Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited - UPRVUNL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date10 Jun 2024
Closing Date22 Aug 2024
Tender Amount₹ 38,90,799
Costs
EMD
₹ 39,000Document Cost
₹ 3,540Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RVUNL_927426_1Bid Award Id
ViewTender No
ET-27/OMC-IV/EMD-I/CTPS/24-25Tender Authority
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited ViewPurchaser Address
-Website
http://https://uprvunl.org/uprvunl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
1.2 Preventive maintenance of 220/132KV and attending oil leakage of CT & PT.
8
-
-
1.3Preventive maintenance of 220kV Sequential isolator without bearing overhauling.
4
-
-
1.4 Attending air leakages from 220KV Air Derived CB.
6
-
-
1.5 Attending gas leakage & filling of SF6 gas in 220KV SF6 breaker in emergency.
10
-
-
1.6 Replacement of 220KV L.A including terminal cabling and connected works.
2
-
-
1.7 Carriage/Arrangement of 25 KL Oil Tank including its Loading & unloading (to and fro) at 9T T/F HTPS Ka
2
-
-
1.8 Cleaning greasing and adjustment of isolator without O/H of bearings.
20
-
-
1.9 Attending Hot Spot points in Switchyard and Transformer yard CTPS, HTPS.
100
-
-
2. Following works are to be carried out for removing the pollution deposits from the insulator discs and petticoats of 220KV Switchyard bays equipments
-
-
-
2.1 Bay equipments located on auxiliary structure which are supported on ground.
5
-
-
2.2 220KV bus-1, Bus- II & transfer bus.
5
-
-
2.3 Supported insulator string discs/ buses.
4
-
-
3. Disconnection & Re-connection of Jumper from SF6, Breaker/CTs/PTs.
40
-
-
4. Following works are to be carried out for removing the pollution deposits from the insulator discs and petticoats of 220KV Switchyard bays equipments
-
-
-
4.1 Breakdown maintenance of electrical and electronic control, annunciation and protection system including the cost of consumables and spares required to attend the fault.
30
-
-
4.2 Minor overhauling of compressors for Air Drive CB.
10
-
-
5. Replacement of damaged post insulators/post insulator with isolator arm as per following scope of work (i) Jumper to be opened of the post insulator of one phase.(ii) Damaged post insulator to be removed after opening the Nut & Bolts.(iii) New healthy post insulator to be replaced.(iv) Jumpering to be done after completion of work.
30
-
-
6. Maintenance of Bus Bar(i) Damaged/defective ACSR Dear/DOG Conductor to be dismantled from Bus Bar, dropper of Isolator, CT, PT as per opening its PG Clamps, T-Clamps etc.(i) Damaged/defective ACSR Dear/DOG Conductor to be dismantled from Bus Bar, dropper of Isolator, CT, PT as per opening its PG Clamps, T-Clamps etc.(i) Damaged/defective ACSR Dear/DOG Conductor to be dismantled from Bus Bar, dropper of Isolator, CT, PT as per opening its PG Clamps, T-Clamps etc.
500
-
-
7. Maintenance of Bus Bar
(i) New ACSR Conductor to be replaced with attachment i.e., PG Clamps, T-Clamps, End clamps etc.
(ii) Jumpering to be done as original.
500
-
-
8. Replacement of Gaskets & Valves of Transformers
-
-
-
i) Replacement of Valves Gasket
3
-
-
ii) Replacement of Gasket of each pole of HT Bushings
3
-
-
iii) Replacement of damaged radiator of LT transformer
3
-
-
9. Providing manpower for performing different tests such as Tan Delta Test, Primary Injection Test, Circuit Breaker Timing, Contact Resistance etc. of CTs, PTs, CBs, CVTs, isolators etc. as per following scope of work: -(i) Shifting of Testing Equipment from Test Lab to site. (ii) Opening the jumpers/clamps of CT/PT/LA/CB/CVT/ Isolator/Transformers etc. from both sides as decided by Engineer Incharge.(iii) Connection of Test Leads to the equipment to be tested.(iv) After testing, tightening of jumpers/clams to the equipment to be tested as decided by Engineer Incharge.(v) Shifting of Testing Equipment to be tested from site to Test Lab.(vi) One job means performing test on one number CT or PT or CVT or CB one pole.
120
-
-
10. Tightening of flexible jumpers & nut-bolts, earth strips etc. of one bushing of Unit # 07 Generator bushing/GT LV side maintenance.
15
-
-
11. Replacement of damaged flexible jumpers of one bushing of Unit # 07 Generator bushing/GT LV side maintenance.
6
-
-
12. DG set maintenance of ‘B’ & ‘C’ TPH (Providing manpower for service support for replacement of damaged rim gear, self, balancing of DG set etc.)
4
-
-
PART B
-
-
-
1. Removal of old and damage PVC / XLPE armoured power cables of following size:Upto 3x95 Sq. mm
1000
-
-
2. Removal of old and damage PVC armoured power cables of following size: Upto 24x2.5 Sq. mm.
2000
-
-
3. Shifting of new PVC/XLPE armoured power cables and laying, dressing & tagging of the same:Upto 3x95 Sq. mm
2000
-
-
4. Shifting of new PVC armoured control cables and laying, dressing & tagging of the same:Upto 24x2.5 Sq. mm
6000
-
-
5. Jointing of old and damage PVC / XLPE armoured power cables including jointing kit & other consumables of following size:Upto 3x95 Sq. mm
40
-
-
6. Jointing of old and damage PVC armoured power cables including jointing kit & other consumables of following size:Upto 24x2.5 Sq. mm
100
-
-
PART C
-
-
-
To look After Regular Work in 220/132KV Switchyard.(including Sunday and Holidays) by providing 02 manpower (01 Skilled and 01 semi-skilled) alongwith cleaning work mentioned in scope of work.
730
-
-
PART D
-
-
-
Service support for monitoring & testing of different equipments of Switchyard and MCR Panels of EMD I C TPS for round O’clock in 03 shifts (01 person per shift) (as per Scope of work )
2190
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements