Uttar Pradesh Small Industries Corporation Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Small Industries Corporation Limited Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date14 Dec 2024
Closing Soon28 Dec 2024
Tender Amount₹ 41,19,220 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
MS or iron work in plain work such as reinforced concrete wrought to required shape as necessary including bending for proper completion of the work. A/R

40.04

7283

291648.45

... More
CONSTRUCTION OF PARK B/WALL

-

-

-

... More
Earth work cutting or filling in ordinary soil including 5.00 km cartage at site as per A/R Park(76.20X45.72)

696.77

264

183947.28

... More
Excavation in foundation in ordinary soil including lift upto 1.5 m & lead upto 30m. etc all complete. DAR 2.6.1

164.64

125

20580

... More
Concrete with 4cm. Gauge Stone ballast , fine sand of 1.25 F.M. and cement in proportion of 1:4:8 in foundation & under floors , including supply of All matrials , labour , T & P. etc required for proper completion of work. SOR 4.1.8

32.92

5990

197190.8

... More
M-150 Class Brick Work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all matrials , labour ,T &P etc required for proper completion of work. SOR 6.1.1

40.95

6267

256633.65

... More
M-150 Class Brick Work 1:4 cement and coarse sand mortar in superstructure …… complete item. SOR 6.4.1

77.06

6949

535489.94

... More
RCC work 1:1.5:3 upto plinth level….. Complete item. SOR.5.1.2

21.99

8120

178558.8

... More
RCC work 1:1.5:3 Above plinth level….. Complete item. SOR.5.2.2

12.1

8797

106443.7

... More
M.S. or iron work in plain work such as reinforcement.A/R

34.05

7283

248017.72

... More
12 mm thick plaster 1:3 cement & C. sand morter. SI No. 13.7.1

833.49

218

181700.82

... More
Finishing wall with three coat water proof cement paint SI No.660+661

833.49

88

73347.12

... More
Providing & fixing of M.S. Gate. A/R

0.53

7402

3923.28

... More
Supply and fixing of MS grill.PWD-10.25.2

2606.99

96

250271.04

... More
Painting two coats over priming coat including cost of priming coat on steel and other metal surfaces including supply of all materials , labour Tools & Plants etc. required for proper completion of the workSI NO.641+642

172.75

107

18484.25

... More
CONST. OF MAIN GATE

-

-

-

... More
Excavation in foundation in ordinary soil including lift upto 1.5 m & lead upto 30m. etc all complete. SOR-2.6.1

5.4

125

675

... More
Concrete with 4cm. Gauge Brick ballast , fine sand of 1.25 F.M. and cement in proportion of 1:6:12 in foundation & under floors , including supply of All matrials , labour , T & P. etc required for proper completion of work. SI No.273

0.68

4500

3060

... More
RCC work 1:1.5:3 upto plinth level….. Complete item. SOR.5.1.2

1.91

8120

15509.2

... More
RCC work 1:1.5:3 Above plinth level….. Complete item. SOR.5.2.2

3.28

8797

28854.16

... More
M.S. or iron work in plain work such as reinforcement.A/R

5.36

7283

39041.86

... More
12 mm thick plaster 1:3 cement & C. sand morter. SI No.13.7.1

16.63

218

3625.34

... More
Finishing wall with three coat water proof cement paint SI No.660+661

16.63

88

1463.44

... More
Providing & fixing of M.S. Gate. A/R

7.5

7402

55518.13

... More
Painting two coats over priming coat including cost of priming coat on steel and other metal surfaces including supply of all materials , labour Tools & Plants etc. required for proper completion of the workSI NO.641+642

30

107

3210

... More
CONST. OF INTERLOCKING ROAD(PATHWAYS)

-

-

-

... More
Clearing of jungle including uprooting of rank,vegetation ,grass Bush ,wood,tree and sapling of girth upto 30cm meaured at height of 1m above ground level and removal of rubbish upto a distance of 50m….complete item .CHAPTER-4(DAR)-2.31

3483.86

6

20903.16

... More
Excavation in foundation in ordinary soil including lift upto 1.5 m & lead upto 30m. etc all complete. DAR 2.6.1

14.37

125

1796.25

... More
Concrete with 4cm. Gauge Brick ballast , fine sand of 1.25 F.M. and cement in proportion of 1:6:12 in foundation & under floors , including supply of All matrials , labour , T & P. etc required for proper completion of work. SI No.273

7.18

4500

32310

... More
M-150 Class Brick Work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all matrials , labour ,T &P etc required for proper completion of work. SOR 6.1.1

14.69

6267

92062.23

... More
Construction of granular sub-base by providing coarse graded material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 401.A/R

36.13

3247

117335.79

... More
Providing and laying of interlocking concrete block payment of grade M-30 having thickness 80 mm and including 25mm local send cushion below interlocking block as per drawing and technical specification clause 1504 (Excluding G.S.B.).Chapter-17

481.69

950

457605.5

... More
25mm Cement concrete flooring 12:4 (1 cement 2 coarse sand 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc complete.

73.43

422

30987.46

... More
12 mm thick plaster 1:4 cement & C. sand morter. SI No.13.1.1

63.86

168

10728.48

... More
Supply/Fixing of R.C.C. Bench……….complete. (M/R)

6

8000

48000

... More
PLANTATIONS

-

-

-

... More
Horticulture operation excluding 30cm earth filling, grassing, tree plantation/shrubs and potted plants etc.PWD (ANALYSIS)

3002.17

144

432313.06

... More
Electrification Work

1

50000

50000

... More
Less 5% Department charge

1

216801

-216801.28



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.