Uttar Pradesh Small Industries Corporation Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Small Industries Corporation Limited Tender
Civil And Construction
Road Construction
Eprocure
Opening Date1 Jul 2024
Closing DateCancelled
Tender AmountRefer Documents
Costs
EMD
₹ 2,600Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_MSME_934456_22Tender No
168/UPSIC/KNP/24-25Tender Authority
Uttar Pradesh Small Industries Corporation Limited ViewPurchaser Address
-Website
http://http://www.upmsme.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
M-150 brickwork in 1:6 cement and fine sand mortor including cost of material , labour, T&P complete
1.6
8480
5300
2.5cm thick D.P.C. in 1:1.5:3 cement C. sand and 13mm stone grit and waterproofing material complete
4.17
959
230
M-150 brickwork in 1:6 cement and fine sand mortor including cost of material , labour, T&P complete in super structure
13.96
77338
5540
R.C.C . Work in cement coarse sand and 20mm gauge stone gride in proportion 1:1.5:3 in lintel T-beam, slab excluding supply of reinforcement and also including supply of all material labour T&P centering and shuttering etc. Lintel
5.85
43875
7500
M.S. Work in R.C.C. Incluing supply of steel its wastage and hooks and authorised overlap (S No 3+8A)
11.09
97181
8763
S/F M.S Fan box with 12mm Ms bar
4
600
150
Earth work in filling by cartage of earth from 1.00km by tractor trolly.
13.8
2815
204
12mm thick plaster work in 1:4cement and fine sand mortor
158.84
21443
135
Stone dust filling under floor
2.7
3334
1235
5cm thick CC floor in 1:1.5:3 cement c sand and 20mm stone grit in panells finished by 3mm floating coat of neat cement without 3inch thick base concrete in 1:4:8 cement c sand and 40mm brick ballast
27
9180
340
P/ applying white cemnent based putty of avg. thickness 1mm of appd. Brand over the plastered wall surface to prepare to surface even and smooth
198.46
22822
115
finishing wall tex tured exterior paint of required shad : new work ( two or more coat) @3.28ltr /10sqm over and including priming coat of exterior primer applied @2.20kg /10sqm
198.46
27784
140
S/f of m.s. angle iron chaukhat40x40x6 mm
84
5544
66
S/F m.s. angle iron window grill , including all fitting and proper locking arangement (as per local market rate )
63.36
4055
64
S/f of 35mm thick Sitapur com. Quality ply wood shutters SI NO 470 A
7.92
15048
1900
S/f of oxidise iron fitting
7.92
2851
360
painting on new iron work in small areas with one coat of readymix priming coat and three coat of readymix paint appd. Brand as per SI. No. :- 641+642
22.86
2011
88
S/f 5.5mm thick glass strip 3.50cm depth in flour
67.5
1417
21
Rough cost plaster with 1:2 cement and c sand mortor com.in all respect
39.61
8912
225
laying of PCC in 1:4:8 cement c sand and 40mm stone ballast including cost of material labour T&P etc
2.7
11340
4200
site clearence before and after completion the work
1
1500
1500
imformation board + photography
1
6500
6500
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements