Uttar Pradesh State Agro Industrial Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh State Agro Industrial Corporation Limited - UPAGRO Tender
Eprocure
Opening Date10 Feb 2024
Closing Date2 Mar 2024
Tender Amount₹ 75,00,000 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 1,50,000Document Cost
₹ 1,800Tender Fee
Refer Documents
Summary
Supply Installation Construction Of Ro Plant, Submersible Pump, Boundary Wall, Leveling Of Ground, Desk Bench Furniture And High Mast Light Work
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UPAGR_893929_1Bid Award Id
ViewTender No
203/E.T./2023-24 Dated 09.02.2024Tender Authority
Uttar Pradesh State Agro Industrial Corporation Limited ViewPurchaser Address
-Website
http://http://upagro.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Electric fitting with 4mm autowire with ISI 25Amp. M.C.B. & Juction Box.for proper completion of work.
1
-
-
... More
Supply,Laying & jionting of 25mm sch class 40 upvc for connection from existing tank outlet to water tank inlet & tank to RO plant including supply of all jointting materials, labour T&P etc. Complete.
45
-
-
... More
Shelter work
-
-
-
... More
Excavation in Foundation for structure as per dwaring in ordinarysoil (loam Clay or sand) including lift up to 1.5 mtr. & lead upto 30 mtr. & including filling, watering and ramming of excavated earth into the trenches or in to space between the building and the sidding of foundation trenches or in to plinth and removale and disposal of surplus earth as directed by the engineer in charge of 30 mtr. from the foundation trenches.
3.89
-
-
... More
Providing and laying cement concrete 1:5:10 (1 Cement :5 C/Sand : 10Stone Graded agg. 40mm nominal )and curing complete
0.32
-
-
... More
R.C.C. work with cement, approved corse sand and 20 mm gauge stone grit in proportion of 1:1.5:3 in excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials. labour T&P etc. required for the proper completion of work.including the cost.
0.59
-
-
... More
M.S.(tor steel and plain) in plain work such as R.C.C. or R.B. work including for proper shape and including supply of steel & its wastage bend,hooks and authorised overlaping shall be measure and including cost of binding wire.
0.56
-
-
... More
Steel work in built up tubular ( round, square or rectanglar hollow tubes etc. ) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.
413
-
-
... More
Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 1.00mm thick with zinc coating not less than 275gm/sqm.....
59.76
-
-
... More
Painting 1st coat over priming coat (but excluding cost of priming coat) on steel and other metal surfaces upto 10cm width or girth or small articles not exceeding 0.10 Sq.M. in area with superior synthetic enamel such as Luxol 3, Hi gloss Apcolite, Superlac, Dulux specified brushing to give and even shade and including the cleaning the surface of all dirt, dust and other foreign matter sand papering and scrapping including cost of all materials, labour, tools and plants etc. required for proper completion of work.
1
-
-
... More
Installation of Submercible Pump & Construction of Boaring Work.
-
-
-
... More
Transportation of Boaring Material Submersible Pump,P-Grevel, Vintonite Powder, PVC Pipe, Boaring Machine etc.
100
-
-
... More
150mm dia deep Boaring by deep bore machine.
-
-
-
... More
0-15
15
-
-
... More
16-30
15
-
-
... More
31-45
15
-
-
... More
46-70
25
-
-
... More
Supply of 125mm PVC Pipe. ( 8Kg. )
70
-
-
... More
Supply of 32mm UPVC Column Pipe ISI Mark.(3mtr)
45
-
-
... More
Supply of Submercible Pump 1.50 HP ISI mark.
1
-
-
... More
Supply of Starter with Pannel Board.
1
-
-
... More
Supply of 4mm Cable.
70
-
-
... More
Supply of Pea-Gravel.
0.65
-
-
... More
Supply of Vitonite Powder.
4
-
-
... More
Water arrangement for boaring.
5
-
-
... More
Installation of submersible pump over the bore hole as per instruction of the engineer incharge or his authorised representetive including all labour pipe jointing material T&P etc. Required for proper completion (including 32mm UPVC pipe)
70
-
-
... More
Threading in PVC Pipe.
1
-
-
... More
Generator for Cleaning of boaring.
1
-
-
... More
Supply of cable for electric connection.
15
-
-
... More
Supply of 32mm CPVC Pipe ISI Mark Fitting.
4
-
-
... More
Floor Work
-
-
-
... More
Excavation in Foundation for structure as per dwaring in ordinarysoil (loam Clay or sand) including lift up to 1.5 mtr. & lead upto 30 mtr. & including filling, watering and ramming of excavated earth into the trenches or in to space between the building and the sidding of foundation trenches or in to plinth and removale and disposal of surplus earth as directed by the engineer in charge of 30 mtr. from the foundation trenches.
5.4
-
-
... More
Earth filling in plinth including supplly of necessary quantity of each. Including watering, ramming and dressing etc. rate to including cost of earth (from a distane of 5 Km) labour and T&P etc.required for proper completion of work (as per analysis)(S.I. No. 231A)
4.88
-
-
... More
Providing and laying cement concrete 1:5:10 (1 Cement :5 C/Sand : 10Stone Graded agg. 40mm nominal )and curing complete
2.3
-
-
... More
M 150 Brick work in 1:6 cement and coarse sand mortar in foundation and plinth including supply of all materials labour T & P etc. required for proper completion of the work.
3.46
-
-
... More
12 mm thick Cement plaster on fair side of wall in single coat in 1:6 cement and coarse sand including supply of all materials and labour and T&P etc. required for proper completion of work.
9
-
-
... More
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate
18.36
-
-
... More
Soak Pit work
-
-
-
... More
Earth work in Excavation in Fdn. In ordinary Soil. S.I. No. 251
6
-
-
... More
P/laying in Cement Concrete in 1:5:10 with Cement,C/Sand & 40mm gauge stone Ballast.s.i no 4.1
0.12
-
-
... More
M-150 Brick Work in 1:6 with Cement & C/Sand Mortar in Foundation.S.I.No.6.1
4.17
-
-
... More
Dry Brick Ballast
0.11
-
-
... More
12mm thick Cement plaster in 1:4 with Cement & C/Sand mortar.S.I.No.13.4
8.4
-
-
... More
R.C.C. in 1:2:4 with Cement,C/Sand & 20mm gauge stone grite.S.I.No.5.1.3
0.2
-
-
... More
M.S. Iron in reinforcement in R.C.C. work .
0.24
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements