Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited - UPRVUNL Tender
Eprocure
Opening Date14 Sep 2024
Closing Date1 Oct 2024
Tender Amount₹ 26,84,123
Costs
EMD
₹ 55,000Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RVUNL_955866_1Bid Award Id
ViewTender No
T-16/SE-V/BTPS/CHD-I/2024-25Tender Authority
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited ViewPurchaser Address
-Website
http://https://uprvunl.org/uprvunl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
PART-II ( Annual Maintenance work of Old/New Stacker Re-Claimer of CHP, BTPS. )
-
-
-
Replacement of damaged side rubber packing of boom/intermediate conveyor of old/New Stacker/Re-claimer.
20
-
-
Replacement of box duct packing of reclaiming/stacking chute of conveyor No. 16, K-10 related to old/new Stacker/Re-claimer.
10
-
-
Replacement of bolt of damaged teeth/damaged teeth by repaired/ new one bucket wheel of old/new Stacker/ Re-claimer.
50
-
-
Replacement of tensioning screw by old & usable/new, after adjustment of belt and to provided proper tension of belt boom/intermediate conveyor of old/new S/R.
10
-
-
Proper winding of unwounded cable on control cable reeling drum after complete cleaning and greasing of moving structure of old/new S/R, each job per 50 Mtr.
40
-
-
Proper winding of unwounded cable on power cable reeling drum after complete cleaning and greasing of moving structure of old/new S/R, each job per 50 Mtr.
20
-
-
Proper cleaning & greasing of spur gear of slewing system old /new Stacker/Re-claimer.
10
-
-
Draining out the contaminated oil of the tank of hydraulic unit after complete cleaning & refilling with new/ old along with shifting from store to site and vice versa.
2
-
-
Replacement of damaged coupling bolts along with bush of flexible coupling travel system/boom conveyor / slewing system.
15
-
-
Replacement of contaminated oil/refilling in reduction gear boxes of travel / slewing / boom/intermediate conveyor/bucket wheel.
10
-
-
Cleaning & greasing of driving bogies and non driving bogies of old/new Stacker/Re-claimer.
48
-
-
Proper cleaning and greasing of chain along with chain sprocket/reeling/guide wheel bogies of control/power cable reeling drum of old/new Stacker/Re-claimer.
15
-
-
Replacement/readjustment of brake shoe of brake system of old/new Stacker/Re-claimer.
8
-
-
Re-placement of damaged oil seals of reduction gear boxes of boom/intermediate conveyor, bucket wheel of old/new Stacker/Re-claimer:
10
-
-
Replacement of damaged oil seal ‘O’ ring of fluid coupling FCU 16.25 of old/new Stacker/Re-claimer:
5
-
-
Replacement of damaged resilient plate, multi disc of fluid coupling of new/old Stacker/ Re-claimer:
10
-
-
Replacement of rubber pad of vibrating feeder tray of new/old stacker Re-claimer:
3
-
-
Replacement of rubber packing of vibrating feeder tray of old/new Stacker/Re-claimer:
5
-
-
Complete cleaning of chocking oil/grease circulating hoses, ‘T’ joints NRV/grease pump and replacement of same if required of old /new Stacker/Re-claimer:
6
-
-
Repairing of damaged shaft of pulley after dismantling and removal from foundation including dismantling and re-fixing of tray at boom/intermediate conveyor at side of old/new Stacker/Re-claimer:
5
-
-
Re-adjustment of rail clamps after re-railment in its poison on travel rail of old/new Stacker/Re-claimer:
10
-
-
Alignment of complete system of motor to reduction gear boxes of slewing system/travel system/boom intermediate conveyor/bucket wheel of old/new Stacker/Re-claimer:
10
-
-
Cleaning/ replacement/repairing of pressure relief valve/directional valve, NRV of discharge line/elbow of discharge line/oil filters of new stacker/Re-claimer:
10
-
-
Replacement/repairing of axial piston pump of hydraulic unit along with the alignment with motor for hoisting system of new/Stacker/RE-claimer:
5
-
-
Servo coating/greasing of wire rope and moving wheel of travel trolley conveyor 16/K-10 hoisting system of old /new Stacker /Re-claimer:
10
-
-
Repairing/Replacement of thruster assembly of travel /slewing /hoisting system of new /old Stacker Re-claimer:
10
-
-
Cleaning & greasing of slewing spur gear and boom conveyor hydraulic cylinder hings of new Stacker Re-claimer:
8
-
-
Cleaning & oiling of slewing pivot bearing of old Stacker/ Re-claimer.
10
-
-
Overhauling of angular gear box of power/control cable reeling drum system of new/old Stacker /Re-claimer:
12
-
-
Overhauling of oil lubricating pump for bucket drive gears NRV of slewing gears.
4
-
-
Fabrication & installation of duct plate assembly for intermediate conveyor at site of new Stacker/Re-claimer.
2
-
-
Removal of top cover of the reduction gear boxes of travel system of old/new S/R to check the gear teeth and bearings.
5
-
-
Adjustment of belt while going out on drive non-drive pulley along with roller structures of boom/intermediate conveyor of old/new Stacker/Re-claimer:
10
-
-
Replacement of side plate of Re- claiming /stacking box duct of old/new S/R, conveyor 16K-10 after fabrication at side: Upto 2 Mtrs.
1
-
-
Above 2 Mtrs.
1
-
-
Replacement of damaged fluid coupling by new/repaired:
6
-
-
Replacement of damaged bearing /oil seals of raping gear box of motor assembly of power and control cable reeling drum along with its alignment for new/old Stacker Re-claimer:
10
-
-
Replacement of damaged oil seals/bearings of gear boxes of travel system of old/new Stacker /Reclaimer:
10
-
-
Replacement of different type of rollers at the box duct of conveyor of old/new Stacker/Reclaimer
100
-
-
Replacement of pollard/covered bearing of different pulleys of conveyor system except gravity take up pulley, drive pulley:
15
-
-
Repair of damaged guide channel of gravity take up including all cutting welding and transportation of material from store to site and back:
50
-
-
Different works to be carried out in the gear box of old/new stacker-Reclaimer system
-
-
-
Removal of the top cover of the gear box and to install the same after checking/completion of the work.
3
-
-
Replacement of the input pinion shaft/bearing of slewing/bucket wheel/transmission gear box including removal and fixing of top cover of the gear box.
3
-
-
Replacement of the intermediate pinion shaft/bearing of slewing/bucket wheel/transmission gear box including removal and fixing of top cover of the gear box.
3
-
-
Replacement of the output shaft fitted with wheel/bearing of slewing/bucket wheel/transmission gear box including removal and fixing of top cover of the gear box.
3
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements