm layers, including, ramming and dessing the surface to required levels, & slopes & also including 1.50 m lift & 30 m lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30 m distance as directed by the engineer-in-charge.
41415.84
-
-
... More
Construction of Cement Treated Sub Base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401
300
-
-
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to Cement Treated Base specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. Grading 2 as per technical specification.
300
-
-
... More
Providing and applying Tack Coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.35 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
2800
-
-
... More
Providing, laying and rolling of open - graded Premix Surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades.
2800
-
-
... More
Providing and laying Seal Coat by manual means with 80-100 grade bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A and B seal coats.
2800
-
-
... More
Bricks (S.O.B.) on edge pavement on, patries laid and dry, joints filled with local sand including preparation of base to proper slope & its ramming, Spreading layer of 1 cm (3/8") depth of local sand over the sub-grade and including supply of all materials labour and T&P etc. required for proper completion of the work.
800
-
-
... More
Laying of the Thermo Plastic Paint Strips
114.22
-
-
... More
Metal Beam Crash Barrier
Type - A, "W" : Metal Beam Crash Barrier
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810
500
-
-
... More
6m Span over head cantilver structure with 300 mm dia MS one vertical post
Supply, fixing & eraction of built up cantilever structure 6m span comprising of one vertical posts of 6.00 M height made up of 300 mm NB heavy class MS pipe as vertical member welded with 10mm MS plate at top & 12 mm M.S. Plate at bottom. The horizontal truss shall comprise of 50 mm dia heavy class M.S. Pipe and 40 mm dia heavy M.S. Pipe as bracing & 10 mm MS plae at bottom for fixing to verticial post as per structure design & drawing with one of steel primer and two coats of synthetic enamel paint. The work includes constructin of RCC foundation of size 0.90x0.90x1.50 m of required depth as per site condition for built up structure including earth work in excavation 100 m thick lean concrete in 1:3:6 cement coarse sand and 40 mm gauge stone ballast. RCC with and 1:2:4 cement coarse sand and 20 mm stone grit including supply and fixing of 25 mm dia foundation bolts 600 mm long as per provision of structure design including cost of reinforcement & shuttering. The lateral vertical clearancess and complete. Installation work shall be as per relevant clauses of MORTH specification section 800 and IRC 67 2010 complete in all respect the rates shall include cost of design fabrication, supply, transportation, local shifting erection of signage structure using crane, inclusive of all taxes etc. all T & P machine, material and labour required for proper completion of work as per direction of Engineer-in-charge.
2
-
-
... More
Retro reflective signs for both side
Proving and fixing retro reflective signboards comprising of customised modular PU Epoxy coated MS angle iron frame work, almunium composite panel (ACP) as base board, mirco prismatic retro-reflective sheet and electro cut coloured overlay film/latex printing. The horizontal and vertical members including inclined outer members of the MS frame module shall be made of pair MS angle iron. No panel size shall be more than one Spm. and each panel shall be braced diagonally (one way only) with MS angle. The MS frame module shall have length not more than 3 mtr. The aluminium composite panel (ACP) shall have a thickness of 4mm with 0.5 mm thick skin of aluminium on both sides. The ACP shall be fixed on the MS frame with pop riveting of with self taping SS screws 5mm dis spaced not more than 300 mm centre to centre ensuring that no riveting is seen on either face of the frame. On the front visible face of the ACP, micro prismatic retro-reflective sheet conforming to Type-IV of ASTM : D 4956-09 shall be pressure fixed. The retro reflective sheeting shall be tested for 3 year outdoor weathering test in indian conditions as per IRC 67:2012 & proof of the same in form of government report shall be uploaded while quoting tender. The rate shall include all materials, labour, equipments, fabrication, transportation, erection, installlation and incidentals all complete as per direction fo the Engineer-in-charge.
=6.10 x 1.80 x 2
21.96
-
-
... More
Reflective Raised Pavement Mrakers
(Road Studs/ Cay Eye)
1390
-
-
... More
Additional Approach Road
-
-
-
... More
Earth work in cutting or in Embankment in ordinary soil, excavation to be in the regular pits not exceeding 0.5 m in depth and earthwork in embankment to be in 20 cm layers, including, ramming and dessing the surface to required levels, & slopes & also including 1.50 m lift & 30 m lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30 m distance as directed by the engineer-in-charge.
48132.06
-
-
... More
Construction of Cement Treated Sub Base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401
358.43
-
-
... More
Providing, laying, spreading and compacting stone aggregates of specific sizes to Cement Treated Base specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. Grading 2 as per technical specification.
331.88
-
-
... More
Providing and applying Tack Coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.35 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
3318.75
-
-
... More
Providing, laying and rolling of Open - Graded Premix Surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades.
3318.75
-
-
... More
Providing and laying Seal Coat by manual means with 80-100 grade bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A and B seal coats.
3318.75
-
-
... More
Brick on end edging along apron etc a width of 7.5 cm laid dry including labour and supply of brick finished to required level and proper alignement and also including and ramming and cressing the excavated earth as per direction of the Enginner-in-charge.
885
-
-
... More
Protection Work
-
-
-
... More
Earth work in cutting or in embankment in ordinary soil, excavation to be in the regular pits not exceeding 0.5m in depth and earthwork in embankment to be in 20cm. layers, including ramming and dessing the surface to required levels & slopes & also including 1.5 lift & 30m. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks within 30m. Distance as directed by the enginee incharge (Including Royalty). S.I. 253
2447.05
-
-
... More
Providing and laying of Boulder Apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each.
412.11
-
-
... More
Providing and laying filter media under pitching laid dry in front of toe of embankment complete as per drawing and technical specifications.
436.63
-
-
... More
Providing and laying stone boulder pitching using 25-60 kg stone boulder on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specifications (MORT&H Specification no 2504)
873.26
-
-
... More
Providing & Laying boulder in Toe Wall for river bed protection.
695.88
-
-
... More
Construction of K.C. Drain
800
-
-
... More
Construction of Chute Drains
160
-
-
Evaluation Notes How It Works ?
Potential Partner