Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited Tender
If you're a registered bidder for etender UP and want to inquire about any e-tender UP government has posted, this is your stop. No need to enter every detail on the website of <a href="https://etender.up.nic.in">etender.up.nic.in</a> - BidAssist filters will help you find the exact UP etender you're looking for. Read to learn how to search & bid for etender UP.
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited - UPRVUNL Tender
Eprocure
Opening Date15 Jun 2021
Closing Date5 Aug 2021
Tender Amount₹ 21,15,723 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 44,000Document Cost
₹ 590Tender Fee
Refer Documents
Summary
Routine And Breakdown Maintenance Of Cmr System
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_RVUNL_594992_1Bid Award Id
ViewTender No
T-03/BMD-I/ATPS/2021-22Tender Authority
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited ViewPurchaser Address
-Website
http://https://uprvunl.org/uprvunl
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Replacement of damaged carrying / return / impact idlers by new / repaired
200
-
-
Replacement of damaged idler frame / bracket
40
-
-
Repairing of damaged carrying / return / impact idlers
40
-
-
Re-fixing of dislocated idlers from their frames / brackets
20
-
-
Repairing of idlers frame/bracket by cutting, welding and machining.
4
-
-
Splicing of belt and preparation of joint including removal of roller structure etc. required for carrying out the work and refitting the same after completion of work
-
-
-
by hot vulcanizing joint
2
-
-
by cold vulcanizing joint
10
-
-
Conveyor belt jointing by means of clamping system work including removing of idlers and refitting the same after completion of work. Clamp for jointing shall be arranged by the agency.
2
-
-
Laying of new / old & healthy conveyer belt
100
-
-
Removal of damaged belt and shifting of the same to scrap yard
100
-
-
Replacement/repairing of pyrite hopper gate/flap/shaft etc.
30
-
-
Repairing of pyrite hopper body by cutting, welding, patching etc.
15
-
-
Replacement of different types of damaged pullies
-
-
-
Head Pulley
2
-
-
Snub / Bend Pulley
2
-
-
Take-up Pulley
2
-
-
Tail Pulley
2
-
-
Repairing of different damaged pullies of CMR system already removed by cutting, welding, machining etc.
2
-
-
Replacement of damaged bearing / plumber block / sleeve of different pullies
5
-
-
Replacement of bearings of gear box of CMR system
3
-
-
Attending oil leakage from gear box of CMR system
3
-
-
Complete overhauling of gearbox of CMR system
2
-
-
Removal and remounting of coupling of gear box / motor
1
-
-
Alignment of gear box with motor & main pulley
2
-
-
Complete overhauling of pyrite hopper assy.
2
-
-
Neoprene rubber lagging on different pullies (herring diamond / bones grooved + 5% shore hardness 10 to 12 mm thick neoprene rubber will be arranged by agency)
2
-
-
Cleaning of storage bin
2
-
-
Complete overhauling of Sump Pumps
2
-
-
Repairing of take-up guides and their positioning, strengthening etc.
3
-
-
Repairing of flap gate of storage bin
3
-
-
Replacement of liner plate of storage bin
2
-
-
Replacement of liner plate of pyrite hopper
3
-
-
Replacement of damaged gearbox by new /repaired.
1
-
-
Removal, fabrication, re-erection and alignment of damaged/ eroded stringer, channel, support, deck sheet etc, of conveyer bed.
10
-
-
Removal, fabrication and re-installation of worn-out/damaged hopper plate from gratings of CMR system along with their supporting channels/beams/angles etc.
4
-
-
Fabrication of new pyrite hopper gate.
10
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements