Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited Tender

If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search &amp; bid for etender UP.

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited - UPRVUNL Tender

Works
Energy, Oil and Gas
Electrical and Electronics
Electrical Works
Eprocure
Opening Date10 Aug 2024
Closing Date22 Oct 2024
Tender Amount₹ 9,49,08,050 
Notes
Download

Costs

Summary

Round The Clock Routine, Preventive And Breakdown Maintenance Of Entire Electrical And Candi Systems Of Main Plant And Offsite Areas (bop) Excluding Chp Along With Engagement Of Electrical Field Operation Assistance (operator Shift) Of 1x 660mw

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laying of GI pipes and GI/PVC/flexible conduits

310

-

-

... More
Battening/ casing capping on wall

300

-

-

... More
Laying of PVC flexible single core wires

1000

-

-

... More
Laying of power / control cables of dia. up to 10 mm

1000

-

-

... More
Laying of power / control cables of dia. above 10 mm. And up to 40 mm

1000

-

-

... More
Laying of power / control cables of dia. above 40 mm. And up to 80 mm

1000

-

-

... More
Excavation of trench

240

-

-

... More
Jointing and end termination of control cables of all sizes

32

-

-

... More
Jointing and end termination of LT power cables of all sizes

53

-

-

... More
Up-keeping of various cable galleries /trenches and racks

600

-

-

... More
Circuit identification / labelling on panels / equipments by Painting background with two or more coats on new work with synthetic enamel paint of approved brand and manufacture to give an even shade and lettering with black Japan paint of approved brand and manufacture

18000

-

-

... More
Fabrication & fixing of canopy (size up to 0.5 sq. metre)

60

-

-

... More
Shift maintenance of lighting and welding network (consisting of one gang of one skilled electrician and one un-skilled helper)

1460

-

-

... More
Maintenance of light fittings and associated equipments

2750

-

-

... More
Maintenance of fans and associated fixtures

180

-

-

... More
Overhauling of lighting panels

50

-

-

... More
Maintenance of LED based aviation obstruction light fitting (up to 275 metre height)

30

-

-

... More
Installation of TL/ GLS / CFL / LED/ HPSV/ halogen lamp fittings (up to 70W)

900

-

-

... More
Installation of HPSV / MH / LED lamp fittings (above 70W)

250

-

-

... More
Installation of single-phase office and industrial equipments

150

-

-

... More
Jointing and end termination of HT power cables of all sizes

40

-

-

... More
Painting of street light poles

100

-

-

... More
Painting of various types of panels / equipments

600

-

-

... More
Fabrication & fixing of canopy (size 0.5 sq. metre. & up to 1 sq. metre.)

20

-

-

... More
Providing & Fixing of 40Watt LED Bulb E27 BASE Warm Yellow

200

-

-

... More
Providing & Fixing of 20Watt 4 feet LED Batten type tubelight

100

-

-

... More
Providing & Fixing of 10Watt 2 feet LED Batten type tubelight

50

-

-

... More
Providing & Fixing of 70Watt Wellglass LED light

100

-

-

... More
Providing & Fixing of Single pole 20Amp MCB

100

-

-

... More
Providing & Fixing of Double pole 32Amp MCB

50

-

-

... More
Providing & Fixing of Four pole 63Amp MCB

50

-

-

... More
Providing & Fixing of Four pole 125 Amp MCB

20

-

-

... More
Cutting of Tree Branches over 11KV AWRS Overhead Lines at outside of Plant Premises.

12

-

-

... More
Shifting of Transformers from AWRS Site to Plant and Plant to AWRS Site during break downs.

2

-

-

... More
Complete overhauling & servicing of 11 KV TPMO Of AWRS Overhead Lines.

16

-

-

... More
PART-B: MAINTENANCE OF LT MOTORS

-

-

-

... More
LT MOTOR (=2.2KW) Attend Defect

85

-

-

... More
LT MOTOR (2.2-5.5KW) Attend Defect

33

-

-

... More
LT MOTOR (5.5-18.5KW) Attend Defect

55

-

-

... More
LT MOTOR (18.5-37KW) Attend Defect

22

-

-

... More
LT MOTOR (37-55KW) Attend Defect

22

-

-

... More
LT MOTOR (55-90KW) Attend Defect

22

-

-

... More
LT MOTOR (90KW) Attend Defect

22

-

-

... More
DC MOTORS(=10KW)-Attend Defect

3

-

-

... More
DC MOTORS(10-20KW)-Attend Defect

3

-

-

... More
DC MOTORS(20KW) Attend Defect

3

-

-

... More
LT MOTOR (=5.5KW) Connection

55

-

-

... More
LT MOTOR (5.5-18.5KW) Connection

44

-

-

... More
LT MOTOR (18.5-37KW) Connection

33

-

-

... More
LT MOTOR (37-55KW) Connection

22

-

-

... More
LT MOTOR (55-90KW) Connection

22

-

-

... More
LT MOTOR (90KW) Connection

22

-

-

... More
LT (AC and DC) MOTOR, ratings up to 200kW, 12 Weekly Checks

550

-

-

... More
LT MOTOR (=2.2KW) OH / Servicing

33

-

-

... More
LT MOTOR (2.2-5.5KW) OH / Servicing

30

-

-

... More
LT MOTOR(5.5-18.5KW)-OH / Servicing

19

-

-

... More
LT MOTOR(18.5-37KW)-OH / Servicing

10

-

-

... More
LT MOTOR(37-55KW)-OH / Servicing

10

-

-

... More
LT MOTOR(55-90KW)-OH / Servicing

10

-

-

... More
LT MOTOR(90KW)-OH / Servicing

10

-

-

... More
DC MOTORS(=10KW)- OH/ Servicing

2

-

-

... More
DC MOTORS(10-20KW)-OH / Servicing

2

-

-

... More
DC MOTORS(20KW)-OH / Servicing

2

-

-

... More
Deployment of highly skilled manpower for unscheduled jobs

50

-

-

... More
Deployment of skilled manpower for unscheduled jobs

50

-

-

... More
Deployment of semi-skilled manpower for unscheduled jobs

100

-

-

... More
LT MOTOR (=10 KW) Shifting/Replacement

24

-

-

... More
LT MOTOR (10- 30 KW) Shifting/Replacement

24

-

-

... More
LT MOTOR (30-75KW) Shifting/Replacement

24

-

-

... More
LT MOTOR (75-90 KW) Shifting/Replacement

17

-

-

... More
LT MOTOR (90KW) Shifting/Replacement

17

-

-

... More
DC MOTORS(=10KW)-Shifting/Replacement

3

-

-

... More
DC MOTORS(10-30KW)-Shifting/Replacement

3

-

-

... More
DC MOTORS(30KW) Shifting/Replacement

3

-

-

... More
Providing & Fixing of End terminal jointing kit (Indoor Type) for LT cable 3.5Cx 240 Sqmm.

6

-

-

... More
Providing & Fixing of Straight Through jointing kit (Outdoor Type) for LT cable 3.5Cx 300 Sqmm.

6

-

-

... More
PART-C: MAINTENANCE OF HT MOTORS

-

-

-

... More
HT MOTORS (=1000KW)-24 W Checks

80

-

-

... More
HT MOTORS (1000-2500KW)-24 W Checks

5

-

-

... More
HT MOTORS (2500-5000kW)-24 W Checks

24

-

-

... More
HT MOTORS (5000kW)-24 W Checks

5

-

-

... More
HT MOTORS Terminal connection / disconnection

36

-

-

... More
HT Motor weekly checks

104

-

-

... More
HT MOTORS (=1000KW) Attend Defect /Servicing

24

-

-

... More
HT MOTORS (1000-2500KW) Attend Defect /Servicing

2

-

-

... More
HT MOTORS(2500-5000kW)-Attend Defect/ Servicing

6

-

-

... More
HT MOTORS(5000kW)-Attend Defect / Servicing

3

-

-

... More
HT MOTORS (=1000KW) Shifting/rotation

15

-

-

... More
HT MOTORS (1000-2500KW) Shifting/rotation

6

-

-

... More
HT MOTORS(2500-5000kW) Shifting/rotation

6

-

-

... More
HT MOTORS(5000kW) Shifting/rotation

4

-

-

... More
Providing & Fixing of End terminal jointing kit (Outdoor Type) for 11/3.3KV cable upto 3Cx 300 Sqmm.

6

-

-

... More
Providing & Fixing of Straight Through jointing kit (Outdoor Type) for 11/3.3KV cable upto 3Cx 300 Sqmm.

6

-

-

... More
Deployment of highly skilled manpower for unscheduled jobs

50

-

-

... More
Deployment of skilled manpower for unscheduled jobs

50

-

-

... More
Deployment of semi-skilled manpower for unscheduled jobs

100

-

-

... More
Hiring of reputed firm for performing motor current signature analysis of HT motors.

32

-

-

... More
PART-D: LT SWITCHGEAR MAINTENANCE

-

-

-

... More
Maintenance of Power and Control Busbar chambers of LT switchgear and MCC panels

60

-

-

... More
PM of LT Modules

1100

-

-

... More
PM of LT Breakers

385

-

-

... More
Breakdown jobs and checking of LT modules, LT breakers and switchgears

550

-

-

... More
Cleaning of Electrical panels, modules, motors, and Local Control panels

102

-

-

... More
PM of DC motor starter panels

18

-

-

... More
Breakdown jobs of DC motor starter panels

12

-

-

... More
PM of Local Control Panels, ACDBs, DCDB etc.

70

-

-

... More
PM All EOT (except TG hall) Attend defect

86

-

-

... More
PM of Hoists and winches

260

-

-

... More
PM of EOT crane of TG hall

10

-

-

... More
EOT crane of TG hall - attend Defects

30

-

-

... More
Hoists and winches-attend Defect

55

-

-

... More
House Keeping of switchgear area at 3.5m, 12.5m, 28m in CCR area, stairs of CCR Building, Electrical Labs in Service Building & Various areas under EMD-I

104

-

-

... More
Supply & Fixing of 2 Pole 6A 220VDC Control MCB

50

-

-

... More
Supply & Fixing of various PMCC Panel Door locks for Unilec/C&S/L&T Switchgear Panels

600

-

-

... More
Supply & Fixing of Power/Control Terminal Blocks

400

-

-

... More
Deployment of highly skilled manpower for unscheduled jobs

50

-

-

... More
Deployment of skilled manpower for unscheduled jobs

50

-

-

... More
Deployment of semi-skilled manpower for unscheduled jobs

100

-

-

... More
Annual Statutory License Renewal for Hoist/Mono Rail

5

-

-

... More
Shift Operator for Operation of Main Plant MV, LV Switchgear and MCC rooms

2190

-

-

... More
Shift Operator for Operation of LV Switchgear, MCC room of W & WWTP

2190

-

-

... More
PART-E: HT SWITCHGEAR MAINTENANCE

-

-

-

... More
PM of 11kV and 3.3 kV Breakers

215

-

-

... More
Maintenance of Power Busbar of 11 and 3.3 kV switchgear boards

18

-

-

... More
Breakdown jobs and checking of HT breakers and HT switchgears

250

-

-

... More
Deployment of highly skilled manpower for unscheduled jobs

235

-

-

... More
Deployment of skilled manpower for unscheduled jobs

250

-

-

... More
Deployment of semi-skilled manpower for unscheduled jobs

500

-

-

... More
Testing Engineer

200

-

-

... More
Shift Electrical Maintenance

2190

-

-

... More
Shift Operator for Operation of MV, LV Switchgear, MCC room of AHP

2190

-

-

... More
PART-F: SWITCHYARD AND RELATED EQUIPMENTS

-

-

-

... More
Routine checks of Switchyard Equipment

24

-

-

... More
Antiweed Treatment & removal of grass from Switchyard

24

-

-

... More
Troubleshooting of Switchyard Defects

300

-

-

... More
Troubleshooting of SAS/ SCADA System & BCUs/Data Concentrator/BTS/Testing of IEDs

24

-

-

... More
Station Earthing System Checks

75

-

-

... More
Shutdown/Breakdown Maintenance of Switchyard Equipments

730

-

-

... More
Switchyard 220KV Circuit Breaker Replacement

1

-

-

... More
Switchyard 400KV Circuit Breaker Replacement

2

-

-

... More
Circuit Breaker Drive Mechanism Replacement

2

-

-

... More
Switchyard Isolator/earth switch/CT/CVT/LA Replacement

4

-

-

... More
Replacement of damaged ACSR Conductor

300

-

-

... More
Replacement of damaged Clamp/Tightening of Clamp

100

-

-

... More
House Keeping of Switchyard Control Room building

24

-

-

... More
Alignment of Isolators/Earth Switches

50

-

-

... More
Round the clock Monitoring and Recording of parameters of Power Transformers as per SOP

2190

-

-

... More
PART-G: POWER, AUXILIARY AND SERVICE TRANSFORMERS

-

-

-

... More
Routine checks of Transformers/ Reactor rating more than 10MVA

52

-

-

... More
Routine checks of Transformers up to 10MVA

20

-

-

... More
Shutdown/Breakdown Maintenance of Transformer more than 10MVA/ Reactor

10

-

-

... More
Preventive maintenance of Power Transformer more than 10MVA

13

-

-

... More
Preventive maintenance of Transformer up to 10MVA

40

-

-

... More
Cleaning of external surface of Dry Type Transformers and Check-Up Winding Temperatures (Comparison with Temperature Gun and Scanner) (Monthly)

24

-

-

... More
Breakdown maintenance of Transformer up to 10MVA

20

-

-

... More
Oil filtration/replacement of transformers/ Reactor rating more than 10MVA

12

-

-

... More
Oil filtration/replacement of transformers rating up to 10MVA

12

-

-

... More
Oil filtration/replacement OLTC of Power Transformers (Yearly or during planned shutdown or when required)

9

-

-

... More
Oil Sample collection of transformers/ Reactor

100

-

-

... More
Checking and recharging of Air cell of Power Transformers. (Yearly or during planned shutdown or when required)

16

-

-

... More
Bushing Replacement of Transformer more than 10MVA

4

-

-

... More
Cleaning the coils and remove any deposits within the ventilation passage through which cooling air flows in Dry Type Transformers and Checking it connections and clamping bolts tightness (Half Yearly)

24

-

-

... More
PART-H: MAINTENANCE OF DC SYSTEM AND DG SETS

-

-

-

... More
Capacity test of battery banks

20

-

-

... More
Assistance in detection and rectification of earth faults in DC systems

30

-

-

... More
Replacement of defective cells

15

-

-

... More
Monitoring healthiness and maintenance of battery bank

624

-

-

... More
PART-I: MAINTENANCE OF ESP & ASSOCIATED ELECTRICAL EQUIPMENTS

-

-

-

... More
Arresting of oil leakage from high voltage rectifier transformer

54

-

-

... More
Checking, Cleaning, and inspection of ESP area electrical equipments

365

-

-

... More
Annual Preventive & Break-down maintenance of ESP fields/TR panels

150

-

-

... More
Annual Preventive & breakdown maintenance of ESP rectifier transformers

90

-

-

... More
Oil filtration of Rectifier Transformer of ESP

40

-

-

... More
Cleaning and Inspection of High Voltage rectifier transformer

300

-

-

... More
Deployment of highly skilled manpower for unscheduled jobs

40

-

-

... More
Skilled manpower deployment for unscheduled jobs

50

-

-

... More
Semi-Skilled manpower deployment for unscheduled jobs

80

-

-

... More
Replacement of damaged with New/repaired ESP transformer along with negative bushing chamber by dismantling, lowering down, shifting, lifting up & recommissioning and associated works, and connecting it to field

4

-

-

... More
House Keeping of Various PMCCs OF BOP, FGD & ESP Control Room buildings

104

-

-

... More
Shift Operator for Operation of MV, LV Switchgear, MCC room of ESP & FGD

2190

-

-

... More
PART-J: MAINTENANCE OF GENERATOR AND AUXILLIARIES

-

-

-

... More
Round the clock operation and maintenance of Hydrogen/Carbon dioxide manifold room at TG 0 meter along with assistance in daily checking and recording of Generator and its auxiliary’s system (SCWS, Seal oil system and Hydrogen system) parameters and up keeping of various panels of Generator and its auxiliaries systems

2190

-

-

... More
Transportation /Loading/Unloading of Hydrogen filled and empty cylinders from hydrogen storage room to Site area and vice versa

50

-

-

... More
Servicing / Replacement of float trap valve as per scope of work

2

-

-

... More
Servicing / Replacement of valves of H2 Gas/Seal Oil System / Primary Water System Valve as per scope of work

10

-

-

... More
Releasing H2 Gas from generator as per scope of work

4

-

-

... More
Filling of H2 gas in Generator as per scope of work

4

-

-

... More
Replacement of seal oil system duplex Filter as per standard procedure

2

-

-

... More
Repairing works on departmental Hydrogen /Carbon dioxide cylinders by reputed agency

20

-

-

... More
Replacement /Filling of Resin in Deionizer of Stator Cooling Water System

1

-

-

... More
Servicing/Cleaning of Duplex filter (Turbine/Collector side) of seal oil system

12

-

-

... More
Calibration of Generator Hydrogen Gas leak detector equipment viz. Extractive Type Fixed gas detector through reputed Agency

4

-

-

... More
Attending Hydrogen gas Leakage from Generator gas coolers as per scope of work

4

-

-

... More
Replacement of defective generator hydrogen gas cooler

2

-

-

... More
Detecting Hydrogen gas leakage with help of soap solution and attending minor gas leakage from entire generator system

12

-

-

... More
Cleaning of generator outer casing and termination tightness inside terminal box

4

-

-

... More
Cleaning/Measurement of Generator Collector Ring and Brushes at TG 18 meter

104

-

-

... More
Replacement of Filter elements of Main SCWS filter, Deionizer and Make up water of SCWS skid

5

-

-

... More
Servicing/Overhauling/Bearing replacement of SCW/ MSOP/ ESOP Pump as per standard procedure

5

-

-

... More
Attending oil leakages from Seal oil lines, Pipelines, flanges, orifices, oil spillage in the collector housing etc.

4

-

-

... More
PART-K: MAINTENANCE OF EXCITATION SYSTEM

-

-

-

... More
Preventive Maintenance of Generator Excitation system, Initial Excitation Panel, Thyristor Cubicle panel, FCB, Generator system control and Relay panel, AVR panels etc.

12

-

-

... More
PART-J: MAINTENANCE OF GENERATOR AND AUXILLIARIES

-

-

-

... More
Preventive maintenance of Isolated Phase Busduct, Segregated Phase Busduct and AC/DC Bus Duct

12

-

-

... More
Preventive maintenance of LAVT, NGR, NGT cubicles , Air pressurization Cubicle , Hot air Blower

12

-

-

... More
Assistance in opening/closing Jumpers, flexibles, Expansion bellows, Metallic bellows of UAT, GT main/ Delta run, Tap off run of UT/LAVT/Excitation Transformer, Generator Phase/Neutral side during Transformer Testing or other activity etc or during fault

30

-

-

... More
Replacement of rubber/metallic expansion bellows of bus duct

6

-

-

... More
Replacement of flexible links of Generator phase/neutral side, Main run, delta run and tap off run ducts

6

-

-

... More
Replacement of support insulator inside bus duct /Generator adaptor box etc.

10

-

-

... More
Replacement of phase/neutral side protection CT

3

-

-

... More
Deployment of highly skilled manpower for unscheduled jobs

20

-

-

... More
Deployment of skilled manpower for unscheduled jobs

20

-

-

... More
Deployment of semi-skilled manpower for unscheduled jobs

20

-

-

... More
C&I Works Under Jurisdiction of C&IMD-I division

-

-

-

... More
Round the clock Routine maintenance of TG area and associated C&I systems, W&WTP, FDPS & FWPH, IDCT, CW/ACW of 1X660 MW, ETPS, HTPS (3x365x2 shift)

2190

-

-

... More
Routine, Preventive and Breakdown maintenance of C&I system & field instruments of TG area and associated C&I System( W&WTP, IDCT,FDPP & FWPH, CW/ACW,HVAC,CPU system) in general shift (365x2-105+10=635 days)

635

-

-

... More
Overhauling of MOV

220

-

-

... More
Overhauling of Pneumatic actuator / SOV

250

-

-

... More
Overhauling of Hydraulic actuator

50

-

-

... More
Overhauling/Maintenance & Misc. job (Emergency+ Welding) of TG area and associated C&I System.

230

-

-

... More
Overhauling/ Maintenance Manpower support of TG area and associated C&I System.

230

-

-

... More
C&I Works Under Jurisdiction of C&IMD-II division

-

-

-

... More
Round the clock Routine maintenance of SG area and associated C&I systems, FGD & SCR, Ash Handling, ESP, FOPH, of 1X660 MW, ETPS, HTPS. (3x365x2 shift)

2190

-

-

... More
Routine, Preventive and Breakdown maintenance of C&I system & field instruments of SG area and associated C&I System (AHP, ESP, FGD/SCR, Aux. Boiler, AAQMS, EPBAX, CCTV, Air compressor, FOPH, CEMS). (365x2-105+10=635 days)

635

-

-

... More
Lab & Simulator management in general shift (365x2-105+10=635 days)

635

-

-

... More
Overhauling of Hydraulic actuator/ Feed gate valve of BAH

40

-

-

... More
Overhauling of MOV

220

-

-

... More
Overhauling of Pneumatic actuator / SOV/ diff. type Pneumatic operated cylinder

250

-

-

... More
Over hauling / Maintenance & Misc. job (Emergency + Welding) of SG area and associated C&I System

230

-

-

... More
Overhauling Manpower support of SG and associated C&I System.

230

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.